HomeMy WebLinkAbout2014-060 - Adopting Findings Pursuant to the California Environmental Quality ActRESOLUTION NO. 2014 -060
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA ADOPTING FINDINGS PURSUANT TO THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT;
CERTIFYING FINAL ENVIRONMENTAL IMPACT REPORT
NO. 2011 -01 (SCH# 2008041172); ADOPTING THE
MITIGATION MONITORING PROGRAM; APPROVING
VARIANCE NOS. 2012 -04(A) AND 2012 -04(B) AS
CONDITIONED; AND, APPROVING VESTING TENTATIVE
TRACT MAP NO. 2012 -02 (COUNTY MAP NO. 17231) AS
CONDITIONED FOR THE PROPERTY LOCATED AT 1584
EAST SANTA CLARA AVENUE
WHEREAS, the Sexlinger Farmhouse and Orchard Residential Development
Project ( "Project ", "proposed Project ", or "Historic Preservation Alternative ") consists of
the development and construction of 23 new single - family residences on approximately
five acres located at 1584 East Santa Clara Avenue within the City of Santa Ana
( "City "); and
WHEREAS, the proposed Project also includes the removal of orange grove
trees and the widening and improvement of the southern portion of East Santa Clara
Avenue; and
WHEREAS, development of the Project requires approval of a vesting tentative
tract map to subdivide the property, approval of one variance for reduced street frontage
for one lot, and approval of another variance for setbacks on the rehabilitated
Farmhouse; and
WHEREAS, the proposed Project would serve to meet a portion of the regional
housing needs assessment target assigned to the City by the Southern California
Association of Governments; and
WHEREAS, the Project as proposed is consistent with the City's current General
Plan Land Use designation for the Project site of Low Density Residential ( "LR -7 ") and
the City's zoning designation for the Project site of Single Family Residential ( "R -1 ");
and
WHEREAS, pursuant to Public Resources Code section 21067 and the State
CEQA Guidelines (Cal. Code Reg., tit. 14, § 15000 et seq.) section 15051, the City is
the lead agency for the proposed Project; and
WHEREAS, pursuant to the California Environmental Quality Act (Pub. Res.
Code, § 21000 et seq.; "CEQA"), and the State CEQA Guidelines the City has
determined that an Environmental Impact Report ( "EIR ") should be prepared pursuant
Resolution No. 2014 -060
Page 1 of 12
to CEQA in order to analyze all potential adverse environmental impacts of the
proposed Project; and
WHEREAS, on or about May 3, 2011, the City issued a Notice of Preparation
( "NOP ") on a draft EIR, and circulated the NOP for a period of 30 days pursuant to State
CEQA Guidelines sections 15082(a) and 15375; and
WHEREAS, the City solicited comments from potential responsible and trustee
agencies and members of the public; and
WHEREAS, on or about June 1, 2011, the City held a public scoping meeting to
gather public comments on the proposed Project and its potential impacts on the
physical environment; and
WHEREAS, the City received 26 written and electronic comments in response to
the NOP, which assisted the City in narrowing the issues and alternatives for analysis in
the Draft EIR; and
WHEREAS, on or about July 2011, a draft EIR was circulated for public review
and comment: and
WHEREAS, on or about August 22, 2011, a Public Hearing was held by the
Planning Commission; and
WHEREAS, on or about September 2, 2011, an extension of the Draft EIR public
review period was granted; and
WHEREAS, on or about June 4, 2012, the City Council held a public hearing and
approved a resolution to list the Project site on the City of Santa Ana Register of
Historical Properties as a "Key" property; and
WHEREAS, on or about June 11, 2012, the owners of the Project site filed a
Notice of Intent to Demolish, which initiated a 240 -day time period that prevented
demolition of on -site structures and the orange grove, and required the Historic
Resources Commission to investigate feasible alternatives to the demolition; and
WHEREAS, the Draft EIR was revised to reflect additional information regarding
cultural impacts; and
WHEREAS, on or about October 31, 2012, the City initiated another 45 -day
public review period by filing a Notice of Completion and Availability with. the State
Office of Planning and Research, publishing the Notice of Availability within the Orange
County Register, and releasing a revised Draft EIR for public review and comment; and
Resolution No. 2014 -060
Page 2 of 12
WHEREAS, pursuant to CEQA Guidelines section 15086, the City consulted with
and requested comments from all responsible and trustee agencies, other regulatory
agencies, and others during the 45 -day comment period, which ran through December
17, 2012; and
WHEREAS, during the 45 -day public review period, the City held a regularly
scheduled public hearing on November 13, 2012, to receive comments regarding the
Draft EIR; and
WHEREAS, the City received 26 written comment letters during the second
public review period for the Draft EIR; and
WHEREAS, the City has prepared a Final EIR, consisting of comments received
during both 45 -day public review and comment periods on the Draft EIR, written
responses to those comments, and revisions and errata to the Draft EIR. For the
purposes of this Resolution, the "EIR" shall refer to the Draft EIR, including all of the
technical studies and appendices to the Draft EIR, as revised by the Final EIR's errata
section, together with the other sections of the Final EIR, including all of the technical
studies, attachments and appendices to the Final EIR; and
WHEREAS, the Planning Commission of the City of Santa Ana held a duly
noticed public hearing on February 10, 2014, and voted to recommend that the City
Council: (1) Adopt a resolution certifying Final Environmental Impact Report No. 2011 -01
and approve the mitigation monitoring program for the proposed Project; (2) Adopt a
resolution approving Variance No. 2012 -04(a) for the Project as conditioned; (3) Adopt a
resolution approving Variance No. 2012 -04(b) to allow a reduction in the minimum lot
frontage as conditioned; and (4) Adopt a resolution approving Vesting Tentative Tract
Map No. 2012 -02 (County Map No. 17231) as conditioned; and
WHEREAS, on or about March 4, 2014, the City Council held a duly noticed
public hearing and at that time considered all testimony, written and oral, and approved
Resolution No. 2014 -009, certifying the EIR and approving the Project; and
WHEREAS, the findings of fact attached to this resolution reflect the addition of
an alternative analysis, the Historic Preservation Analysis, to reflect the City Council's
adoption of this alternative as the environmentally superior preferred alternative; and
WHEREAS, the City Council of the City of Santa Ana held another duly noticed
public hearing on September 2, 2014, to consider this updated Resolution certifying the
FEIR (which attaches and incorporates by reference the findings), and the re- adoption
of the underlying resolution for the entitlements for the proposed Project, i.e., the
approval of two variances and approving a vesting tentative tract map; and
WHEREAS, at its duly noticed public hearing on September 2, 2014, the City
Council considered all testimony, written and oral, submitted on the proposed Project
and this Resolution; and
Resolution No. 2014 -060
Page 3 of 12
WHEREAS, Findings of Fact with respect to environmental impacts, including
environmental impacts identified in the Final EIR as potentially significant, but which the
City finds can be substantially lessened through the imposition of feasible mitigation
measures identified in the Final EIR, are described in Exhibit A hereto; and
WHEREAS, the Mitigation Monitoring Program sets forth the mitigation measures
to which the City shall bind itself in connection with this Project and is attached hereto
as Exhibit B; and
WHEREAS, as contained herein, the City has endeavored in good faith to set
forth the basis for its decision on the proposed Project; and
WHEREAS, all the requirements of CEQA and the State CEQA Guidelines have
been satisfied by the City in the Final EIR, which is sufficiently detailed so that all of the
potentially significant environmental effects of the proposed Project have been
adequately evaluated; and
WHEREAS, the Final EIR prepared in connection with the proposed Project
sufficiently analyzes both the feasible Mitigation Measures necessary to avoid or
substantially lessen the proposed Project's potential environmental impacts and a range
of feasible alternatives capable of eliminating or reducing these effects in accordance
with CEQA and the State CEQA Guidelines; and
WHEREAS, all of the findings and conclusions made by the City Council
pursuant to this Resolution are based upon the oral and written evidence presented to
the City Council as whole and not based solely on the information provided in this
Resolution; and
WHEREAS, prior to taking action, the City Council has heard, been presented
with, reviewed and considered all of the information and data in the administrative
record, including the Final EIR, and all oral and written evidence presented to it during
all meetings and hearings, all of which is incorporated herein by this reference; and
WHEREAS, the City has not received any comments or additional information
that produced substantial new information requiring recirculation or additional
environmental review under Public Resources Code sections 21166 and 21092.1 and
State CEQA Guidelines section 15088.5; and
WHEREAS, on September 2, 2014, the City Council conducted a duly noticed
public hearing on this Resolution, at which time all persons wishing to testify were heard
and the Project was fully considered; and
WHEREAS, all other legal prerequisites to the adoption of this Resolution have
occurred.
Resolution No. 2014 -060
Page 4 of 12
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS
FOLLOWS:
Section 1. Recitals. The recitals above are true and correct and are
incorporated into this Resolution by reference as findings of fact.
Section 2. Review Period. The City provided two 45 -day public review periods
for the Draft EIR, which exceeds the minimum requirements under CEQA Guidelines
sections 15073 and 15105; and
Section 3. Certification. The City hereby certifies that (1) the EIR has been
prepared, processed, and noticed in accordance with CEQA and the State CEQA
Guidelines; (2) the EIR was presented to the City Council and the City Council has
reviewed and considered the information contained in the EIR prior to considering
adoption of the Project, and (3) the EIR reflects the independent judgment and analysis
of the City Council and is deemed adequate for the purposes of making decisions on
the merits of the Project.
Section 4. CEQA Findings. The City hereby adopts the CEQA Findings,
which were prepared in accordance with Public Resources Code section 15091 and
which are attached hereto as Exhibit A and incorporated herein by this reference as if
fully set forth herein.
Section 5. Mitigation Monitoring Program. Pursuant to Public Resources
Code section 21081.6, the City Council hereby adopts the Mitigation Monitoring
Program attached hereto as Exhibit B and incorporated herein by this reference. The
City finds that Mitigation Monitoring Program is designed to ensure that, during the
implementation of the Project, the City and any other responsible parties implement the
components of the Project and comply with the mitigation measures identified in the
Mitigation Monitoring Program.
Section 6. Findings for Variance No. 2012- 04(a). Development of the
proposed Project requires approval of Variance No. 2012 -04(a) to allow the Sexlinger
Farmhouse to remain at its current location in the Single Family Residence (R -1) zoning
district. Santa Ana Municipal Code (SAMC) section 41 -234 requires a front yard
setback of twenty (20) feet. SAMC section 41- 239(g) requires the garage to be a
minimum of five feet from the residence. SAMC section 41- 1320(b) requires the
residence to provide a two -car garage. Reductions in each of these standards is
required to keep the historic Farmhouse in its current location. The City Council
determines that the following findings, which must be established pursuant to Santa Ana
Municipal Code Section 41 -638 in order to grant a variance, have been established:
A. That because of special circumstances applicable to the subject property,
including size, shape, topography, location or surroundings, that the strict
application of the zoning ordinance is found to deprive the subject property
of privileges not otherwise at variance with the intent and purpose of the
provisions of this Chapter.
Resolution No. 2014 -060
Page 5 of 12
The project site has a special circumstance related to its size, shape and
location. The approval of the variance for the Sexlinger Farmhouse will
result in the residence and garage retaining and preserving the historic
character of the property. Further, the approval of the variance will avoid
the removal of distinctive materials or alteration of features, spaces, and
spatial relationships that characterize the property. Therefore, applying
the strict letter of the Code would, in this particular case, deprive the
subject property of privileges not otherwise at variance with the intent and
purpose of the provisions of this chapter.
B. That the granting of a variance is necessary for the preservation and
enjoyment of one or more substantial property rights.
The granting of the variance is necessary for the preservation and
enjoyment of substantial property rights. Compliance with the setback,
separation and parking standards would result in the loss of a resource
that is listed on the City's Register of Historical Properties as the structure
would have to be relocated. The granting of the variance will preserve the
property owners right to develop the property with a use that is allowed by
right in the R -1 zoning district and is consistent with the general plan. The
new use will allow the development of a vacant property which will
preserve the property owner's right to develop their property.
C. That the granting of a variance will not be materially detrimental to the
public welfare or injurious to surrounding property.
The granting of the variance will not be detrimental to the public or
surrounding properties as the residence and garage are proposed to be
used as it was historically, with little or no changes to its distinctive
materials, features, spaces, and spatial relationships. The project has
been designed in compliance with all other applicable development
standards for an R -1 project.
D. That the granting of a variance will not adversely affect the General Plan of
the City.
Finally, the project will not adversely affect the General Plan. The proposed
use will result in the improvement of the property into a single - family
residence that will be consistent with the Secretary of Interior standards.
Further, the variance is consistent with goals and policies of the General
Plan, including Land Use Element Goal 4 to protect and enhance
development sites which are unique community assets, Land Use Element
Policy 4.2 to encourage the retention and reuse of historical buildings and
sites, and Housing Element Policy HE -1.7 to support preservation and
enhancement of residential structures and properties that are considered
local historic or cultural resources.
Resolution No. 2014 -060
Page 6 of 12
Section 7. Findings for Variance No. 2012- 04(b). Development of the
proposed Project requires approval of Variance No. 2012 -04(b) to allow one new lot in
the development with less than 50 feet of street frontage in the Single - Family Residence
(R -1) zoning district. Section 41- 237(b) of the Santa Ana Municipal Code requires lots
in the Single - Family Residence (R -1) zoning district to have at least 50 feet of street
frontage, as measured from the back of the setback, while the applicant is proposing to
reduce the street frontage to 41 feet for Lot No. 12. The City Council determines that
the following findings which must be established, pursuant to Santa Ana Municipal Code
Section 41 -638, in order to grant a variance, have been established:
A. That because of special circumstances applicable to the subject property,
including size, shape, topography, location or surroundings, that the strict
application of the zoning ordinance is found to deprive the subject property
of privileges not otherwise at variance with the intent and purpose of the
provisions of this Chapter.
The project site has a special circumstance related to its size, shape and
location. The subject site is a five -acre rectangular shaped parcel that will
be constrained by the application of a County street standard to the
project. In order to provide a larger street area for trash trucks and similar
sized vehicles to maneuver, a County's standard for the design of
"knuckles" was imposed on this project. The County standard required the
taking of more land than proposed, which impacted the applicant's ability
to meet the minimum street standard for an R -1 project. Therefore,
applying the strict letter of the Code would, in this particular case, deprive
the subject property of a use that is otherwise allowed by right in the zone
and would deprive the subject property of privileges not otherwise at
variance with the intent and purpose of the provisions of this chapter.
B. That the granting of a variance is necessary for the preservation and
enjoyment of one or more substantial property rights.
The granting of the variance is necessary for the preservation and
enjoyment of substantial property rights. Compliance with the street
frontage standard could result in the loss of residential units, which would
reduce the feasibility of the proposed use of the property, which impacts
the property rights of the owners. Further, the granting of the street
frontage variance will preserve the property owners right to develop the
property with a use that is allowed by right in the R -1 zoning district and is
consistent with the general plan. The new use will allow the development
of a vacant property which will preserve the property owners right to
develop their property.
