RECOMMENDED ACTION
CONTINUED TO
FILE NUMBER
Increase the contingency for the Broadway Rehabilitation Project by $80,000, which will
increase the total funds available for the construction contract with All American Asphalt, Inc., to
$2,767,682.
DISCUSSION
On July 16, 2012, the City Council awarded a contract for the Broadway Rehabilitation Project to
All American Asphalt, Inc., in the amount of $2,443,348. The City Council also authorized a 10
percent construction contingency in the amount of $244,334, for a total authorized construction
contract expenditure limit of $2,687,682. The project is currently 98 percent complete.
This project consists of reconstructing the pavement; replacing curb and gutter, sidewalks, and
curb ramps; and upgrading the antiquated streetlight system along Broadway from McFadden
Avenue to Borchard Avenue. The high voltage streetlight system is very inefficient, requires
extensive maintenance, and can be very dangerous if a streetlight is knocked down.
The streetlight portion of this project requires the contractor to separate the high voltage streetlights
along Broadway from the existing high voltage system at Birch Street and Russell Avenue (see
Exhibit 1). The work includes removing the single high voltage (5,000 volts) wire from the existing
conduit, installing three new wires into the existing conduit, installing new metal halide fixtures, and
installing conduit and wire to an existing 240V service pedestal located one block east of Broadway
on Borchard Avenue.
The methodology described above to upgrade antiquated streetlight systems has been
successfully completed in other areas of the City. Moreover, this methodology has proven to be
the most cost effective solution to improve and upgrade existing streetlight systems.
23C-1
CONTINGENCY INCREASE
BROADWAY REHABILITATION PROJECT
May 6, 2013
Page 2 of 4
When the contractor was performing the Broadway streetlights work at Birch Street and Russell
Avenue, it was unexpectedly discovered that the streetlights were interconnected, unlike what is
shown on the as-builts (see Exhibit 1). We found similar conditions at Wilshire Avenue and
Borchard Avenue (see Exhibit 2). Essentially, the existing streetlight system was found to be a
continuous loop, and separating the system was not anticipated. Therefore, the planned streetlight
upgrades need to be expanded as shown on Exhibit 2.
The extra work includes all of the streetlights on Ross Street and Birch Street between McFadden
Avenue and Edinger Avenue at a cost of $162,989. That cost is within the existing contract
contingency.
However, while performing the extra work and exposing the added conduits, they were found to be
severely deteriorated and damaged beyond repair by corrosion and tree roots, necessitating
conduit replacement at an added cost of $93,461. That brings the total cost of the streetlight
upgrades to $256,450, and that amount exceeds the contract contingency by approximately
$80,000 (see Exhibit 3).
The extra work is necessary in order to complete the work and turn the lights back on. Deferring
the conduit replacement would mean the streetlights will be off in the Wilshire Square
neighborhood, and the cost would be higher due to the added re-mobilization cost. Having the
streetlights off for an extended time also increases the City's liability exposure. Therefore, it is
recommended to increase the project contract contingency by $80,000.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
The financial impact is a 3.3% extra cost over the standard contingency for a $2.77 million
contract. Funds are available in the Proposition 1 B Fund (Accounting Unit 03017660).
Rau odinez II
Executive Director
Public Works Agency
RG:SA
APPROVED AS TO FUNDS AND ACCOUNTS:
TQS??t I-11L?si",
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
TktA-
23C-2
CONTINGENCY INCREASE
BROADWAY REHABILITATION PROJECT
May 6, 2013
Page 3 of 4
¦
¦
¦
Lt
-0r
79 ¦
¦
¦
%F
¦
13
¦
¦
¦
¦
¦
¦
y ?
.
¦
•
EdRGERAV m ___.---
Exhibit 1 a - As-Built
Original Scope of Street
Light Upgrades
23C-3
I
' ,e:
X
I
I
Ni9
.J1
2:n
2,5
1.
»9
!33
q?
45
d9
1
5
1 '
D/
3
Exhibit 1 b -Actual Condition
040 _ _
CONTINGENCY INCREASE
BROADWAY REHABILITATION PROJECT
May 6, 2013
Page 4 of 4
Authorized vs. Expended Funds
Contract Amount
Awarded Amount $2,443,348
Contract Qty Adjustment ($128,851)
C0#1 $141,191
CO#2 $45,000
CO#3 $10,455
Total Construction $2,511,143
Cost Extra % -5.3%
CO#4 (Proposed Street Lights) $256,450
Total Estimated Final Cost $2,767,593
3.3% Aggregate
Authorized Amount
Contract $2,443,348
Contingency $244,334
Total Authorized $2,687,682
Total Estimated Final Cost $2,767,593
Total Authorized to Date $2,687,682
Requested Additional Funds $79,911
Exhibit 2-Authorized vs. Expended Funds
23C-4