HomeMy WebLinkAboutCHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (2) Recording Requested By, Recorded in official Records, Orange County
And When Recorded Mail To: flu h N uyen, Clerk-Recorder �������������
Clerk of the Council, City of Santa Ana I�� JII�
11111 JJII��111��4111 III[
hill]I4�111�� NO F E E
20 Civic Center Plaza,P.O.Box 1988 * $ R 0 0 0 7 1 3 1 8 0 7 $
Santa Ana,CA 92702 201400051753210:15 am 12102114
42 416 N12 1
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
THIS SPACE FOR COUNTY RECORDERS USE ONLY
1
3
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a
municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana,
California, 92701, is the owner of the property hereinafter described, that said owner has caused
construction of BROADWAY .REHABILITATION — CIVIC CENTER DRIVE TO SANTA
U 0 CLAR_A AVENUE AND BROADWAY AND WASHINTON AVENUE WATER' MAIN
IMPROVEMENTS under contract entered into on August 5, 2013,. with CHRISTENSEN
w BROTHERS GENERAL ENGINEERING INC., on which contract NORTH AMERICAN
o z SPECIALTY INSURANCE COMPANY is surety. The property on which such work
aimprovement was placed is in the City of Santa Ana, County of Orange, State of California, and
c ? described as Project No. 11,-6743 & 11-6415 located at: BROADWAY. The work improvement
on said property was accepted as completed on November 14, 2014.
� o
CITA A,A M ICIPAL CORPORATION
rA
by
U 0. Dated: City Enginee —Edwin"William"Galvez
TITLE --
-------------------------------------------------------------------------------------- . ---
VERIFICATION
I, the undersigned, say: I am the City En ineer- Edwin"William"Galvez of
the City of Santa Ana, California; I executed the foregoing Notice of Completion acting on
behalf of the owner of the property therein described; I make this verification on behalf of said
corporation by authorization of the City Council of the City of Santa Ana; I have read said notice
and know the contents thereof; and I declare under penalty of perjury that the facts therein stated
are true.
Executed on °� � at S to Ana, Calif a
(Signature of individual swearing that the
contents of Notice of Completion are true.)
THIS NOTICE OF COMPLETION MOIST BE RECORDED WITHIN TEN(10)DAYS AFTER.COMPLETION
_ he
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
APRIL 15, 2014
TITLE:
H
CONTINGENCY INCREASE FOR
BROADWAY REHABILITATION AND
WATER MAW IMPROVEMENTS FROM
CIVIC CENTER DRIVE TO SANTA CLARA
AVENUE (PROJECTS 11116743 & 116415)
CITY MANAGE
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED, oy-AI' Idl
I As Recommended o? ,3,
❑ As Amended
❑ Ordinance on 1" Reeding
❑ Ordinance on 2ntl Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUEDTO
Increase the contract contingency for the Broadway Rehabilitation and Water Main
Improvements Project by $650,000, which increases the Christensen Brothers General
Engineering, Inc., construction contract to a maximum of $5,383,144.65.
2. Authorize the City Manager to execute change orders in an amount not to exceed the total
authorized contract.
DISCUSSION
The recommended action will allow the City to cover cost extras anticipated on Broadway north of
17th Street similar to those conditions encountered south of 17th Street. These cost extras are
related to underground and pavement conditions on Broadway that were unforeseen.
The Broadway Rehabilitation Project consists of upgrades and /or replacement of underground utilities,
including the city's water main and water services, followed by street improvements including
replacement of curb and gutter, removal and replacement of damaged sidewalks and curb ramps, and
reconstruction of the pavement. The work limits on Broadway are between Civic Center Drive and
Santa Clara Avenue.
On August 5, 2013, the City Council awarded a contract to Christensen Brothers General
Engineering, Inc., in the total amount of $4,733,144.65, which included a 10 percent contingency.
While potholing the existing utilities in advance of installing the new water main along Broadway,
unforeseen concrete pavement was encountered beneath the street, despite coring logs that
showed cement treated base at certain locations. Staff also discovered that a sewer trench
constructed in the late 1960's was not properly compacted, causing significant voids under the
concrete pavement. Consequently, these unforeseen conditions resulted in necessary redesign
and additional quantities of asphalt to pave the street.
Contingency Increase
Broadway Rehabilitation Project
April 15, 2014
Page 2
The underground work on Broadway south of 17th Street is nearly completed, and the pavement
conditions have been fully revealed. Staff is anticipating similar conditions north of 17th Street and
staff therefore recommends making financial preparations to accommodate cost extras without
delaying the construction activities. This is critical now that the project is in the second half of the
construction phase.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Funding for the increased construction contingency of $650,000 for the Broadway Rehabilitation
and Water Main Improvements Project is available as follows:
• $200,000 - Traffic Congestion Relief HUT Fund (Account 05917663- 66220)
• $450,000 - Water Utility Capital Projects Fund (Account 0661'7647 - 66301).