C. That the granting of a variance will not be materially detrimental to the
public welfare or injurious to surrounding property.
Resolution No. 2014 -060
Page 7 of 12
The granting of the variance will not be detrimental to the public or
surrounding properties as the project and individual residential lots is
proposed to be in compliance with all applicable development standards
for an R -1 project except for the street frontage requirement. Further, the
street design will allow trash trucks and similar sized vehicles to safely
maneuver on the public streets.
D. That the granting of a variance will not adversely affect the General Plan of
the City.
Finally, the project will not adversely affect the General Plan. The proposed
use will result in the improvement of a vacant parcel from the property into a
single - family development that will accommodate move up housing in the
City. Further, the variance is consistent with several policies of the general
plan, including Policy 1.4 to support development of single - family residential
lots on a minimum area of at least 6,000 square feet, Policy 1.9 to
coordinate street and parkway designs that are attractive, functional and
compatible with adjacent on -site development, Policy 3.5 which encourages
new development that are compatible in scale and consistent with the
architectural style and character of the neighborhood, and Policy 5.10 to
support a circulation system which is responsive to the needs of
pedestrians and vehicular travel.
Section 8. Findings for Approval of Vesting Tentative Tract Map No 2012 -02
(County Map No. 17231). Development of the Project requires approval of Vesting
Tentative Tract Map No. 2012 -02 (County Map No. 17231) to allow the subdivision of
the five (5) acre parcel into 23 lots for the residential project. The City Council
determines that the following findings, which must be established pursuant to California
Government Code Section 66474, have been established:
A. The proposed project, as conditioned, and its design and improvements
are consistent with the District Center designation on the General Plan
and are otherwise consistent with all other elements of the General Plan.
Vesting Tentative Tract Map No. 2012 -02 (County Map No. 17231) is
consistent with the low density residential land use designation and
density (seven units per acre) prescribed in the General Plan and will have
no adverse affect on the surrounding land uses in the area. The
development is consistent with the single - family residences surrounding
the project on three sides.
B. The proposed project, as conditioned, conforms to all applicable
requirements of the zoning and subdivision codes as well as other
applicable City ordinances.
Vesting Tentative Tract Map No. 2012 -02 (County Map No. 17231) is in
keeping with the provisions of site plan review (DP No. 2010 -47) and
Resolution No. 2014 -060
Page 8 of 12
Chapters 34 and 41 of the Santa Ana Municipal Code, all of which pertain
to the subdivision of land and development standards for the site.
Although two lots will not meet the street frontage standard, a variance
(Variance No. 2012 -04) is proposed for the project due to the unique
design of the street.
C. The project site is physically suitable for the type and density of the
proposed project.
The vesting tentative tract map is proposed for a five -acre parcel of land
within an area that is zoned for single - family residences (R -1). The site
has been determined to be capable of supporting the type and density of
the proposed project as the proposed density of five units per acre is less
than the allowed seven units per acre.
D. The design and improvements of the proposed project will not cause
substantial environmental damage or substantially and avoidably injure
fish or wildlife or their habitat.
No fish or wildlife will be affected by the approval of this map or by the
design and improvements of the project. Environmental Impact Report
No. 2011 -01 has been prepared for this project and has identified
mitigation measures aimed at reducing any environmental impact to fish or
wildlife that may be associated with this project.
E. The design or improvements of the proposed project will not cause serious
public health problems.
The design and improvements associated with this project have been
prepared to comply with minimum City standards. The street system has
been designed to public street standards and will accommodate
emergency vehicles. Also, a County standard applicable to a "knuckle"
design, which exceeds the City's standard, will be implemented on this
project to ensure trash trucks and similar sized vehicles safely travel the
streets. Additionally, traffic calming devises are proposed at the north and
south end of Lyon Street, which will reduce speed along the streets and
improve the safety of the residences. All other improvements have been
designed to mitigate any serious impacts resulting from this project.
F. The design or improvements of the proposed project will not conflict with
the easements acquired by the public at large for access through or use of
property within the proposed project.
Approval of the vesting tentative tract map will not create conflicts with any
easements necessary for public access through the subject property, as
no such easements currently exist. Public access will be allowed to the
site as the streets will be public streets.
Resolution No. 2014 -060
Page 9 of 12
Section 9. Indemnification. The applicant agrees to indemnify, hold harmless,
and defend the City of Santa Ana, its officials, officers, agents, and employees, from
any and all liability, claims, actions or proceedings that may be brought arising out of its
approval of this project, and any approvals associated with the Project, including,
without limitation, any CEQA review or approval, except to the extent caused by the
negligence of the City of Santa Ana.
Section 10. Wildlife Resources. Pursuant to Title XIV, California Code of
Regulations (CCR) § 735.5(c)(1), the City Council has determined that, after considering
the record as a whole, there is no evidence that the proposed Project will have the
potential for any adverse effect on wildlife resources or the ecological habitat upon which
wildlife resources depend. The proposed Project exists in an urban environment
characterized by paved concrete, roadways, surrounding buildings and human activity.
Therefore, pursuant to Fish and Game Code § 711.2 and Title XIV, CCR § 735.5, the
payment of Fish and Game Department filing fees is not required in conjunction with this
project.
Section 11. Approvals. Based on the entire record before the City Council, all
written and oral evidence presented, the CEQA Findings, and the Mitigation Monitoring
Program, all attached and incorporated herein as Exhibit A and Exhibit B to this
Resolution, the City Council of the City of Santa Anan hereby:
A. Adopts the CEQA findings, certifies Final Environmental Impact
Report No. 2011 -01 (SCH# 2008041172), and approves
the
mitigation monitoring program for the
Sexlinger Farmhouse
and
Orchard.
B. Approves Variance No. 2012 -04(a) as
conditioned in Exhibit
"C"
attached hereto and incorporated herein.
C. Approves Variance No. 2012 -04(b) as
conditioned in Exhibit
"D"
attached hereto and incorporated herein.
D. Approves Vesting Tentative Tract Map
No. 2012 -02 (County Map
No. 17231) as conditioned in Exhibit
"E" attached hereto
and
incorporated herein.
These decisions are based upon the evidence submitted at the above said
hearing, which includes, but is not limited to: the Request for Council Action dated
September 2, 2014, and exhibits attached thereto; and the public testimony, written and
oral, all of which are incorporated herein by this reference.
Section 12. Judicial Review. This decision rendered by the City Council of the
City of Santa Ana is final and is subject to judicial review pursuant to California Code of
Civil Procedure section 1094.6. The Clerk of the Council shall give direct notice to the
applicant of the Council's decision and these findings.
Section 13. Location of Documents and Custodian of Records. The documents
and materials that constitute the record of proceedings on which the CEQA Findings in
Resolution No. 2014 -060
Page 10 of 12
Exhibit A of this Resolution have been based are located at 20 Civic Center Plaza,
Santa Ana. The custodian for these records is the Santa Ana Clerk of the Council. This
information is provided in compliance with Public Resources Code section 21081.6.
Section 14. The City Council hereby directs staff to file a Notice of
Determination with the County of Orange within five (5) working days of final Project
approval.
ADOPTED this 16th day of September, 2014
APPROVED AS TO FORM:
Sonia R. Carvalho
City Attorney
Mayor
AYES: Councilmembers: Amezcua, Benavides, Martinez Pulido Revna,
Sarmiento. Tinajero (7)
NOES: Councilmembers: None (0)
ABSTAIN: Councilmembers: None (0)
NOT PRESENT: Councilmembers: None
Resolution No, 2014 -060
Page 11 of 12
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2014 -060 to be the original resolution adopted by the City Council of the
City of Santa Ana on September 16, 2014.
Date: 1013),2,-1y
Clerk of the Council
City of Santa Ana
Resolution No. 2014 -060
Page 12 of 12
California Environmental Quality Act Findinas
Exhibit "A"
Sexiinger Farmhouse and Orchard
Residential Development Project
EXHIBIT "A"
CEQA FINDINGS FOR THE
SEXLINGER FARMHOUSE AND ORCHARD
RESIDENTIAL DEVELOPMENT PROJECT
1.0 Summary of Findings
CEQA Findings
At a public heating held on September 2, 2014, the City Council of the City of Santa Ana determined
that, based on all of the evidence presented, including but not limited to the EIR, written and oral
testimony given at meetings and hearings, and the subm ssion of testimony from the public, organizations
and regulatory agencies, all enviromnental impacts associated with the project as currently proposed
("proposed project" or "the Historic Preservation Alternative ") are: (1) less than significant and do not
require mitigation; or (2) potentially significant but will be avoided or reduced to a level of insignificance
through the identified mitigation measures. These CEQA Findings for the Sexlinger Farmhouse and
Orchard Residential Development Project fully account for all impacts analyzed in the EIR, each of which
have been determined to have a less than significant impact on the environment with mitigation
incorporated.
2.0 Environmental Review Process
Project Background
The proposed project site is located at 1584 East Santa Clara Avenue in the northeastern portion of the
City. The site is approximately five acres and bounded by East Santa Clara Avenue to the north, Portola
Park to the east, East Avalon to the south, and Concord Street on the west. The site is located
approximately one mile west of State Route 55 (SR -55), approximately one mile south of State Route 22
(SR -22), and approximately 1.2 miles east of Interstate 5 0 -5). The project site is also located
approximately 500 feet southwest of Fairhaven Memorial Park, approximately a half mile from Sierra
Intermediate School located at 2021 North Grand Avenue, approximately 1,000 feet from John Muir
Fundamental Elementary School located at 1951 North Mabury Street, and adjacent to single family
residences.
As originally proposed, the project would have developed 24 new single family residences, and
demolished the existing vacant residential structure located on the parcel. The Draft Environmental
Impact Report prepared for the project determined that, as originally proposed, the project would have
significant and unavoidable impacts to cultural resources, related to the demolition of the existing
residential structure, even after all feasible mitigation was incorporated. (EIR, pp. 2 -3 through 2 -6, 5 -20
through 5 -4 3; EIR Fig, 3,)
During the environmental review and comment process, the project applicant changed the proposed
Project to include only 22 new single family residential units, and preserve in place the existing
residential structure and garage located on an approximately 10,044 square foot lot on the northwest
corner of the project site. (Sexlinger Farmhouse and Orchard Residential Development Project
Attachment to the Environmental Impact Report Featuring the Additional Analysis & Response to
Continents (January 2014) [ "January 2014 EIR Attachment"], pp. 1 -2.) The exterior of the residential
structure and garage would be rehabilitated to Secretary of the Interior historic preservation standards,
1 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project CEQA Flndings
and the home and garage would be returned to single family residential use per building code
requirements for habitable structures. (January 2014 EIR Attachment, pp. 1 -2.) Subsequently, the home
would be available for sale for residential use. Approximately ten orange trees currently exist in this
portion of the property. Additional orange trees would be planted in order to fill out the orchard, and any
dead trees would be removed and be replaced with new orange trees. (January 2014 EIR Attachment, p.
2.) In January 2014 an Attachment to the Environmental Impact Report was released, describing what
was termed the "Historic Preservation Alternative" and describing the potential impacts of the Historic
Preservation Alternative.
The 22 new single family residences now proposed would be developed on the remaining areas of the
property, each with a lot size ranging from 6,000 square feet to 8,611 square feet. Average lot size would
be approximately 6,609 square feet, slightly larger than average lot sizes under the original 24 -unit
proposed Project. The Historic Preservation Alternative would involve a roadway dedication of
approximately eight feet along Santa Clara Avenue which would reduce the setback to five feet for the
residential structure that is being preserved. A connection with Lyon Street to the south and Santa Clara
Avenue to the north is also included in this alternative. This alternative includes a variance for a lot
frontage less than the required minimum width on Lot 12. In addition, a variance for a front yard setback
less than the required 20 foot setback would be required for the Sexlinger Orchard structure, No other
variances are proposed. The Alternative would require the approval of Vesting Tentative Tract Map No.
2012 -02 (County Map No. 17231) to subdivide the site into 23 residential lots. The population of the
City of Santa Ana has grown significantly in the past decade, and is expected to continue increasing in
future years creating demand for new housing. The City of Santa Ana is required to plan for this
increased housing demand by the State of California. Through this process the City is assigned a target
goal for housing production by the Southern California Association of Governments (SLAG). This target
goal is called the Regional Housing Needs Allocation (RFINA). While the City itself is not responsible
for constructing this housing, it is required to identify sites within the City that would be suitable for
housing development and to remove barriers to such construction. The City's RHNA target for 2006
through 2014 is 3,393 units. Of this number, 1,461 units must be constructed for families with incomes
above the Orange County median. The proposed project will serve to meet a portion of this target and is
consistent with the goals and policies of the City's General Plan Housing Element.
The project application has been submitted by and with written consent from the current property owner,
as allowed by the Santa Ana Municipal Code. The project is consistent with the current General Plan
Land Use designation of Low Density Residential (LR -7) and the zoning designation of Single Family
Residential (R -1).
The City of Santa Ana is the Lead Agency for the EIR and determined that the EIR is required for the
proposed project, pursuant to CEQA Guidelines to assess the potential impacts resulting from approval of
the project and other discretionary actions necessary for its implementation. To implement the project,
the City may consider various actions, permits, and/or approvals. The following City of Santa Ana
approvals are anticipated to be required for the proposed project:
• Vesting tentative tract map to subdivide the property;
• Variance to reduce street frontage for Lot 12 and the existing Sexlinger structure; and
2 "Exhibit A"
Sexiinger Farmhouse and Orchard
Residential Development Project CEQA Findings
s Certification of the EIR and adoption of a Mitigation Monitoring Program.
Draft Environmental Impact Report
Initial Study and Notice of Preparation
Pursuant to the provisions of CEQA Guidelines Section 15082, as amended, the City circulated an NOP
to public agencies, and members of the public for a 30 -day review period beginning on May 3, 2011 and
ending on June 10, 2011, The purpose of the NOP was to formally announce that the City is preparing a
Draft EIR for the proposed project, and was soliciting input regarding the scope and content of the
information to be included in the EIR. The Initial Study was circulated with the NOP and was made
available at the Santa Ana Public Library throughout the 30 -day review period. The NOP, Initial Study,
and responses to the NOP are provided in the Appendix A of the DEIR.
During the NOP circulation period, the City advertised a public seeping meeting. The meeting was held
on June 1, 2011 and was intended to facilitate public input on the proposed project. The meeting was
held with the intent of affording interested parties and public agencies a forum in which to orally present
input directly to the Lead Agency to assist in further refining the scope and focus of the EIR.
Furthermore, neighborhood meetings were held on December 2010 and March 2011 by City Staff and
residences to discuss and review the project with the Portola Park and Meredith Parkwood Neighborhood
Associations. In addition, a City Planning Commission sub - committee meeting was hold on June 8, 2011
with City Staff. Finally, a study session before the Planning Commission was held on June 13, 2011,
which was noticed by email, City website, and Commission agenda.
