Loading...
HomeMy WebLinkAbout23C - PROJ - FLOWER ST BIKE TRAILREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: AUGUST 5, 2013 TITLE: CONTRACT AWARD FOR THE FLOWER STREET BIKE TRAIL FROM MACARTHUR BLVD. TO SUNFLOWER AVE. (PROJECT 12-2620) lr'?e; CIT AGER RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ? As Recommended ? As Amended ? Ordinance on 1s' Reading ? Ordinance on 2ntl Reading ? Implementing Resolution ? Set Public Hearing For CONTINUED TO FILE NUMBER Award a contract to the lowest responsible bidder, Green Giant Landscape, Inc., in accordance with the Base Bid plus Bid Item Nos. 47 and 49 of Add Alternate 1, totaling $968,500 for the construction of Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. 2. Approve the Cost Analysis for a total estimated project delivery cost of $1,259,050. DISCUSSION The recommended action will allow the City to proceed with construction of the Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. The project has received budget and funding approval, and is part of the City's Capital Improvement Program. Project design is complete and bid procedures have been followed, as established by the City's Municipal Code and in adherence to the Public Contracts Code. The Flower Street Bike Trail is part of the Golden Loop Recreational Trail, a 24-mile regional trail that meanders through the city and is part of the OCTA Commuter Bikeways Strategic Plan, providing facilities for biking, jogging, and walking. The Flower Street Bike trail is adjacent to local elementary, intermediate, and high schools; South Coast Metro Arts and Entertainment District; South Coast Plaza; and Metro Pointe Shopping Center. On June 21, 2010, the City Council authorized the application for project funding through the Transportation Enhancement (TE) Program administered by the Orange County Transportation Authority (OCTA). OCTA authorized TE federal funding for up to $500,000 for this project. Additionally, the State Recreation Trail Program approved funding in the amount of $550,000. Both of these grants are designated for transportation projects to integrate various modes of transportation facilities into our community. 23C-1 Contract Award for the Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. August 5, 2013 Page 2 The Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. project consists of installing a 10-foot-wide asphalt bicycle trail, irrigation, and landscaping along the flood channel that runs parallel to Flower Street, as shown in Exhibit 1. The proposed project will accomplish the following objectives: 1) Provide regional commuter linkages within (and beyond) the city limits and expand commuter opportunities on a regional level by connecting the Sunflower bike lane to the Flower Street bike trail. 2) Expand recreational opportunities on a regional level, as the Golden Loop trail provides linkages to extensive trail systems throughout Santa Ana and Costa Mesa that connect to other neighboring cities in Orange County; 3) Improve safety of walkers, joggers, cyclists, skaters, and equestrian users, and allow full trail accessibility for persons with disabilities; and 4) Address neighborhood concerns regarding the appearance of this section of Flower Street. The Notice Inviting Bids was advertised on June 7 & 8, 2013, and bids were opened on June 27, 2013. A summary of the bid invitations mailed, bids received, and bid results are as follows: Contractor Participation Data Santa Ana Contractors receiving notices: 16 Contractors requesting bidding documents: 18 Bids received: 9 Bids received from Santa Ana Contractors: 0 Bid Results Summary RANK BIDDER NAMES LOCATION BASE BID 1 Green Giant Landscape, Inc La Habra $874,500.00 2 Diversified Landscape Management, Inc. Corona $916,088.47 3 CS Legacy Construction, Inc. Chino $924,784.00 4 Two Brothers Construction Company Buena Park $930,329.43 5 GMC Engineering, Inc. Tustin $934,000.00 6 KASA Construction, Inc. Ontario $967,540.00 7 YAKAR San Dimas $1,059,190.00 8 Minako America Corporation dba Minco Construction Gardena $1,259,340.78 9 PUB Construction, Inc. Diamond Bar $1,349,016.74 23C-2 Contract Award for the Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. August 5, 2013 Page 3 A total of nine bids were received and deemed responsive. The bid results and the lowest responsive bid by Green Giant, Inc., in the amount of $874,500, compares favorably with the Engineer's Estimate of $1,028,100. Due to the favorable bid pricing, staff recommends inclusion of Bid Item Nos. 47 and 49 of Add Alternate 1 as part of this award, which provides security lighting and an 8-foot wrought iron fence in the amount of $94,000. The inclusion these additional items bring the contract total to $968,500. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, this project is exempt from further review. Categorical Exemption Environmental Review No. 2006-197 was filed for this project. In addition, a Certification of Categorical Exemption and a Statutory Worksheet have been prepared in accordance with the National Environmental Policy Act. FISCAL IMPACT The Project Cost Analysis, as shown in Exhibit 2, determined that the total funds needed to deliver the project are $1,259,050. The total cost includes construction, construction administration, testing, and contingencies. Funding to cover costs is available in the Parks Acquisition and Development Fund (Account 31313260-66220), Transportation Enhancement Fund (Account 05917660-66220), and the Recreational Trail Program Fund (Account 17213240- 66220). 'Edwin "William" Galyez;-P.E. Acting Executive Director Public Works Agency Gerardo Mouet i Executive Director Parks, Recreation, and RG/ET Exhibit 1: Project Location Map 2: Cost Analysis APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez Executive Director Finance & Management Services Agency Services Agency 23C-3 23C-4 Description: Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. - Construction of a 10-foot wide by one-half mile long asphalt bicycle trail, including landscaping, irrigation, security lighting, wrought iron fencing and trailhead plaza. MACARTHUR 11 SUNFLOWER ST EXHIBIT 1 SANTA ANA 1711 "IA MY COUNOL PROCT RSTPLE; 50W (143) 12-2620 AuGuffr A5. 2 I F M MACARTHUR BLVD. To SUNFLOWER AVE. I PAf3E t of 7 W P EXHIBIT 1 23C-5 23C-6 COST ANALYSIS PROJECT NO. 12-2620 CONTRACT AWARD FOR FLOWER STREET BIKE TRAIL FROM MACARTHUR BLVD. TO SUNFLOWER AVE. Construction Contract $968,500 Contract Administration $96,850 Inspection and Testing $29,055 Survey $19,370 Contingencies $145,275 TOTAL ESTIMATED CONSTRUCTION COSTS $12L9 050 EXHIBIT 2 23C-7 23C-8