The Revised Cost Analysis (Exhibit 1) has been adjusted to reflect the total estimated project
delivery cost of $5,813,430.65.
Edwin "William" GaiVez, P.E.
Interim Executive Director
Public Works Agency
EWGltc
Exhibit: 1. Revised Cost Analysis
APPROVED AS TO FUNDS AND ACCOUNTS:
nnm Q �
Francisco Gutierrez p
Executive Director �W
Finance & Management Services Agency
REVISED COST ANALYSIS
PROJECT NOS. 116743 AND 116415
CONTRACT AWARD FOR BROADWAY REHABILITATION AND BROADWAY
AND WASHINGTON AVENUE WATER MAIN IMPROVEMENTS
Construction Contract (base) $4,302,858.65
Contingency (Original 10 %) $430,286.00
Added Contingency ( -15 %) Recommended $650,000.00
$5,383,144.65
Contract Administration $172,114.00
Inspection and Testing $129,086.00
Survey $129,086.00
TOTAL ESTIMATED PROJECT DELIVERY COSTS $5,813,430.65
Exhibit 1
To:
►f-
David Cavazos
City Manager
Edwin "William" Galvez
Interim Executive Director
From: Public Works Agency
Date: March 24, 2014
Project No. 116743 and 116415
Broadway Rehabilitation and Water Main Improvements
Subject: Change Order No. 1
UJ
Contractor: Christensen Brothers General Engineering, Inc.
21288 Papago Road
Apple Valley, CA 92307
�.�
,. w
Project Description: Roadway and Water Main Line Improvements
Change Order Number:
Accounting Unit - Account - Activity Number:
JUSTIFICATION
Extra Work at Time and Material
Change Order Total: $284,510
11674303028 - 03017660
11674304028- 05917663
11674305028- 03217662
11641501028- 06617647
While potholing the water main and services on Washington Avenue, several utility
conflicts were encountered. The water main at STA 12 +75, 23 +00 and 30 +75 was
redirected from the original alignment to avoid irremovable obstructions, including
an electrical vault and gas line encasements. Also, various unforeseen obstructions
were found and needed to be removed (PCO# 4,6,8,9,12,13,17,18,43 and 44).
The Water Resources Department requested additional work not included in the
original scope of work. This work included abandoning two valves at Parton Street,
removing a 12" "TEE" connection at Van Ness Street and relocating several water
services on the existing 12" cylinder main. (PCO# 5,16,19,20,34 and 41).
The change order provides compensation for delays associated with production
loss. A prior approval was granted on November 18, 2013.
FINAL COST $101,405
Extra Work at Agreed Price
2. Prior to the start of construction on Broadway, the proposed traffic control plans
were reviewed in conjunction with traffic flow and public convenience. To help
Project No. 116743 and 1'. ;15
Request for Approval of Change Order No. 1
March 24, 2014
Page 2 of 3
mitigate potential conflicts, the contractor was directed to furnish and install 3
additional static signs, 2 changeable message signs, 2 speed feedback signs and 8
credit signs (project acknowledgement). These items were not part of the original
bid.
In addition, the project phasing was revised to minimize the impacts to business
owners and residents. Field modifications were made to increase safety, including
signage, striping and lane delineation. A prior approval was granted on January 6,
2014 (PCO# 1- 3,14- 15,29,50 and 52).
AGREED PRICE $183,123
Extra Work at Agreed Unit Prices
3. While potholing the water main and services on Broadway, existing buried concrete
pavement was encountered. The coring results indicated that cement treated base
was present beneath the asphalt concrete pavement but once exposed, the
material was more difficult to remove and required additional saw cutting or
breaking prior to removal. The export of the spoils was hauled to a different plant for
further processing and disposal.
The proposed pavement structural section was revised to incorporate the existing
buried concrete pavement in the center lanes. The buried concrete pavement in the
outer lanes has to be removed to allow for construction of the water main and curb
and gutter. These modifications will not sacrifice the integrity of the pavement,
maintaining a design -life expectancy of at least 20 years.
The following contract items were deleted or decreased to allow for the change in
scope.