Draft EIR
As a brief background, the City has taken many steps to maximize participation opportunities during the
environmental process. As mentioned, this included the distribution of an Initial Study and Notice of
Preparation (NOP), and Public Seeping Meeting held on June 1, 2011, circulation of the DEIR in July
2011, a Public Hearing in August 2011, in extension of the DEIR public review period in October 2011,
the preparation of a supplemental cultural resources technical memorandum in December 2011, public,
review period in January 2012, and City Council Hearings held on May 7, 2012 and June 4, 2012.
Subsequently, the DEIR was revised in October 2012, circulation of the revised DEIR occurred from
November 1, 2012 to December 17, 2012 with a Public Hearing occurring on November 13, 2012.
Comments received on the DEIR included written comments, including those sent via mail and email, and
oral comments provided to the Planning Commission during the public hearing, which took place on
November 13, 2012. Comments received are included as a part of the FEIR.
Responses to Comments
The City evaluated the comments on the environmental issues received from persons who reviewed the
DEIR. In accordance with CEQA, the City prepared written responses describing the disposition of
significant environmental issues raised in these comments. As required by CEQA, the City has provided
to each public agency that commented on the DEIR, responses to the comments received from that
agency at least ten days prior to the certification of the FEIR. The FEIR provided adequate, good faith
and reasoned responses to the comments.
3 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project CEQA Findings
Additional Analysis for Response to Comments
As stated above, the DEIR was made available for public comment for a 45 -day public review period,
beginning on November 1, 2012, and ending on December 17, 2012. After comments were received and
their responses were prepared, the City prepared a FEIR in January, 2013. This EIR had originally
considered seven different project alternatives, with project proponents supporting the proposed Project
alternative, which would build 24 new single family residences, and demolish the Sexlinger Farmhouse
and Orchard. However, the City Council did not take final action on this proposal and did not certify the
FEIR.
To address cultural impacts associated with the development at the orchard, a variant of the Hybrid
Alternative, entitled the Historic Preservation Alternative, was analyzed in a document entitled Additional
Analysis for Response to Comments on a Draft EIR (Additional Analysis). Further, analysis regarding
carbon sequestration was also provided in the Additional Analysis. The Additional Analysis was prepared
in response to public comments and provided additional information and analyses that merely clarified or
amplified or made insignificant modifications to the DEIR after it was circulated for public comment in
December, 2012. Recirculation was not required pursuant to Section 15088.5 subd. (b) of the CEQA
Guidelines; however, the information was provided for the benefit of public review and disclosure. The
Additional Analysis was available for public review from December 19, 2013 to January 17, 2014. The
City of Santa Ana requested that reviewers limit their comments to the information provided in the
Additional Analyses document only. Prior to the Planning Commission and City Council meetings, the
applicant changed the proposed Project from the original 24 -unit residential development to the Historic
Preservation Alternative which is now the applicant's final proposed Project and the Preferred Alternative
as well as the Environmentally Superior Alternative. It is the Project approved by the City.
Responses to Comments
The City evaluated the comments on the environmental issues received from persons who reviewed the
Additional Analysis. In accordance with CEQA, the City prepared written responses describing the
disposition of significant environmental issues raised in these comments. As required by CEQA, the City
has provided to each public agency that commented on the DEIR, responses to the comments received
from that agency at least ten days prior to the certification of the FEIR The FEIR provided adequate,
good faith and reasoned responses to the comments.
Final Environmental Impact Report
The City has prepared a FEIR for the proposed project. In accordance with the requirements of CEQA
and the CEQA Guidelines, the FEIR consists of.
• The DEIR or revision of the DEIR;
• The Additional Analysis;
• Comments and recommendations received on the DEIR and Additional Analysis;
• List of persons, organizations, and public agencies commenting on the DEIR and Additional
Analysis;
"Exhibit A"
SeAngor Farmhouse and Orchard
Residential Development Project
CEQA Findings
The responses of the Lead Agency to significant environmental points raised in the review and
consultation process;
• Any other information added by the Lead Agency,
3.0 Proposed Project: "Historic Preservation Alternative"
The project as currently proposed, and as described in the Draft EIR as "the Historic Preservation
Alternative", would keep in place the existing residential structure and garage located on an
approximately 10,044 square foot lot on the northwest corner of the project site. The exterior of the
residential structure and garage would be rehabilitated to Secretary of the Interior historic preservation
standards, and the home and garage would be returned to single family residential use per building code
requirements for habitable structures. Subsequently, the home would be available for sale for residential
use. Approximately ten orange trees currently exist in this portion of the property. Additional orange
trees would be planted in order to fill out the orchard, and any dead trees would be removed and replaced
with new orange trees.
Twenty -two new single family residences would be developed on the remaining areas of the property,
each with a lot size ranging from 6,000 square feet to 8,611 square feet. Average lot size would be
approximately 6,609 square feet. The project would involve a roadway dedication of approximately eight
feet along Santa Clara Avenue which would reduce the setback to five feet for the residential structure
that is being preserved. A connection with Lyon Street to the south and Santa Clara Avenue to the north
is also included. This project would result in no significant and unavoidable impacts. This is the
applicant's final proposed project, and the subject of these CEQA Findings.
4.0 Findings Regarding Resource Areas Where It Can Be Seen With
Certainty There Is No Potential For Environmental Impacts
Consistent with Public Resources Code section 21002.1 and State CEQA Guidelines section 15128, the
EIR focused its analysis on potentially significant impacts, and limited discussion of other impacts for
which it can be seen with certainty there is no potential for significant adverse environmental impacts.
State CEQA Guidelines section 15091 does not require speck findings to address environmental effects
that an EIR identifies as "no impact" or a "less than significant" impact. Nevertheless, the City Council
hereby finds that there is no possibility that the Project would have any impact to the following resource
areas:
A, AGRICULTURAL RESOURCES
1. Impacts:
Will the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide
Importance to non - agricultural use?
Will the project conflict with existing zoning for agricultural use or a Williamson
Contract?
"Exhibit A"
Sexltnger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Will the Project conflict with existing zoning for, or cause rezoning of, forest land,
timberland, or timberland zoned Timberland Production?
Will the project result in the loss of forest land or conversion of forest land to non - forest
use?
Will the project involve other changes in the existing environment which, due to their
location or nature, could result in conversion of Farmland, to nonagricultural use or
conversion of forest land to non - forest use?
Finding: No Impact. (EIR, pp. 4 -1, 4 -2.)
Analysis: According to the Santa Ana General Plan and the Farmland Mapping and
Monitoring Project, the City does not contain any Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance. The project site is classified as being located in an
urbanized area and therefore will not adversely affect these classes of farmland. Given
that the City contains no important farmland, no Williamson Act Contract can be
applicable to the project site. Furthermore, the project site is zoned and designated in the
General Plan for residential use, and therefore the project cannot conflict with existing
zoning for forestland or timberlands. Nor would the project convert forest land to any
other use. As a result, it can be seen with certainty that the proposed project will have no
impact on agricultural resources. (EIR, pp. 4 -1, 4 -2)
B. BIOLOGICAL RESOURCES
Impacts:
Will the project have a substantial adverse effect, either directly or through habitat
modifications, on any species identified as a candidate, sensitive, or special status species
in local or regional plans, policies, or regulations, or by the California Department of Fish
and Wildlife or U.S. Fish and Wildlife Service?
Will the project have a substantial adverse effect on any riparian habitat or other sensitive
natural community?
Will the project have a substantial adverse effect on federally protected wetlands through
direct removal, filling, hydrological interruption, or other means?
Finding: No Impact, (EIR, p. 4 -2.)
Analysis: Given that the project site is located in a developed area of the City of Santa
Ana and contains no sensitive habitat, the project will not have any direct impact on
sensitive species. The site is developed with a residential structure and an orange grove,
and there are no riparian habitats or other sensitive natural communities within the
project site. No federally protected wetlands are present. As a result, it can be seen with
certainty that the proposed project will have no impact on biological resources. (EIR, p.
4 -2.) Further, approximately 10 orange grove trees would remain within Lot 1 of the
project. (January 2014 EIR Attachment, p. 4)
"Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
C. GEOLOGY AND SOILS
CEQA Findings
Impact: Will the project have soils incapable of adequately supporting the use of septic
tanks or alternative wastewater disposal systems where sewers are not available?
Finding: No Impact. (EIR, p. 4 -2.)
Analysis: Sewer access is available in the project area. (EIR, p. 4 -2.)
D. HAZARDS AND HAZARDOUS MATERIALS
1. Impacts:
For a project located within an airport land use plan or, where such a plan has not been
adopted, within two miles of a public or public use airport, would the project result in a
safety hazard for people residing or working the project area?
For a project within the vicinity of a private airstrip, would the project result in a safety
hazard for people residing or working in the project area?
Finding: No Impact. (EIR, p. 4 -3.)
Analysis: The nearest public airport to the project site is John Wayne International
Airport, located approximately 12 miles southwest. The project is not located in the
vicinity of a private airstrip. Consequently the project would not result in a safety hazard
related to any airport. (EIR, p. 4 -3.)
Impact: Would the project expose people or structures to a significant risk of loss, injury
or death involving wildland tires?
Finding: No Impact. (EIR, p. 4 -3.)
Analysis: The project site is located in a developed area, surrounded by developed
parcels. As a result, the vicinity of the project does not contain any areas susceptible to
wildland fires. (EIR, p. 4 -3.)
E. HYDROLOGY AND WATER QUALITY
Impacts:
Would the project place housing within a 100 -year flood plain, as mapped on a Federal
Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation
map?
Would the project place housing or structures within a 100 -year floodplain such that they
would impede or redirect flood flows?
Finding: No Impact. (EIR, p. 4 -3.)
"Exhibit A"
SeAnger Farmhouse and Orchard
Resldentlal Development Project
CEQA Findings
Analysis: According to the City's General Plan Land Use Element, the project site is not
within a 100 -year flood zone, Therefore the project would also not place structures
within the 100 -year floodplain. (EIR, p. 4 -3.)
2. Impact: Would the Project expose people or structures to a significant risk of loss, injury
or death involving inundation by seiehe, tsunami, or mudflow?
Finding: No Impact. (EIR, p. 4 -3.)
Analysis: There are no large bodies of open water on or near the project site that could
result in these hazards. (EIR, p. 4 -3.)
F. LAND USE AND PLANNING
Impact: Would the project divide an established community?
Finding: No Impact, (EIR, p. 4 -4)
Analysis: The project is located within an area of residential uses, and the project
proposes additional residential uses similar to the surrounding area. The project will
provide a street connection to the existing neighborhood. In addition, the existing vacant
residential structure located on the northern portion of the project would remain in place,
further providing continuity between the existing, established community, and the new
structures proposed. Therefore, the project would not divide an established community.
(EIR, p. 4 -4; January 2014 EIR Attachment, p. 7.)
Impact: Would the project conflict with any applicable habitat conservation plan or
natural community conservation plan?
Finding: No Impact. (EIR, p, 4 -4,)
Analysis: The project is located in an urbanized area, not within the boundaries of any
applicable habitat plan. (EIR, p. 4 -4)
G. MINERAL RESOURCES
L Impacts:
Would the project result in the loss of availability of a known mineral resource that
would be of value to the region and the residents of the state?
Would the project result in the loss of availability of a locally - important mineral resource
recovery site delineated on a local general plan, specific plan or other land use plan?
Finding: No Impact. (.EIR, p. 4 -4)
Analysis: Pursuant to the Land Use Element of the City General Plan, there are no areas
in the City designated as Significant Mineral Aggregate Resource Areas or existent oil
"Exhibit A"
SeAnger Farmhouse and Orchard
Resldentlel Development Project
H. NOISE
CEQA Flndings
fields. As the City is a built -out and developed urban community, there are no mineral
resources zones within the project site or general vicinity. (EIR, p. 4 -4.)
1. Impacts:
For a project located within an airport land use plan or, where such a plan has not been
adopted, within two miles of a public airport or public use airport, would the Project
expose people residing or working in the Project area to excessive noise levels?
For a project within the vicinity of a private airstrip, would the Project expose people
residing or working in the Project area to excessive noise levels?
Finding: No Impact. (EIR, p. 4 -4.)
Analysis: The project is not located within an airport land use plan, or within the vicinity
of a private airstrip. (EIR, p. 4 -4.)
I. POPULATION AND HOUSING
1. Impacts:
Would the project displace substantial numbers of existing housing, necessitating the
construction of replacement housing elsewhere?
Would the project displace substantial numbers of people, necessitating the construction
of replacement housing elsewhere?
Finding: No Impact. (EIR, p. 4 -5.)
Analysis: The proposed project would not displace housing or people. The existing
structure is unoccupied, and the project would result in the development of 22 new
residential units. (EIR, p. 4 -5.)
J. TRANSPORTATION AND TRAFFIC
1. Impact: Would the project result in a change in air traffic patterns, including either an
increase in traffic levels or a change in location that results in substantial safety risks?
Finding: No Impact. (EIR, p. 4 -5.)
Analysis: The project site is not near a public airport or private airstrip, and the size and
residential nature of the project is not substantial enough to result in an increase in air
traffic patterns. (EIR, p. 4 -5.)
2. Impact: Would the proj cot result in inadequate parking capacity?
Finding: No Impact. (EIR, p. 4 -5.)
9 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Analysis: The project would be required to provide parking as required under the City
Zoning Code: one two- vehicle garage and a driveway for tandem parking for each single
family residence. Therefore the project would provide the off- street parking capacity
needed by the proposed development. (EIR, p. 4 -5.)
3. Impact: Would the project conflict with adopted policies, plans, or programs supporting
alternative transportation?
Finding: No Impact. (EIR, p. 4 -5,)
Analysis: The project would not conflict with any applicable policies and there is no
Orange County Transportation Authority bus service provided along East Santa Clara
Avenue. (EIR, p. 4 -5.)
5.0 Findings Regarding Less Than Significant Environmental Impacts Not
Requiring Mitigation
State CEQA Guidelines section 15091 does not require specific findings to address environmental effects
that an EIR analyzes and identifies as a "less than significant" impact. Nevertheless, these findings fully
account for all environmental categories, including environmental categories that were analyzed in the
EIR and determined to have a less than significant impact on the environment. The City Council hereby
finds that the Project will have a less than significant impact in the following resource areas:
A. AESTHETICS
1. Impact: Would the Project have a substantial adverse effect on a scenic vista?
Finding: Less than Significant. (EIR, p. 5 -4.)
Analysis: The project site is located in an area of existing urban development, and is
surrounded by developed parcels. The surrounding urban development indicates that
development of the project site would not impact views or scenic vistas from large nearby
freeways, including I -5, SR -55, or SR -22. (EIR, p. 5 -2, 5 -3, 5 -4.) Further, the existing
residential structure, and approximately 10 existing orange grove trees would remain in
place, providing a continuity of views from before and after the project. The existing
structure would be rehabilitated in a manner that maintains the existing architectural
character of the site. (January 2014 EIR Attachment, p. 4.)
2. Impact: Would the Project substantially damage scenic resources, including, but not
limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
Finding: Less than Significant. (EIR, p. 5 -)
Analysis: No designated scenic highways pass through the City of Santa Ana. The
Scenic Corridors Element of the City of Santa Ana General Plan identifies several
primary and secondary City corridors, however none are located near the project site.
Therefore, the project site is not visually accessible to or from any scenic corridors of
regional or local significance. The surrounding urban development indicates that
10 "Exhibit A"
Sexltnger Farmhouse and Orchard
Residential Development Project
CEQA Findings
development of the project site would not impact views from large nearby freeways,
including I -5, SR -55, or SR -22. (EIR, p. 5 -2, 5 -3, 5 -4.) Further, the existing residential
structure, and approximately 10 existing orange grove trees would remain in place,
providing a continuity of views from before and after the project. The existing structure
would be rehabilitated in a manner that maintains the existing architectural character of
the site. (January 2014 EIR Attachment, p. 4.)
B. AIR QUALITY
1. Impact: Would the Project result in a cumulatively considerable net increase of any
criteria pollutant for which the project region is in non - attainment under an applicable
federal or state ambient air quality standard?
Finding: Less Than Significant. (EIR, p. 5 -10, Table 5 -2.)
Analysis: SCAQMD has established thresholds for VOC, NOX, CO, SOX, PM10, PM2.5
and CO2. (EIR, p. 5 -10.) Construction of the proposed project would not violate the
regional significance thresholds for these pollutants. (EIR, Table 5 -2.) While the Draft
EIR analyzed a project consisting of 24 new single family residences, the project as
approved would consist of only 22 new single family residences. As the Draft EIR found
no significant impact, it stands to reason that the reduced intensity from 24 to 22 new
residential units would also have less than significant impacts. As a result, this impact is
less than significant. (January 2014 EIR Attachment, p. 4.)
2. Impact: Would the Project create objectionable odors affecting a substantial number of
people?
Finding: Less Than Significant. (EIR, p. 5 -12, 5 -13.)
Analysis: The project proposes residential uses. The project does not propose any use
that is typically associated with odors. Therefore, this impact is considered less than
significant. (EIR, p. 5 -12, 5 -13.)
C. CULTURAL RESOURCES
1, Impact: Would the project cause a substantial adverse change in the significance of a
historical resource as defined in CEQA Guidelines section 15064.5, and by the City of
Santa Ana requirements?
Finding: Less Than Significant. (January 2014 EIR. Attachment, p. 6.)
Analysis: The project site is listed in the Santa Ana Register of Historical Places as of
June 4, 2012, and therefore is considered a historical resource for purposes of CEQA.
(January 2014 EIR Attachment, p. 5.) Development of the project, as now proposed,
would preserve in place the existing residence, garage, and a number of orange grove
trees located on Lot 1. However, the project would cause the extant landscape to undergo
a substantial change as the majority of the orange trees of the project site would be
removed, While dead or dying trees would be removed from Lot 1 if required, these
11 "Exhibit A"
Sexlingar Farmhouse and Orchard
Resldentlal Development Project
CEQA Findings
would be replaced with trees matching the existing type, arrangement, pattern, and shape
of the orchard within Lot 1. This would retain the feeling, appearance, and character of
the historical resource in this portion of the project site. (January 2014 EIR Attachment,
p. 5) However, while the project would preserve the residence, garage, and portion of
the orange trees, the property would be transformed from a historic single family
residence and orchard to a suburban development with a small orchard and 22 new
single - family residences. (January 2014 EIR Attachment, pp. 5 -6.)
However, because the property would retain many of its major elements and still convey
the significance of a property type once common in the City, and because the historic
structures will be surrounded by compatible low density residential use, the property's
location, feeling, and overall character will be maintained. Therefore the project will
meet Secretary of Interior Standards for the Treatment of Historic Properties, reducing
any potential for impacts to less than significant. (January 2014 EIR Attachment, p. 5 -6;
Cultural Resources Technical Memorandum, URS (November 2013))
D. GEOLOGY AND SOILS
1. Impact: Would the project be located on a geologic unit or soil that is unstable, or that
would become unstable as a result of the project, and potentially result in on- or off -site
landslide, lateral spreading, subsidence, liquefaction or collapse?
Finding: Less Than Significant. (EIR, pp. 5 -44, 5 -45; January 2014 EIR Attachment, p.
6.)
Analysis: According to the California Department of Water Resources, the depth to
groundwater in the project area is more than 50 feet. Liquefaction potential is considered
negligible due to the relatively cohesive and dense nature of the underlying materials and
lack of a shallow groundwater table. No evidence of past landslides or slope instabilities
has been observed. Liquefaction is not generally considered to be a hazard if the water
table is deeper than 50 feet, Thus, there is low probability for liquefaction, subsidence
and landslides. Due to the site's elevation and distance from any open bodies of water,
potential for seiehe is also negligible. Therefore, any impact is considered less than
significant. (EIR, p. 4 -44, 4 -45; January 2014 EIR Attachment, p. 6.)
2. Impact: Would the project be located on expansive soil, as defined in Table 18 -1 of the
Uniform Building Code, creating substantial risks to life or property ??
Finding: Less Than Significant. (EIR, pp. 5 -44, 5 -45; January 2014 EIR Attachment, p.
6.)
Analysis: The project site consists of Quaternary -age alluvium consisting of silty sand
and sandy silt materials which at depth change to dense gravelly sand. Based on
laboratory testing with similar soils, the materials on the project site possess a very low
expansion potential. Thus, impacts are less than significant. (EIR, p. 4 -44, 4 -45; January
2014 EIR Attachment, p. 6.)
12 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project CEQA Findings
E. GREENHOUSE GAS EMISSIONS
1. Impact: Would the project generate greenhouse gas emissions, either directly or
indirectly, that may have a significant impact on the environment?
Finding: Less Than Significant. (EIR, pp. 5 -48, 5 -49; January 2014 EIR Attachment, pp.
6 -7.)
Analysis: The South Coast Air Quality Management District (SCAQMD) recommends a
screening level threshold of 3,000 metric tons of GHG emissions per year for residential
and commercial developments. The proposed project's maximum annual emissions are
507 metric tons of carbon dioxide equivalents from project operations. This accounts for
0,0001 percent of California's GHG emissions. GHG emissions from construction of the
project would peak at approximately 2,371 pounds per day, with emissions for the whole
construction period totaling 247.4 metric tons. An analysis of impacts to existing carbon
sequestration resulting from the removal of the majority of the site's orange tree orchard
was completed. This analysis determined that up to 1,300 metric tons of GHGs could be
sequestered by the existing orchard. When the project's estimated GHG emissions are
combined with the loss of sequestration, the overall project impact increases to 1,807
metric tons of GHG emissions per year. This amount is well below the significance
threshold established by SCAQMD and therefore impacts are considered less than
significant. (January 2014 EIR Attachment, pp. 9 -10, Table 1.)
Impact: Would the project conflict with an applicable plan, policy or regulation adopted
for the purpose of reducing greenhouse gas (GHG) emissions?
Finding: Less Than Significant. (EIR, pp. 5 -48, 5 -49; January 2014 EIR Attachment, pp.
6 -7.)
Analysis: California Assembly Bill 32 and Senate Bill 375 are polices adopted for the
overall reduction of GHG emissions statewide. The proposed project's maximum annual
emissions are 507 metric tons of carbon dioxide equivalents from project operations.
This accounts for 0.0001 percent of California's GHG emissions. GHG emissions from
construction of the project would peak at approximately 2,371 pounds per day, with
emissions for the whole construction period totaling 247.4 metric tons. These amounts
are so small that they do not conflict with, or impede implementation of, AB 32, SB 375,
or any other plan, policy, or regulation adopted for the purpose of reducing GHG
emissions. Therefore, impacts are less than significant. (EIR, p. 4 -48, 4 -49.)
Further, an analysis of impacts to existing carbon sequestration resulting from the
removal of the majority of the site's orange tree orchard was completed. This analysis
determined that up to 1,300 metric tons of GHGs could be sequestered by the existing
orchard. When the project's estimated GHG emissions are combined with the loss of
sequestration, the overall project impact increases to 1,807 metric tons of GHG emissions
per year. (January 2014 EIR Attachment, pp. 9 -10, Table 1) However, the analysis also
determined that this increased total is still insignificant when compared against the State
13 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
of California's emissions as a whole. (January 2014 EIR Attachment, p. 10.) As a result,
impacts are less than significant.
r�li�:ily� ; � y: u�� •�rva ; � • �y
1. Impact: Would the project create a significant hazard to the public or the environment
through the routine transport, use or disposal of hazardous materials?
Finding: Less Than Significant. (EIR, pp. 5 -51, 5 -52; January 2014 EIR Attachment, 7.)
Analysis: Construction of the project would only involve the use of materials typical for
resident construction and all materials would be transported, utilized, and stored in a
manner consistent with applicable regulations. Therefore, this impact is considered less
than significant. (EIR, pp. 5 -51, 5 -52; January 2014 EIR Attachment, 7.)
2, Impact: Would the project emit hazardous emissions or handle hazardous or acutely
hazardous materials, substances, or waste within one - quarter mile of an existing or
proposed school?
Finding: Less Than Significant. (EIR, pp. 5 -51, 5 -52; January 2014 EIR Attachment, 7.)
Analysis: The project site is located within a quarter mile of Sierra Intermediate School
and Muir Elementary School, but it is not expected to impact the school due to the site's
lack of handling or generating hazardous materials or wastes. Therefore, this impact is
considered less than significant. (EIR, pp. 5 -51, 5 -52; January 2014 EIR Attachment, 7.)
3. Impact: Would the project be located on a site which is included on a list of hazardous
materials sites compiled pursuant to Government Code section 65962.5 and, as a result,
would it create a significant hazard to the public or the environment?
Finding: Less Than Significant. (EIR, pp. 5 -51, 5 -52; January 2014 EIR Attachment, 7)
Analysis: The project site is not included on a list of hazardous materials sites compiled
pursuant to Government Code Section 65962.3. A Phase I Environmental Site
Assessment was completed for the project, which found leaking underground storage
tanks within one -half mile of the site. However, these tanks were found to be in excess
of one - quarter mile of the site and/or have been closed to further action by regulatory
agencies. Given the distance and the local geologic setting, these are not considered of
environmental concern to the project. This is a less than significant impact. (EIR, pp. 5-
51, 5 -52; January 2014 FIR Attachment, 7.)
G. HYDROLOGY AND WATER QUALITY
1. Impact: Would the project substantially alter the existing drainage pattern of the site or
area, including through the alteration of the course of a stream or river, in a manner
which would result in substantial erosion or siltation on- or off -site?
Finding: Less Than Significant. (EIR, pp. 5 -53, 5 -54; January 2014 EIR Attachment, 7.)
14 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Analysis: The project would increase impervious surfaces at the project site, resulting in
a 25 year runoff of approximately 4.7 efs and T8 cfs, at different locations. A hydrology
technical report was completed for the project, and concluded that the flows from the
proposed project as compared with the existing conditions at the site are minor and would
not exceed the capacity of any street or adjacent storm drain facility downstream of the
project. Therefore, impacts would be less than significant. (EIR, pp. 5 -53, 5 -54; January
2014 EIR Attachment, 7.)
2, Impact: Would the project substantially alter the existing drainage pattern of the site or
area, including through the alteration of the course or substantially increase the rate or
amount of surface runoff in a manner which would result in flooding on- or off -site?
Finding: Less Than Significant. (EK pp. 5 -53, 5 -54; January 2014 FIR Attachment, 7.)
Analysis: The project would increase impervious surfaces at the project site, resulting in
a 25 year runoff of approximately 4.7 cfs and 7.8 cfs, at different locations. A hydrology
technical report was completed for the project, and concluded that the flows from the
proposed project as compared with the existing conditions at the site is minor and would
not exceed the capacity of any street or adjacent storm drain facility downstream of the
project. Therefore, impacts would be less than significant. (EIR, pp. 5 -53, 5 -54; January
2014 EIR Attachment, 7.)
Impact: Would the project create or contribute runoff water which would exceed the
capacity of existing or planned stormwater drainage systems or provide substantial
additional sources of polluted runoff?
Finding: Less Than Significant. (EIR, pp. 5 -53, 5 -54; January 2014 EIR Attachment, 7.)
Analysis: The project would increase impervious surfaces at the project site, resulting in
a 25 year runoff of approximately 4,7 cfs and 7.8 cfs, at different locations, A hydrology
technical report was completed for the project, and concluded that the flows from the
proposed project as compared with the existing conditions at the site is minor and would
not exceed the capacity of any street or adjacent storm drain facility downstream of the
project. Therefore, impacts would be less than significant. (EIR, pp. 5 -53, 5 -54; January
2014 EIR Attachment, 7.)
H. LAND USE AND PLANNING
Impact: Would the project conflict with an applicable land use plan, policy, or regulation
of an agency with jurisdiction over the project (including, but not limited to the general
plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose,
of avoiding or mitigating an environment effect?
Finding: Less Than Significant. (EIR, pp. 5 -55, 5 -56; January 2014 EIR Attachment, pp.
7 -8)
15 "Exhibit A"
SeAnger Farmhouse and Orchard
Residential Development Project
I. NOISE
CEQA Findings
Analysis: The project is currently designated single family residential and low density
residential on City plans. While the site would require a variance for reduced street
frontages for Lot 7 (from 50 feet to 38 feet) and for Lot 8 (from 50 feet to 45 feet),
variances do not conflict with any applicable land use plan, policy or regulations as they
are allowed by the City Zoning Code. The project would also comply with the City's
General Plan goal supporting development of single family residential lots of minimum
areas of at least 6,000 square feet. As a result, this impact is less than significant,
Because the project would maintain the existing historic structure located on the property,
the project would also be consistent with any goals and policies supporting the
preservation of historic resources within the City. (EIR, pp. 5 -53, 5 -54; January 2014
FIR Attachment, pp. 7 -8.)
I. Impact: Would the project expose persons or generate excessive groundborne vibration or
groundborne noise levels?
Finding: Less Than Significant, (EIR, pp. 5 -58, 5 -59, 5 -60; January 2014 EIR
Attachment, p, 8)
Analysis: Long -term operational activities associated with noise are the vehicular traffic
going into and out of the residential community. Typical automobile traffic does not
generate vibration levels that can be felt within adjacent residential dwellings, therefore
operational activities would not generate excessive vibrations and this impact is less than
significant. (EIR, p. 5 -59; January 2014 EIR Attachment, p. 8.) Any groundborne
vibration associated with construction would be temporary in nature and therefore would
also be a less than significant impact. (EIR, p, 5 -58)
2. Impact: Would the project cause a substantial permanent increase in ambient noise levels
in the proj act vicinity above levels existing without the project?
Finding: Less Than Significant. (EIR, pp. 5 -58, 5 -59, 5 -60; January 2014 EIR
Attachment, p. 8)
Analysis: Long -term operational activities associated with the project would be the
vehicular traffic going into and out of the residential community. The greatest number of
vehicles that would travel any of the roadways near the project site is along East Santa
Clara Avenue. There would be a maximum of 138 project -added vehicle trips on this
roadway each day. At a posted speed of 40 miles an hour, this would generate a noise
exposure level of less than 47 dBA CNEL 50 feet from the roadway centerline and would
not exceed exterior noise level standards set by the City of Santa Ana. Therefore, this
impact is considered less than significant. (EIR, p. 5 -50.)