Item #
Bid Item
Unit
Quantity
Unit Price
Amount
3
Cold Milling (3")
SF
- 10,400
$0.54
- $5,616.00
4
Pulverized Material and Cement -
Treated Base(CTB)
SF
- 241,900
$0.89
- $215,291.00
5
Additional 1% Cement Content
SF
- 241,900
$0.23
- $55,637.00
6
Remove Excess Pulverized Material
CY
-5,300
$20.52
- $108,756.00
7
Pavement Fabric
SY
- 17,850
$5.30
- $94,605.00
21
Furnish and Install Survey Monument
EA
-20
$1,387.93
- $27,758.60
33
Furnish and Install CPS Unit
EA
-3
$1,115.56
- $3,346.68
Subtotal
- $511,010.28
Project No. 116743 and 1 15
Request for Approval of Change Order No. 1
March 24, 2014
Page 3 of 3
The following contract items were added to allow for the change in scope.
Item #
Bid Item
Unit
Quantity
Unit Price
Amount
56
PCC Pavement Removal (6 ")
CY
1,760
$100.67
$177,179.20
57
Cold Milling IV)
SF
365,000
$0.88
$321,200.00
58
AC Grinding (Placement) - 1251bs /cft
TN
780
$16.17
$12,612.60
Subtotal
$510,991.80
BID ITEM ADJUSTMENT -$18
ACCOUNTING UNIT COST ANALYSIS
CCO Item Number
Accounting Unit
Accounting Unit Cost
Total Amount
1
11641501028- 06617647
$101,405
$101,405
2
11674303028 03017660
$120,000
2
11674305028- 03217662
$63,123
$183,123
3
11674304028- 05917663
- $18.18
-$18
Total
$284,510
CONTRACT COST SUMMARY
Original Contract Total $4,302,858.65
Previous Change Orders $ 0
% of Contract
0%
Change Order 1 $284,510 Increase 6.61%
Total CCO to date $284,510 Increase 6.61%
Adjusted Contract Total $4,587,368.60
SCHEDULEIMPACT
An additional 15 working days will be provided for delays associated with this
change order.
4�tEdwin "William" Galy z
Interim Executive Director
Public Works Agency
APPROVED AS TO FUNDS AND
ACCOUNTS:
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
r
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 116743 and 116415— Broadway Change Order Number 1
Rehabilitation and Water Main Improvements
Roadway and Water Main Line Improvements
To Christensen Brothers General Engineering, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications
on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by
EXTRA WORK AT TIME AND MATERIAL
PUBLIC WORKS AGENCY
1. Water main realignment and removal of obstructions on Washington Avenue per Prior Approval
dated November 18, 2013 (PCO# 4,5,6,8,9,12 ,13,16,17,18,19,20,34,41,42,43 and 44).
FINAL COST $101,405
EXTRA WORK AT AGREED PRICE
2. Traffic control implementation and safety enhancements on Broadway per Prior Approval dated
January 6, 2014 (PCO# 1,2,3,14,15,29,50 and 52).
AGREED PRICE $183,123
EXTRA WORK AT AGREED UNIT PRICES
3. Revised pavement structural section to incorporate existing buried concrete pavement on
Broadway.
The following contract items were deleted or decreased to allow for the change in scope.
Item #
Bid Item
Unit
Quantity
I Unit Price
Amount
3
Cold Milling (3 ")
SF
- 10,400
$0.54
- $5,616.00
4
Pulverized Material and Cement - Treated Base (CTB)
SF
- 241,900
$0.89
- $215,291.00
5
Additional 1% Cement Content
SF
- 241,900
$0.23
- $55,637.00
6
Remove Excess Pulverized Material
CY
-5,300
$20.52
- $108,756.00
7
Pavement Fabric
SY
- 17,850
$5.30
- $94,605.00
21
Furnish and Install Survey Monument
EA
-20
$1,387.93
- $27,758.60
33
Furnish and Install CPS Unit
EA
-3
$1,115.56
- $3,346.68
Subtotal
- $511,010.28
Page 1 of 3
C1 -r' OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 116743 and 116415 — Broadway Rehabilitation Change Order Number
and Water Main Improvements
Roadway and Water Main Line Improvements
To Christensen Brothers General Engineering, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications
on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by
PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation due the
Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact
on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of
himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work
contained in this change order, plus all payment for interruption of schedules, extended field overhead, home
office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this
Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and
work performed on this project, and that the time and cost paid per this change order constitutes the total
equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on this
project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights,
without exception or reservation of any whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE INCREASE $ 284,510
By reason of this order the CONTRACT TIME completion will be adjusted as follows: Fifteen (15) Working Days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all yy terials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefor th ices shown above.
Accepted, Date
By
Christensen Brothers General Enqinee
Approval recommended by Date
PUBLIC WORKS AGENCY EXECL4VE DIRECTOR
Approved by f Date
CITY6 ANAGER
Page 3 of 3
Inc.