J. POPULATION AND HOUSING
1. Impact: Would the project induce substantial population growth in an area, either directly
or indirectly?
16 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Finding: Less Than Significant. (EIR, pp. 5 -60, 5 -61, 5 -62; January 2014 EIR
Attachment, p. 8.)
Analysis: The project would introduce 22 new single family residences and preserve in
place one historic single family residence. According to the General Plan Housing
Element the average size of households in the City is 4.7 persons. The Southern
California Association of Governments has established a target goal for the City of new
housing. While the City is not responsible for constructing this housing, it is required to
identify sites within the City that would be suitable for housing development and to
remove barriers to such construction. The project's residential units would serve to help
the City meet its target for housing, however, when compared to the overall population of
the City, the project would not induce substantial growth in population. Therefore, this
impact is less than significant. (EIR, p. 5 -61; January 2014 EIR Attachment, p. 8,)
K. PUBLIC SERVICES
1. Impact: Would the project result in substantial adverse physical impacts associated with
the provision of new or physically altered governmental facilities, the construction of
which could cause significant environmental impacts, in order to maintain acceptable
service ratios, response times or other performance objectives for any of the public
services including fire protection, police protection, schools, parks, and other public
facilities?
Finding: Less Than Significant. (EIR, pp. 5 -62, 5 -63; January 2014 EIR Attachment, p.
8.)
Analysis: The increase of 22 new residences and the rehabilitation of an existing vacant
residence will not increase demand for fire or police protection. The project would be
required to contribute to the impacted school district with development impact fees for
the proposed new residences. However, with compliance with existing regulations, no
significant impacts on schools are anticipated. While the project will increase demand
and use of Portola Park, this is not anticipated to be substantial enough to adversely
impact the park. Therefore, these impacts are considered less than significant. (EIR, p,
5 -63; January 2014 EIR Attachment, p. 8.)
L. RECREATION
1, Impact: Would the project increase the use of existing neighborhood and regional parks
or other recreation facilities such that substantial physical deterioration of the facility
would occur or be accelerated?
Finding: Less Than Significant. (EIR, pp. 5 -63, 5 -64; January 2014 EIR Attachment, p.
8,)
Analysis: The project would result in an increased demand for recreation services and
facilities, specifically in Portola Park, adjacent to the project site. However, the increase
in demand resulting from 22 new residences is not anticipated to result in significant
17 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
impacts or lead to substantial physical deterioration of park facilities. Therefore, this
impact is less than significant. (EIR, p. 5 -63, 5 -64; January 2014 EIR Attachment, p, 8.)
2. Impact: Would the project require construction or expansion of recreational facilities
which may have an adverse physical effect on the environment?
Finding: Less Than Significant. (EIR, pp, 5 -63, 5 -64; January 2014 EIR Attachment, p.
8.)
Analysis: The project would result in an increased demand for recreation services and
facilities, specifically in Portola Park, adjacent to the project site. However, the increase
in demand resulting from 22 new residences is not anticipated to result in the need to
construct new facilities. Therefore, this impact is less than significant. (EIR, p. 5 -63, 5-
64; January 2014 EIR Attachment, p. 8.)
M. TRAFFIC
I. Impact: Would the project substantially increase hazards due to a design feature?
Finding: Less Than Significant. (EIR, pp. 5 -98; January 2014 EIR Attachment, pp, 8 -9.)
Analysis: The project does not propose any design features that would pose a hazards to
traffic. As a result, this impact is considered less than significant. (EIR, p. 5 -96, 5 -97.)
N. UTILITIES AND SERVICE SYSTEMS
1. Impact: Would the project exceed wastewater treatment requirements of the applicable
Regional Water Quality Control Board?
Finding: Less Than Significant. (EIR, pp. 5 -99 through 5 -101; January 2014 EIR
Attachment, p. 9.)
Analysis: Orange County Sanitation District ( "OCSD ") is the service agency providing
wastewater treatment for the City. The OCSD treatment plant has capacity to serve the
project's projected wastewater generation, which is 7,440 gallons per day or less.
Therefore, impacts would be less than significant, (EIR, p. 5 -100.)
2, Impact: Would the project require or result in the construction of new water or
wastewater treatment facilities or expansion of existing facilities, the construction of
which could cause significant environmental effects?
Finding: Less Than Significant. (EIR, pp. 5 -99 through 5 -101; January 2014 EIR
Attachment, p. 9.)
Analysis: OCSD is the service agency providing wastewater treatment for the City. The
OCSD treatment plant has capacity to serve the project's projected wastewater
generation, which is 7,440 gallons per day or less. The City is served by its own
municipal water system, with the majority of the water supply obtained from
groundwater and the remainder purchased from imported sources. The project would
18 "Exhibit A"
Sex1inger Farmhouse and Orchard
Residential Development Project
CEQA Findings
increase demand on the local water system, however the net increase would not be
significant. Therefore, no water or wastewater facilities, or expansion of existing
facilities, would be required and impacts are less than significant. (EIR, pp. 5 -99 through
5 -101; January 2014 EIR Attachment, p. 9.)
3. Impact: Would the project require or result in the construction of new storm water
drainage facilities or expansion of existing facilities, the construction of which could
cause significant environmental effects?
Finding: Less Than Significant'.. (EIR, pp. 5.99 through 5 -101; January 2014 EIR
Attachment, p. 9.)
Analysis: The project would increase impervious surfaces at the project site, resulting in
a 25 year runoff of approximately 4.7 cfs and 7.8 cfs, at different locations. A hydrology
technical report was completed for the project, and concluded that the flows from the
proposed project as compared with the existing conditions at the site is minor and would
not exceed the capacity of any street or adjacent storm drain facility downstream of the
project. Therefore, impacts would be less than significant. (EIR, pp. 5 -53, 5 -54; January
2014 EIR Attachment, 7.)
4. Impact: Would the project result in insufficient water supplies being available to service
the project from existing entitlements and resources?
Finding: Less Than Significant. (EIR, pp. 5 -99 through 5 -101; January 2014 EIR
Attachment, p. 9.)
The City is served by its own municipal water system, with the majority of the water
supply obtained from groundwater and the remainder purchased from imported sources.
The project would increase demand on the local water system, however the net increase
would not be significant. Therefore, no water or wastewater facilities, or expansion of
existing facilities, would be required and impacts are less than significant. (EIR, pp. 5 -99
through 5 -101; January 2014 EIR Attachment, p. 9.)
5. Impact: Would the project result in a determination by the wastewater treatment provider
which services or may serve the project that it has inadequate capacity to serve the
project's projected demand in addition to the provider's existing commitments?
Finding: Less Than Significant. (EIR, pp. 5 -99 through 5 -101; January 2014 EIR
Attachment, p. 9.)
Analysis: OCSD is the service agency providing wastewater treatment for the City. The
OCSD treatment plant has capacity to serve the project's projected wastewater
generation, which is 7,440 gallons per day or less. Therefore, impact would be less than
significant. (EIR, p. 5 -100.)
19 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
6. Impact: Would the project be served by a landfill with insufficient permitted capacity to
accommodate the project's solid waste disposal needs?
Finding: Less Than Significant. (EIR, pp. 5 -99 through 5 -101; January 2014 EIR
Attachment, p. 9.)
Analysis: The project would result in solid waste during the construction phase and long-
term operational waste disposal. However, the Frank R. Bowerman Sanitary Landfill has
capacity to serve the project. In addition local jurisdictions are required by state law to
divert at least 50 percent of all solid waste generated, the City has numerous recycling
programs in place to fulfill this mandate. Therefore, impacts related to solid waste are
less than significant. (EIR, p. 5 -100.)
Impact: Would the project not comply with federal, state, and local statutes and
regulations related to solid waste?
Finding: Less Than Significant, (FIR, pp. 5 -99 through 5 -101; January 2014 EIR
Attachment, p. 9.)
Analysis: While local jurisdictions are required by state law to divert at least 50 percent
of all solid waste generated, the City has numerous recycling programs in place to fulfill
this mandate, including for waste generated at the project site. Therefore, no violation of
federal, state, and local statutes relating to solid waste are anticipated and impacts are less
than significant. (EIR, p. 5 -100.)
6.0 Findings Regarding Potentially Significant Environmental Impacts
Mitigated to a Level of Less Than Significant
The City Council finds that the following environmental impacts identified in the EIR are potentially
significant but can be mitigated to a less than significant level, The potentially significant impacts and the
mitigation measures which would reduce them to a less than significant level are set out in the EIR and
are summarized as follows:
A. AESTHETICS
1. Impact: Would the Project substantially degrade the existing visual character or quality of
the site and its surroundings?
Finding: Less Than Significant, With Mitigation Incorporated. (EIR, p, 5 -4)
Analysis: Short term construction impacts would temporarily alter the visual appearance
of the project area by exposing surfaces, grading land, stockpiling of construction
materials and debris, etc. In addition, development of the project site with new residences
and landscaping would permanently alter the nature and appearance of the project site
from its existing setting. However, the existing single family residence located on the
site, and approximately 10 orange trees will be located on the site after development.
The 22 new single family residences will be designed to be similar to surrounding uses
20 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
on adjacent parcels in character and density, and the rehabilitation of the existing
structure will be done in manner that maintains the existing character of the building.
Therefore, long term impacts will be less than significant. (EIR, p. 5 -4, 5 -5; January
2014 EIR Attachment, p. 4.)
Short term construction impacts can be mitigated to a level of less than significant with
implementation of mitigation measure AES -1:
AES -1: The following standard construction practices will be implemented to minimize
potential aesthetic impacts:
• Construction areas shall receive appropriate routine maintenance to reduce
unnecessary debris piles;
• Construction areas shall have appropriate erosion and dust control programs in
place;
• Appropriate screening will be used to buffer views of construction equipment
and material, where feasible.
Implementation of AES -I will reduce the presence of debris piles, which would, in the
short term, alter the visual appearance of the project area. The use of screens will block
some views from adjacent parcels of the construction site, including stockpiled materials
and debris, graded and exposed areas, and construction equipment. As a result, with
implementation of the proposed mitigation measure, impacts will be reduced to less than
significant. (EIR, pp. 5 -4, 5 -5, 5 -6.)
2. Impact: Would the Project create a new source of substantial light or glare which would
adversely affect day or nighttime views in the area?
Finding: Less Than Significant, With Mitigation Incorporated. (EIR, p. 5 -5, 5 -6.)
Analysis: The proposed project will create light and glare impacts that may affect
adjacent residential communities and introduce new sources of light. These sources
include new streetlights, interior lighting from residences, light from vehicles, and
landscape lighting. (EIR, p. 5 -5, 5 -6.) These sources are similar to the types of light
sources that are already present in the vicinity of the project site. (EIR, p. 5 -2.)
However, with the implementation of mitigation measure AES -2, these potential impacts
will be reduced to less than significant:
AES -2: To ensure that the project's exterior lighting does not spill over onto adjacent
uses, all exterior lighting, including street lighting and landscape lighting, shall be
shielded or directed away from adjoining uses pursuant to all applicable lighting
standards and requirements of the City Municipal Codes and Zoning Codes. (EIR, p. 5-
6.)
21 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Implementation of AES -2 will require consistency with lighting standards that will
ensure the project's light sources will be similar to those already existing in the
immediate vicinity of the project site, and therefore will reduce the potential impact to
less than significant. (EIR, p. 5 -6, 5 -2.)
H. AIR QUALITY
I. Impact: Would the Project conflict with or obstruct implementation of the applicable air
quality plan?
Finding: Less Than Significant, With Mitigation Incorporated. (EIR, p. 5 -10 through 5-
13.)
Analysis: The applicable air quality management plan is the South Coast Air Quality
Management District's ( "SCAQMD ") 2007 Air Quality Management Plan ( "AQMP ").
This Plan proposes attainment of federal PM2.5 standards. (EIR, p. 5 -7) Short-term,
unmitigated daily construction impacts will result in PM10 and PM2.5 emissions that
exceed the AQMP thresholds for particulate matter. Therefore, this impact is potentially
significant, However, with the implementation of the following mitigation measures,
particulate matter emissions will be reduced to less than significant:
AIR -1: In order to reduce particulate matter emissions during project construction,
nontoxic soil stabilizers or comparable dust suppressant shall be applied to all inactive
construction areas (previously graded areas inactive for five consecutive days or more).
Chemical soil stabilizers, if used, shall be applied according to manufacturer's
specifications.
AIR -2: In order to reduce particulate matter emissions during construction, exposed
surfaces shall be watered three times a day.
AIR -4: In order to reduce particulate matter emissions during construction, speeds on
unpaved roads will not exceed 15 miles per hour.
The incorporation of these measures will reduce PM2.5 emissions and bring the project
within the standards set by SCAQMD and the 2007 AQMP. This is because chemical
stabilizers will reduce dust pick up from inactive graded areas, spraying exposed dirt with
water will reduce fugitive dust emissions, and reducing the speed of trucks on unpaved
areas will reduce dust kick -up. In total, these measures are expected to reduce PM2.5
emissions from 5.17 pounds per day to 1.55 pounds per day. (EIR, Table 5 -3, compared
to Table 5 -5.) As the PM2.5 threshold is 4 pounds per day, PM2.5 would be reduced to a
level of less than significant, with incorporation of the above mitigation measures.
Similarly, emissions of PM10 would be reduced from 21.08 pounds per day, to 3,74
pounds per day. As the PM10 threshold is 6 pounds per day, PM10 would be reduced to
a level of less than significant with incorporation of the above mitigation measures,
(EIR, Table 5 -3, compared to Table 5 -5) Given that the project proposal analyzed in the
Draft FIR included development of 24 new single family residences, and the project as
approved will include development of only 22 new single family residences, it stands to
22 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
reason that with the reduced intensity of the project, impacts will still be less than
significant with mitigation incorporated, (January 2014 EIR Attachment, p. 4.)
2. Impact: Would the Project violate any air quality standard or contribute significantly to
an existing or projected air quality violation?
Finding: Less Than Significant, With Mitigation Incorporated. (FIR, p. 5 -10 through 5
13.)
Analysis: SCAQMD has established daily emissions thresholds for several criteria
pollutants. While the proposed project will result in unmitigated daily construction
emissions below all thresholds for regional significance (EIR, Table 5 -1), and for NOX
and CO thresholds for local significance (FIR, Table 5 -3), the proposed project would
exceed daily construction thresholds for PM10 and PM2.5. Short-term, unmitigated daily
construction impacts will result in PM10 and PM2.5 emissions that exceed the AQMP
thresholds for particulate matter. Therefore, this impact is potentially significant.
However, with the implementation of the following mitigation measures, particulate
matter emissions will be reduced to less than significant:
AIR -l; In order to reduce particulate matter emissions during project construction,
nontoxic soil stabilizers or comparable dust suppressant shall be applied to all inactive
construction areas (previously graded areas inactive for five consecutive days or more).
Chemical soil stabilizers, if used, shall be applied according to manufacturer's
specifications,
AIR -2: In order to reduce particulate matter emissions during construction, exposed
surfaces shall be watered three times a day,
AIR -4: In order to reduce particulate matter emissions during construction, speeds on
unpaved roads will not exceed 15 miles per hour.
The incorporation of these measures will reduce PM2.5 and PM10 emissions. This is
because chemical stabilizers will reduce dust pick up from inactive graded areas,
spraying exposed dirt with water will reduce fugitive dust emissions, and reducing the
speed of trucks on unpaved areas will reduce dust kick -up. In total, these measures are
expected to reduce PM2.5 emissions from 5.17 pounds per day to 1,55 pounds per day.
(FIR, Table 5 -3, compared to Table 5 -5.) As the PM2.5 threshold is 4 pounds per day,
PM2.5 would be reduced to a level of less than significant, with incorporation of the
above mitigation measures. Similarly, emissions of PMI O would be reduced from 21.08
pounds per day, to 3.74 pounds per day. As the PM10 threshold is 6 pounds per day,
PMI O would be reduced to a level of less than significant with incorporation of the above
mitigation measures. (EIR, Table 5 -3, compared to Table 5 -5.) Given that the project
proposal analyzed in the Draft FIR included development of 24 new single family
residences, and the project as approved will include development of only 22 new single
family residences, it stands to reason that with the reduced intensity of the project,
23 "Exhibit A"
SeAnger Farmhouse and Orchard
Residentlal Development Project
CEQA Findings
impacts will still be less than significant with mitigation incorporated. (January 2014
EIR Attachment, p. 4.)
3, Impact: Would the Project expose sensitive receptors to substantial pollutant
concentrations?
Finding: Less Than Significant, With Mitigation Incorporated, (EIR, p. 5 -10 through 5-
13.)
Analysis: The nearest sensitive receptors to the proposed project site are residential
communities located immediately adjacent to the project site to the north, south, and
west. To calculate localized significance, a worst -case, maximum construction
disturbance area of two acres per day was assumed, The closest residences were
determined to be 25 meters away, At this distance, it was determined that sensitive
receptors may be exposed to particulate matter in excess of SCAQMD's thresholds.
(EIR, p. 10, 5 -11, Table 5 -3.) As a result, this impact was considered potentially
significant. However, with the implementation of the following mitigation measures, this
impact is reduced to less than significant:
AIR -1: In order to reduce particulate matter emissions during project construction,
nontoxic soil stabilizers or comparable dust suppressant shall be applied to all inactive
construction areas (previously graded areas inactive for five consecutive days or more).
Chemical soil stabilizers, if used, shall be applied according to manufacturer's
specifications.
AIR -2: In order to reduce particulate matter emissions during construction, exposed
surfaces shall be watered three times a day.
AIR -3: In order to reduce localized impacts to sensitive receptors in the project vicinity
during construction, equipment staging areas will be positioned at least 300 feet away
from the sensitive receptors.
AIR -4: In order to reduce particulate matter emissions during construction, speeds on
unpaved roads will not exceed 15 miles per hour.
The incorporation of these measures will reduce exposure of sensitive receptors to
particulate matter. AIR -1, AIR -2, and AIR -4 will all reduce the amount of particulate
matter that enters into the air, while AIR -3 will ensure that areas with a higher propensity
to emit particulate matter are positioned a substantial distance away from sensitive
receptors. As a result, this impact is reduced to less than significant. (EIR, Table 5 -3,
compared to Table 5 -5.) Given that the project proposal analyzed in the Draft EIR
included development of 24 new single family residences, and the project as approved
will include development of only 22 new single family residences, it stands to reason that
with the reduced intensity of the project, impacts will still be less than significant with
mitigation incorporated. (January 2014 EIR Attachment, p. 4.)
C. BIOLOGICAL RESOURCES
24 "Exhibit A"
SexlingerFarmhouse and Orchard
Resldentlal Development Project
CEQA Findings
Impact: Would the project interfere substantially with the movement of any native or
migratory fish or wildlife species or with established native resident or migratory wildlife
corridors, or impede the use of native wildlife nursery sites?
Finding: Less Than Significant, With Mitigation Incorporated, (EIR, p. 5 -18 through 5-
20.)
Analysis: Nesting and migratory birds, raptors, and bats may find marginal habitat
within the project site, and construction activities may impact them, Therefore, this
impact is considered potentially significant. However, with implementation of the
following mitigation measures, this impact will be reduced to less than significant:
111I0-1: In order to comply with the Migratory Bird Treaty Act and relevant sections of
the California Fish and Game Code (e.g., 3500 et seq.), any vegetation clearing should
take place outside of the typical avian nesting season (i.e., February 15 — August 31), to
the maximum extent practical, If this is not possible, prior to ground disturbing activities
a qualified biologist should conduct a pre - construction nesting bird survey. If active
nests are observed, a minimum buffer zone from occupied nests is recommended to the
maximum extent practicable, Once nesting has ended, the buffer may be removed.
BIO -2: Limits of grading and construction activities within the biological study area
should be clearly delineated with temporary stalling, flagging, or similar materials.
BI0-3: The project footprint should be minimized to the maximum extent feasible and
access to it should be via pre - existing/maintained access routes to the greatest extent
possible.
BIO -4: To avoid attracting predators and nuisance species, the project footprint shall be
clear of debris, where possible.. All food related trash items should be enclosed in sealed
containers and regularly removed from the project footprint.
The incorporation of those mitigation measures will ensure that any existing nests of
migratory birds are found and protected prior to commencement of construction.
Delineation of grading and construction activity areas will further ensure that
undiscovered nests are not disturbed. (EIR, pp. 5 -19, 5 -20.) Further, some orange trees
located on the site will be preserved in place, and any trees removed as a result of them
being dead or dying will be replaced to fill in the orchard area on Lot 1. This will reduce
the amount of ground disturbed by project construction, and further reduce impacts to
habitat and species to less than significant and maintain nesting opportunities. Given that
the original project proposal analyzed in the Draft EIR included development of 24 new
single family residences, and the project as approved will include development of only 22
new single family residences, it stands to reason that with the reduced intensity of the
project, impacts will still be less than significant with mitigation incorporated. (January
2014 EIR Attachment, p. 4.)
D. CULTURAL RESOURCES
25 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
1. Impact: Would the project cause a substantial adverse change in the significance of an
archaeological resource pursuant to CEQA Guidelines section 15064.5?
Finding: Less Than Significant, With Mitigation Incorporated. (January 2014 EIR
Attachment, p. 6; EIR pp. 5 -41.)
Analysis: There is no evidence of landscape related archaeological sites such as road
traces, ruins, or complex irrigation systems located within the portions of the site that will
be developed with new residences. (EIR, p. 5 -38.) A field survey conducted for the
proposed project found no archaeological resources within the project site. The field
survey found little evidence of past activities except for one remaining standpipe and gate
valve, which are typical of orange groves, and one concrete pad located south of the
garage. Past plowing of the site limited the visibility of the original ground surface, and
no early trash deposits were noted by the field survey, (EIR, p. 5 -41.) However the
project includes ground disturbing activities and therefore there is a potential for impacts
to unknown archaeological resources, With the incorporation of the following mitigation
measures, this impact is reduced to a level of less than significant:
CULT -1: An Orange County certified Archaeologist shall be present at the pre -grade
and at the tree removal meetings to discuss the monitoring, collecting and safety
procedures for the project. The archaeologist should review the construction plans and
schedule.
CULT -2: An Orange County certified Archaeologist shall be retained to monitor
grading activities, to observe and retrieve any buried prehistoric and historic artifacts or .
features that may be uncovered.
CULT -4: If prehistoric or historic artifacts or deposits are uncovered, the Orange
County certified Archaeologist shall temporarily halt construction activities for the
immediate area until the archaeologist can evaluate the significance of the find. The
archaeologist would immediately contact the field manager and project personnel.
Implementation of a recovery program would follow, if the artifacts are determined
potentially eligible for the California Register.
CULT -5: Any recovered artifacts shall be properly collected with photographs, field
notes, and locations plotted on a USGS 7.5' topographic quadrangle. Artifacts will be
identified and catalogued, and stabilized for curation. Any recovered artifacts shall be
offered, on a first right -of- refusal basis, to a repository with a retrievable collection
system and an educational and research interest in the materials.
CULT -6: A final monitoring report, including an itemized inventory and pertinent field
data, shall be sent to the Lead Agency as well as copies of the reports to the South
Central Coastal Information Center at the California State University at Fullerton.
Implementation of the above measures will ensure that any unknown and unexpected
archaeological resources discovered during construction activities are properly retrieved,
26 "Exhibit A"
Saxlinger Farmhouse and Orchard
Residential Development Project
OEQA Findings
preserved, and recorded. As a result, impacts are considered less than significant. (EIR,
p. 5 -41, 5 -42.)
2. Impact: Would the project directly or indirectly destroy a unique paleontological resource
or site or unique geologic feature?
Finding: Less Than Significant, With Mitigation Incorporated. (January 2014 EIR
Attachment, p. 6; FIR pp. 5 -42, 5 -43.)
Analysis: A paleontological records review was conducted at the Natural History
Museum of Los Angeles County, and indicated that no fossil localities have been
previously recorded for the site. (EIR, p. 4 -14.) Therefore, there is no expected
disturbance of paleontological resources. However the project includes ground
disturbing activities and therefore there is a potential for impacts to unknown
paleontological resources. With the incorporation of the following mitigation measures,
this impact is reduced to a level of less than significant:
CULT -4: If prehistoric or historic artifacts or deposits are uncovered, the Orange
County certified Archaeologist shall temporarily halt construction activities for the
immediate area until the archaeologist can evaluate the significance of the find. The
archaeologist would immediately contact the field manager and project personnel.
Implementation of a recovery program would follow, if the artifacts are determined
potentially eligible for the California Register.
PALEO-1: During grading activities, a qualified paleontologist shall be retained to
conduct part time monitoring to observe and retrieve any significant specimen that may
be uncovered in the older Quaternary sediments.
PALED -2: If vertebrate fossils or buried deposits are uncovered, the paleontological
monitor shall temporarily halt construction activities for the immediate area until the
monitor can evaluate the significance of the find. The monitor would immediately
contact the field manager and project personnel. Implementation of a recovery program
would follow, if the fossils are determined significant.
PALEO -3: Any recovered fossils shall be properly collected with photographs, field
notes, and locations plotted on a USGS topographic quadrangle map. Fossils will be
identified and catalogued, and stabilized for curation. Any recovered fossils shall be
offered, in a first right of refusal basis to a repository with a retrievable collection system
and an educational and research interest in the materials.
PALED -4: A final monitoring report, including an itemized inventory and pertinent field
data, shall be sent to the Lead Agency as well as copies of the report to the Natural
History Museum of Los Angeles and to the Orange County Curation Facility in Santa
Ana.
Implementation of the above measures will ensure that any unknown and unexpected
paleontological resources discovered during construction activities are properly retrieved,
27 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residentlal Development Project
CEQA Findings
preserved, and recorded. As a result, impacts are considered less than significant. (EIR,
p. 5 -41, 5 -42, 5 -43.)
3. Impact: Would the project disturb any human remains, including those interred outside of
formal cemeteries?
Finding: Less Than Significant, With Mitigation Incorporated. (January 2014 EIR
Attachment, p. 6; EIR pp. 5 -41.)
Analysis; There are no known formal cemeteries on the project site and no human
remains were discovered during field surveys. However, the project may involve ground
disturbing activities such as grading for construction and excavation, As such, the project
has the potential to disturb or destroy undocumented, undiscovered remains. With the
following mitigation measure, this impact is considered less than significant:
CULT -3: If human remains are found during the excavation, the Native American
Graves Protection Act Guidelines and State law require that construction personnel halt
the work in the immediate area, leave the remains in place, and contact the manager,
project personnel, and the Orange County Coroner. If the Coroner determined the
remains are prehistoric, the Coroner will contact the Native American Heritage
Commission and the most likely descendent from the Native American community will
be informed.
As a result of CULT -3, unknown and undocumented human remains will be protected
and preserved, and this impact will be mitigated to less than significant. (EIR, pp. 5 -41
through 5 -43.)
E. GEOLOGY AND SOILS
1. Impact: Would the Project expose people or structures to potential adverse effects,
including the risk of loss, injury or death involving: (i) rupture of a known earthquake
fault; (ii) strong seismic ground shaking; (iii) seismic - related ground failure, including
liquefaction; or (iv) landslides?
Finding: Less Than Significant, With Mitigation. (EIR, p. 5 -44, 5 -45.)
Analysis: As with all areas in Southern California, the project site is subject to
seismically inducted ground movements, and nearby fault zones include the San Andreas,
Elsinore, and San Jacinto Fault zones. However, the project site does not include active
or potentially active faults. Due to the fact that groundwater depth is not shallow,
impacts posed by liquefaction and landslides are negligible, However, because there may
be seismic ground shaking at the project site, the following mitigation measure will
reduce the potential for impact to less than significant:
GEO -1: The project shall comply with all applicable standard engineering practices,
grading ordinances of the City of Santa Ana, County of Orange and applicable federal
state, and regional regulations, including the California Building Code.
28 "Exhibit A"
Sextinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Incorporation of GEO -1 will ensure that proposed structures and the rehabilitation of the
existing structure, will be done to reduce impacts posed by earthquakes to less than
significant. (EIR, p. 5 -45; January 2014 EIR Attachment, p. 6,)
2. Impact: Would the Project result in substantial soil erosion or the loss of topsoil?
Finding: Less Than Significant, With Mitigation. (EIR, p. 5 -44, 5 -45.)
Analysis: Clearing and grading for construction may expose soils to short -term wind and
water erosion. Implementation of erosion control measures as required by the City and
adherence to all requirements set forth in the National Pollutant Discharge Elimination
System (NPDES) permit for construction activities would ensure that any such impacts
are less than significant. (EIR, p. 5 -45; January 2014 EIR Attachment, p. 6.) As such,
the following mitigation measure would apply:
GEO -1: The project shall comply with all applicable standard engineering practices,
grading ordinances of the City of Santa Ana, County of Orange and applicable federal
state, and regional regulations, including the California Building Code.
Incorporation of GEO -I will ensure that all required measures to reduce soil erosion and
loss of topsoil during the construction phases are adhered to and impacts are reduced to
less than significant. (EIR, p. 5 -45; January 2014 EIR Attachment, p. 6.)
F. HAZARDS AND HAZARDOUS MATERIALS
1. Impact: Would the project create a significant hazard to the public or the environment
through reasonably foreseeable upset and accident conditions involving the release of
hazardous materials into the environment?
Finding: Less Than Significant, With Mitigation. (EIR, pp. 5 -51, 5 -52; January 2014 EIR
Attachment, 7.)
Analysis: Construction activities, including grading, may expose surface or subsurface
hazardous materials. In addition, the rehabilitation of the existing structures on the
project site may result in the handling of lead based paint and asbestos containing
materials. This, this is a potentially significant impact. However, with the incorporation
of the following mitigation measures, this impact is reduced a level of less than
significant:
HAZ-1: An asbestos and lead containing materials survey will be performed by a
qualified environmental professional before any demolition permit is issued. The survey
will adhere to federal, state, and local regulations and will be sent to the City for
approval. If the survey finds asbestos containing materials (ACMs) in the structures, then
those materials containing ACMs will be removed and disposed of in accordance with
federal, state, and local laws and regulations.
HAZ-2: If lead -based paint is discovered during on -site investigation, all building
materials containing lead based paint will be removed, transported, and disposed of at
29 "Exhibit A"
Sextinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
landfills that meet acceptance criteria for the waste being disposed. Demolition and
removal shall be performed in conformance with federal, state, and local laws and
regulations pertaining to lead -based paint.
RAZ-3: As the property was in agricultural (orange grove) use in the past, residual
concentrations of insecticides, pesticides, or herbicides in near surface soil may be
present. Shallow soil sampling and analysis will be conducted prior to issuance of a
grading permit.
Incorporation of the above mitigation measures will ensure than any hazardous materials
present on the project site, either as part of the existing structures, or as part of the orange
orchard, are removed, handled, and disposed of consistent with best practices and
applicable regulations. As such, the impact is reduced to a level of less than significant.
(EIR, pp. 5 -51, 5 -52; January 2014 EIR Attachment, 7.)
2. Impact: Would the project impair implementation of or physically interfere with an
adopted emergency response plan or emergency evacuation plan?
Finding: Less Than Significant, With Mitigation. (EIR, pp. 5 -51, 5 -52; January 2014 EIR
Attachment, 7.)
Analysis: A Traffic Management Plan would be implemented as part of the project to
ensure construction does not interfere with any emergency response or emergency
evaluation plans. (EIR, pp. 5 -51, 5 -52; January 2014 EIR Attachment, 7.) The following
mitigation measure will ensure that impacts are reduced to a level of less than significant:
TRF -1: Prior to grading permit issuance, a Traffic Management Plan shall be submitted
for review and approval to the City of Santa Ana. Such plan shall consist of prior
notices, adequate sign posting, and detours. The TMP shall be reviewed and approved by
the City Police and Fire Departments so that construction does not interfere with any
emergency response or evacuation plans. (EIR, p. 5 -98.)
Implementation of TRF -I will ensure review, approval, and implementation of a TMP
that will take into account emergency access and evacuation plans. As such, impacts are
reduced to a level of less than significant.
G. HYDROLOGY AND WATER QUALITY
I, Impact: Would the project violate any water quality standards or waste discharge
requirements?
Finding: Less Than Significant, With Mitigation. (EIR, pp. 5 -53, 5 -54; January 2014 EIR
Attachment, 7.)
Analysis: The project would result in site runoff contributing to typical roadway
pollutants to existing drainage facilities. These pollutants include oil, grease, and other
petroleum derivatives. The State Regional Water Quality Control Board administers the
National Pollution Discharge Elimination System permit requirements in the project area,
and consistency with permit requirements will obligate the project to implement
30 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
H. NOISE
CEQA Findings
structural and non - structural BMPs. Thus with the incorporation of the following water
quality mitigation measures, the impacts of the project related to water quality will be
reduced to less than significant:
WQ -1: As part of the design of the proposed project, a Water Quality Management Plan
(WQMP) will be prepared and implemented. The WQMP will include structural and
non - structural BMPs, which will avoid or minimize, to the greatest extent possible, the
water quality impact associated with the project site.
WQ -2: The proposed project will require a NPDES permit and will require the
preparation of a SWPPP incorporating BMPs to reduce stormwater impacts during
construction,
Implementation of the above measures will ensure that BMPs limit urban pollutants to
the greatest extent practicable, while a SWPP will assist in reducing short -term
construction impacts. As a result, this impact is reduced to less than significant. (EIR,
pp. 5 -53, 5 -54; January 2014 EIR Attachment, p. 7.)
1. Impact: Would the project expose persons to or generate noise levels in excess of
standards established in the local general plan or noise ordinance, or applicable standards
established by other agencies?
Finding: Less Than Significant, With Mitigation. (EIR, pp. 5 -58, 5 -59, 5 -60; January
2014 EIR Attachment, p. 8)
Analysis: Construction noise levels will likely be heard at the nearest noise sensitive land
uses. However, the City of Santa Ana has construction regulations in place that prohibit
constriction noise during certain hours, Incorporation of the following mitigation
measure will ensure consistency with City requirements and mitigate this impact to less
than significant:
N01-1; Prior to issuance of a grading permit, the contractor shall provide evidence
acceptable to the City of Santa Ana that all construction equipment, fixed or mobile, shall
be equipped with properly operating and maintained mufflers. Construction activities
shall be limited between the hours of 7:00 AM and 8 :00 PM on weekdays, including
Saturdays, and prohibited any time on Sundays or federal holidays.
Incorporation of NOI -1 will ensure that construction noise complies with applicable local
noise regulations. This impact is less than significant. (EIR, pp. 5 -58, 5 -59, 5 -60; January
2014 EIR Attachment, p. 8)
2. Impact: Would the project result in a substantial temporary or periodic increase in
ambient noise levels in the project vicinity above levels existing without the project?
Finding: Less Than Significant, With Mitigation. (EIR, pp. 5 -58, 5 -59, 5 -60; January
2014 FIR Attachment, p. 8)
31 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Analysis: Construction noise levels will likely be heard at the nearest noise sensitive land
uses. however, construction will be temporary in nature and with the following
mitigation measures, this impact is considered less than significant:
N0I -1: Prior to issuance of a grading permit, the contractor shall provide evidence
acceptable to the City of Santa Ana that all construction equipment, fixed or mobile, shall
be equipped with properly operating and maintained mufflers. Construction activities
shall be limited between the hours of 7:00 AM and 8:00 PM on weekdays, including
Saturdays, and prohibited any time on Sundays or federal holidays.
N0I -2: During construction, stationary construction equipment shall be placed such that
emitted noise is directed away from noise - sensitive receptors.
N0I -3: Construction contractor shall incorporate muffling features into all construction
vehicles and equipment and maintain all vehicles and equipment in efficient operating
condition according to the manufacturer's specifications.
Incorporation of these mitigation measures will ensure that construction noise complies
with Santa Ana noise regulations, and that temporary ambient construction noise is
reduced. With these mitigation measures, impacts are less than significant. (EIR, pp. 5-
58, 5 -59, 5 -60; January 2014 EIR Attachment, p. 8)
Impact: Would the project cause an increase in traffic which is substantial in relation to
the existing traffic load and capacity of the street system?
Finding: Less Than Significant, With Mitigation. (EIR, pp. 5 -72 tbrough 5 -98; January
2014 EIR Attachment, pp. 8 -9)
Analysis: The City of Santa General Plan establishes Level of Service ( "LOS ") D as the
threshold for acceptable service level outside of major development areas. Future traffic
conditions were forecast based on discussions with City staff and OCTAM 3.2 traffic
modeling, (EIIt, p. 5 -73.) Traffic modeling indicated that for the six intersections and 10
roadway segments within the project site's study area, all would operate at acceptable
level of service in the year 2013, both with and without the project. (EIR, p. 5 -83 [Table
5 -22].) However, potential impact to one intersection in the 2035 future condition was
identified. (EIR, p. 5 -88; Table 5 -24; p. 5 -95, Table 5.29.) The intersection of Santa
Clara Averme /Wright Street is expected to be impacted in the PM peals hour, as a result
of the project. (EIR, p. 5 -95.) However, with the incorporation of the following
mitigation measure, this impact will be reduced to less than significant:
TRF -2: Implementation of a traffic signal is recommended at the intersection of Santa
Clara Avenue and Wright Street. The project will be subject to fair -share improvements,
and the project applicant will be required to finance the improvements required on a pro -
rata fair -share basis.
32 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Requiring the project applicant to pay its fair share of this improvement will ensure that
funds are available for that portion of the improvement attributable to the project. As a
result, this impact is reduced to less than significant. (EAR, pp. 5 -95, 5 -98; January 2014
EAR Attachment, pp. 8 -9,)
2. Impact: Would the project exceed, either individually or cumulatively, a level of service
standard established by the county congestion management agency for designated roads
or highways?
Finding: Less Than Significant, With Mitigation. (EIR, pp. 5 -72 through 5 -98; January
2014 EAR Attachment, pp. 8 -9)
Analysis: The City of Santa General Plan establishes Level of Service ( "LOS ") D as the
threshold, for acceptable service level outside of major development areas. These criteria
are either more stringent than or meet Congestion Management Plan criteria which
designates LOS E as the minimum acceptable level of service. (ETF, p, 5 -72.)
Future traffic conditions were forecast based on discussions with City staff and OCTAM
3.2 traffic modeling. (EIR, p. 5 -73.) Traffic modeling indicated that for the six
intersections and 10 roadway segments within the project site's study area, all would
operate at acceptable level of service in the year 2013, both with and without the project.
(EAR, p. 5 -83 [Table 5 -22].) I3owever, potential impact to one intersection in the 2035
future condition was identified. (EIR, p. 5 -88; Table 5 -24; p. 5 -95, Table 5 -29.) The
intersection of Santa Clara Avenue/Wright Street is expected to be impacted in the PM
peak hour, as a result of the project. (EAR, p, 5 -95.) However, with the incorporation of
the following mitigation measure, this impact will be reduced to less than significant:
TRF -2; Implementation of a traffic signal is recommended at the intersection of Santa
Clara Avenue and Wright Street. The project will be subject to fair -share improvements,
and the project applicant will be required to finance the improvements required on a pro -
rata fair -share basis.
Requiring the project applicant to pay its fair share of this improvement will ensure that
funds are available for that portion of the improvement attributable to the project. As a
result, this impact is reduced to less than significant. (EIR, pp. 5 -95, 5 -98; January 2014
EAR Attachment, pp. 8 -9.)
Impact: Would the project result in inadequate emergency access?
Finding: Less Than Significant, With Mitigation, (FIR, pp. 5 -72, 73, 98; January 2014
EIR Attachment, pp. 8 -9)
Analysis: A Traffic Management 'Plan would be implemented as part of the project to
ensure construction does not interfere with any emergency response or emergency
evaluation plans. The following mitigation measure will ensure that impacts are reduced
to a level of less than significant: (EIR, pp. 5 -72, 73; January 2014 EAR Attachment, 7.)
33 "Exhibit A"
SexlingerFarmhouse and Orchard
Residential Development Project CEQA Findings
TRF -1: Prior to grading permit issuance, a Traffic Management Plan shall be submitted
for review and approval to the City of Santa Ana. Such plan shall consist of prior
notices, adequate sign posting, and detours. The TMP shall be reviewed and approved by
the City Police and Fire Departments so that construction does not interfere with any
emergency response or evacuation plans. (EIR, p. 5 -98.)
Implementation of TRF -1 will ensure review, approval, and implementation of a TMP
that will take into account emergency access and evacuation plans. As such, impacts are
reduced to a level of less than significant,
7.0 Findings Regarding Growth Inducement
Pursuant to sections 15126(d) and 15126.2(d) of the State CEQA Guidelines, an EIR must discuss the
ways a proposed project could foster economic or population growth or the construction of additional
housing, directly or indirectly, in the surrounding environment. This project involves the development of
22 new single family residences and the preservation in place of one additional single family residence.
The Project site is located in an area surrounded by developed land, and is served by existing
infrastructure and public services, The project's new residences are anticipated to generate less than 106
persons, based on Santa Ana's average household size of between 4 and 5 persons. (EIR, p. 6 -4.) This
growth represents less than a 0.1 percent increase of the City's population in 2012 and therefore, impacts
are considered less than significant — the project would not foster growth inducing impacts. (EIR, pp. 6 -1
through 64.) In addition, these units are within the population forecasts and housing target assigned to
the City by the South Coast Association of Governments. (EIR, p. 5 -61.)
8.0 Findings Regarding Cumulative Environmental Impacts
Pursuant to section 15130(a) of the State CEQA Guidelines, cumulative impacts of a project shall be
discussed when they are `cumulatively considerable," as defined in section 15065(a)(3) of the State
CEQA Guidelines. Cumulatively considerable "means that the incremental effects of an individual
project are significant when viewed in connection with the effects of past projects, the effects of other
current projects, and the effects of probable future projects." (State CEQA Guidelines, § 15065(a)(3).)
The EIR assessed cumulative impacts for each applicable environmental resource area, within the section
of the EIR dedicated to that environmental issue. No cumulatively considerable impacts were identified.
A. CUMULATIVE AESTHETICS IMPACTS
Construction of currently approved and pending projects in the vicinity of the project site would
contribute to aesthetics impacts, however the City of Santa Ana is already largely developed. Because the
project would be comparable to surrounding, existing, developed areas in terms of scale, character and
use, cumulative aesthetics impacts of the project are less than significant. (EIR, p. 5 -5.)
B. CUMULATIVE AIR QUALITY IMPACTS
The Southern California Association of Governments is responsible for preparing housing construction
needs goals for each city. The proposed project is consistent with and helps the City obtain its assigned
housing goals. Because regional air quality plans consider these housing goals, it can be assumed that
emissions from this project were considered in concert with other cumulative projects. In addition, the
34 "Exhibit A"
Sexltnger Farmhouse and Orchard
Residential Development Project CEQA Findings
relatively small size and scope of the project (22 new single family residences and one preserved in place
residence) further support the conclusion that cumulative air quality impacts are less than significant.
(EIR, p. 5 -12.)
C. CUMULATIVE BIOLOGICAL IMPACTS
The City of Santa Ana is built -up, developed, and urban and therefore cumulative development in the
vicinity of the project, like the project, has little potential to result in significant biological impacts. In
addition, planned projects in the vicinity are mitigated on a project -by- project basis and in accordance
with applicable local, state, and federal regulations relating to sensitive species and wildlife. Therefore,
cumulative biological impacts are less than significant. (EIR, p. 5 -19.)
D. CUMULATIVE CULTURAL IMPACTS
The project as now proposed retains the historic structures located on the project site, as well as a number
of existing orange grove trees. As a result, the property would retain many of its major cultural and
historic elements. (January 2014 EIR Attachment, pp. 4 -7.) Impacts to archeological and paleontological
resources would be minimized due to each projects' requirement to meet local, state, and federal
regulations concerning preservation, salvage, and handling of resources. (EIR, p. 5 -41.) As a result,
cumulative impacts to cultural resources are less than significant. (EIR, p. 5 -41.)
E. CUMULATIVE GEOLOGY AND SOILS IMPACTS
The project will meet all building code requirements, as will other cumulative projects in the area. This
will reduce the potential for cumulative impacts due to seismic events. Therefore, cumulative impacts
related to geology and soils are less than significant. (EIR, p. 5 -45.)
F. CUMULATIVE GREENHOUSE GAS EMISSIONS IMPACTS
Greenhouse gas impacts and their attendant climate change effects are inherently cumulative in nature.
Greenhouse gas emissions of the proposed project are below SCAQMD's threshold, even when the lost
carbon sequestration of the existing orange trees is taken into account. (January 2014 E1R Attachment,
pp. 9 -10, Table 1.)
G. CUMULATIVE HAZARDS AND HAZARDOUS MATERIALS IMPACTS
The project will meet all local, state, and federal regulations pertaining to the transport, use, storage, and
disposal of hazardous materials, as will all cumulative projects in the vicinity. No cumulative impacts are
anticipated to occur regarding hazards and hazardous materials. (EIR, p. 5 -52.)
H. CUMULATIVE HYDROLOGY AND WATER QUALITY IMPACTS
No long -term operational hydrology and water quality impacts are anticipated as part of this project. No
cumulative impacts are anticipated to occur as well, Therefore, cumulative impacts are considered less
than significant, (EIR, p. 54.)
I. CUMULATIVE LAND USE AND PLANNING IMPACTS
35 "Exhibit A"
SexlingerFarmhouse and Orchard
Residential Development Project CEQA Findings
The project, in conjunction with cumulative development in the vicinity, will not increase urbanization as
the City is already built -out, developed, and urban in nature. Land use compatibility impacts are a
function of the relationship between a project and the immediate environment, Here, the parcels adjacent
to the project are existing residential uses and will be similar in character, scope and use as those
developed on the project site, Cumulative impacts are less than significant. (EIR, p. 5 -56.)
J. CUMULATIVE NOISE IMPACTS
Short-term construction noise will be localized and temporary. Noise at the project site as well as at
cumulative project sites in the vicinity must adhere to the City's construction noise ordinance which
prohibits construction noise in the evenings on weekdays and all day on Sundays and federal holidays,
Therefore construction - related impacts are less than significant. (EIR, p. 5 -59.)
Long -term noise impacts of the project will be generated by traffic along existing streets. Such ambient
noise will not exceed the City's noise level standard of 65 dBA CNEL or the interior noise standard of 45
dBA CNEL. Therefore, cumulative operational impacts are less than significant. (FIR, p. 5 -60.)
K. CUMULATIVE POPULATION AND HOUSING IMPACTS
Implementation of the project and other planned projects in the area would result in the increase of
population within the City. However, it can be reasonably assumed that population growth has been
taken into account in the City of Santa Ana General Plan Housing Element. Further, the project would
support the City's share of the regional housing need. Therefore, cumulative impacts are less than
significant. (EIR, pp. 5 -61, 62.)
L. CUMULATIVE PUBLIC SERVICES IMPACTS
The project, in conjunction with other planned projects, would result in the increase of population within
the City and an attendant increase in demand on public services. However, each project would be
required to comply with regulations including development impact fees and fair share contribution fees to
mitigate cumulative impacts. As such, impacts are less than significant. (EIR, p, 5 -63.)
M. CUMULATIVE RECREATION IMPACTS
Implementation of the proposed project would result in an increased demand for recreation services and
facilities, specifically at Portola Park. However, each project would be required to comply with
regulations including development impact fees and fair share fees, on a project -by- project basis. As a
result, cumulative impacts are less than significant. (EIR, p. 5 -64.)
N. CUMULATIVE TRANSPORTATION AND TRAFFIC IMPACTS
The proposed project will contribute to a cumulative (future scenario) traffic impact at the intersection of
Santa Clara Avenue and Wright Street. However, mitigation measure TRF -2 will ensure that the project
provides funding for its share of mitigating this cumulative impact with a traffic signal. Therefore,
cumulative impacts are less than significant. (EIR, p. 5 -98.)
O. CUMULATIVE UTILITIES AND SERVICE SYSTEMS IMPACTS
36 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
The proposed project's demand for wastewater treatment,
within the capacity of the entities providing these services.
significant. (EIR, p. 5 -100.)
9.0 Findings Regarding Alternatives
A. BACKGROUND
CEQA Findings
water service, and solid waste disposal are all
As a result, cumulative impacts are less than
An EIR prepared pursuant to CEQA and section 15126.6 of the State CEQA Guidelines must describe
and comparatively evaluate a range of project alternatives. Analysis of every possible alternative or
options or combination of options would overburden the EIR with an unnecessary amount of detail that
would be redundant and would, as a result, fail to provide meaningful information for the City to consider
in its review of the project.
The range of alternatives required is governed by a "rule of reason" that requires the EIR to set forth only
those alternatives necessary to permit a reasoned choice. The EIR shall include sufficient information
about each alternative to allow meaningful evaluation, analysis, and comparison with the proposed
Project. Alternatives are limited to ones that would avoid or substantially lessen any of the significant
effects of the Project. Of those alternatives, the EIR need examine in detail only the ones that the lead
agency determines could feasibly attain most of the basic objectives of the Proj cot.
However, when significant impacts can be mitigated by the adoption of mitigation measures, the lead
agency has no obligation to consider the feasibility of alternatives with respect to that impact in its
findings, even if the alternative would mitigate the impact to a greater degree than the proposed Project,
(Pub. Resources Code, § 21002; Kings County Farm Bureau v. City of Hanford (1990) 221 Cal.App.3d
692, 730 -731; Laurel Heights Improvement Association v. Regents of the University of California (19$$)
47 Cal.3d 376, 400 -403; Laurel Hills Homeowners Association v. City Council (1978) 83 Cal.App.3d
515, 521.)
Here, the project, as now proposed and as adopted by the City, has no significant impacts, as all potential
significant impacts can be mitigated by the adoption of mitigation measures. Regardless, the following
findings provide evidence supporting the rejection of other project alternatives, and the project as it was
originally proposed by the, project applicant.
B. PROJECT OBJECTIVES
Each alternative considered by the City was compared against the project's objectives. The objectives of
the proposed project are:
• Provide for the current and future "move -up" housing needs for the City of Santa Ana.
• Provide land uses that are consistent with the existing General Plan Land Use designation and
Zoning designation of LR -7 and R -1, respectively.
• Provide land uses that are similar to surrounding uses in character and visually cohesive with the
area.
37 "Exhibit A"
Sextinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Prevent further dilapidation of the site, discourage vandalism, break -ins, and unauthorized use of
the site.
C. REJECTION OF ALTERNATIVES
In determining an appropriate range of alternatives to be evaluated in the EIR, a number of possible
alternatives were considered and rejected. Alternatives were rejected because either they could not
accomplish most of the basic objectives of the Project, would not have resulted in a reduction of
potentially significant impacts, or were considered infeasible, The specific findings relating to the
rejection of the considered alternatives are provided below.
1. No Build (No Project) Alternative
Description: With no development, the site would continue to have impacts currently experienced
on the site including vector infestation, vandalism, and safety issues including break -ins and fires
from unauthorized uses. However, the project site would continue to have a General Plan Land
Use Designation of Low Density Residential (LR -7) and zoning designation of Single Family
Residential (R -1). The site would potentially be developed in accordance with the City's current
land use and zoning on the property at some point in the future. (EIR, p. 7 -1.)
Impacts: The No Build (No Project) Alternative would not result in any of the less than
significant environmental impacts associated with the construction of the proposed project.
Maintaining the project in its existing condition would avoid the less than significant aesthetics
impacts, short -term construction air - quality and noise impacts, long -term future traffic impacts,
and any impacts to presently unknown archaeological and paleontological artifacts onsite of the
project as currently proposed. (EIR, p. 7 -1.)
Objectives: The No Build (No Project) Alternative would fail to meet any of the four project
objectives. It would fail to meet any existing or future housing need in the City. It would fail to
provide new land uses that are consistent with the existing General Plan and Zoning designations
of low density residential. It would not provide land uses similar to surrounding uses, and the site
may continue to experience vector infestation, vandalism, break -ins, and fires from unauthorized
users. (EIR, p. 7 -1.)
Finding_ The City Council hereby rejects the No Build (No Project) Alternative on the basis it
fails to meet any of the four Project objectives. (EIR, p, 7-1.)
2. Original Project (Prior to Additional Analysis)
Description: The original proposed project consisted of the development and construction of 24
new single - family residences on approximately five acres and demolition of the historic
farmhouse and orchard. The original project would also have widened and improved the southern
portion of East Santa Clara Avenue within the project frontage and provide a connection from
Lyon Street south of the project site, north to East Santa Clara Avenue. The applicant has since
changed the project from this proposed 24 -unit residential project to the currently proposed 23-
unit (including one preserved in place unit) "Historic Preservation Alternative" prior to the final
Planning Commission and City Council meetings.
38 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
Impacts: The project as originally proposed resulted in the significant and unavoidable impacts to
cultural and historic resources. The project proposed to demolish the existing residential
structures on the project site, and all of the existing orange grove trees. After all feasible
mitigation measures were implemented, these impacts would have remained significant and
unavoidable. Separate from the cultural resources impacts, the original project would have had
similar, or slightly greater, impacts associated with all other resource areas. This is because the
project originally proposed the construction of 24 new single family residences. The current
project proposes construction of only 22 now single family residences. As a result, the project as
originally proposed would have had slightly greater traffic impacts, slightly more impervious
surface area and therefore slightly greater hydrology and water quality impacts, and slightly
greater short -term construction noise and air quality impacts. In addition, as all of the orange
grove trees would have been removed, the project as originally proposed would have had slightly
higher greenhouse gas emissions impacts, as there would be a greater reduction in carbon
sequestration. The project as originally proposed would have also had slightly greater aesthetic
impacts, as it would have removed the existing structures and all of the orange grove trees. In
contrast, the project as currently proposed will keep more of the original features of the site in
place.
Objectives: The project as originally proposed met all of the four project objectives, as it would
have provided new "move -up" housing, provided new land uses consistent with the General Plan
and Zoning Code designations, provided uses that were compatible with surrounding uses, and
would have reduced further dilapidation of the project site.
Finding: The City Council hereby rejects the Original Project on the basis that (1) it has
significant and unavoidable cultural resources impacts, even with all feasible mitigation measures
incorporated, while the project as currently proposed has none; and (2) it would have slightly
increased the magnitude of the project's less than significant impacts.
3. Alternate Location of Project
Description: New housing projects on other location(s) within the City, including: Alternative
Site Location 1 (17th Street and Tustin Avenue); Location 2 (Fourth Street and Cabrillo Park
Drive); Location 3 (First Street and Cabrillo Park Drive); and Location 4 (City Place at Memory
Land and Lawson Way). (EIR, p. 7 -2.)
Impacts: Unknown.
Obiectives: None of the alternative locations would meet three of the four project objectives.
Location 1 is within the County of Orange and therefore would not provide move -up housing
within the City of Santa Ana, None of the four alternative locations are zoned for LR -7 and R -1.
While each parcel may be developed with uses that are compatible with surrounding uses,
alternative locations would not meet the objective of preventing further dilapidation of the project
site. (EIR, p. 7 -3)
39 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development project
GEQA Findings
Findings: The City Council hereby rejects the Alternate Location alterative on the basis that (1)
none of the locations are feasible for a single family residential development of more than one
unit; and (2) this Alternative fails to meet three of the four project objectives.
4. Park Expansion Alternative
Description: This alternative would remove all existing uses on the site and replace them with
public uses consistent with the expansion of Portola Park. This alternative would require the
rezoning of the project site to Open Space (0) designation. (EIR, p. 7 -3.)
Impacts: This alternative would result in significant and unavoidable impacts to cultural
resources, associated with the demolition and removal of the existing residential structures,
However, this alternative would reduce long term operational impacts related to traffic,
greenhouse gas emissions, noise, and hydrology and water quality impacts associated with
impervious surfaces, (EIR, pp. 7 -3 through 7 -6) Remaining impacts would be similar to those of
the proposed project,
Obiectives: This alternative would not provide for the current and future "move -up" housing
needs in the City, or provide land uses that are consistent with the LR -7 and R -1 land use
designations. However, this alternative would meet the project objectives related to providing
land uses that are visually cohesive and that would prevent further dilapidation of the project site.
Findine: The City Council hereby rejects this alternative on grounds that: (1) it would result in
significant and unavoidable cultural resources impacts; and (2) it would meet only two of the
project's four objectives.
5. Urban Garden Alternative
Description: This alternative would develop the project site with an urban garden, museum, and
education facility with an orange grove on five acres of the project site.
Impacts: This alternative has the potential to result in increased impacts related to land use and
planning, as a museum and education facility use would be inconsistent with the project site's
current residential zoning designation. (EIR, p. 7 -8.) This alternative may also result in the
potential for increased operational noise impacts, related to visitors using the project's facilities,
which would be located next to residential uses. Similarly, traffic and parking impacts may be
increased, due to the need to provide visitor parking at the site, and visitor traffic, (EIR, pp. 7 -8,
9.) Depending on the scope of renovations made to the historic structures on the project site,
there could be increased impacts to cultural resources, (EIR, p. 7 -7.)
Obiectives: This alternative would not meet the objectives of the project to provide move -up
housing in the City, or land uses that are consistent with the existing residential zoning. In
addition, a museum and educational facility is not compatible with adjacent residential uses.
However, the alternative would be the fourth project objective, of preventing further dilapidation
of the project site. (EIR, p. 7 -9, 7 -10.)
40 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residentlel Development Project
CEQA Findings
Finding: The City Council hereby rejects this alternative on grounds that (t) it meets only one of
the project's four objectives, and (2) it may result in increased impacts relating to noise, land use
compatibility, and traffic and parking.
6. Alternative Project Design /Cul De Sac Alternative
Description: This alternative proposes development of approximately 23 single family residences
and eliminates the through - connection of the project with the south leg of Lyon Street.
Impacts: This alternative would result in significant and unavoidable impacts to cultural
resources, due to the demolition of the residential structures on the property. This alternative may
also result in increased impacts relating to transportation and traffic. With implementation of a
cul de sac, access will be limited for emergency vehicles including police and fire services
through the prej ect site. Further, the alternative would not satisfy the City's turning radius for cul
de sac roads, which may result in impacts related to a hazardous design feature. (EIR, p. 7 -12,)
This alternative may also result in land use and planning impacts, given that currently, Lyon
Street is a dead end road with a stub -out for a planning future connection. Lyon Street was
planned to be a connection by the City of Santa Ana.
Objectives: This project would meet each of the four project objectives, given that it would
provide "move -up" housing within the City, develop the project site with residential uses
consistent with the zoning and land use designations, would develop the site with uses compatible
with the surrounding area, and would prevent further dilapidation of the project site.
Finding: The City Council hereby rejects this alternative on grounds that (1) it results in
significant and unavoidable impacts to cultural resources, and (2) increases impacts relating to
traffic and land use planning.
7. Lower Density Alternative
Description: This alternative would develop the project site with fewer than 24 single - family
residences, and result in larger lot subdivisions and larger estate type houses.
Impacts: This alternative would result in significant and unavoidable impacts to cultural
resources due to the demolition of the existing historic structures. However, this alternative may
reduce other less than significant impacts, due to the fact that fewer units will be constructed.
However, the project as currently proposed includes only 22 new single - family residences. To
reduce the less than significant impacts of the project as currently proposed, this alternative
would need to develop fewer than 22 new residences.
Objectives: This alternative would meet project objectives for providing "move -up" housing
within the City, and for developing the site with residential uses consistent with the current land
uses designation. This alternative would also meet the project objective of preventing further
dilapidation onsite. However, this alternative would only partially meet the objective of
developing the site with uses that are compatible with the surrounding uses. This alternative
would not be compatible with existing surrounding uses of non - estate typo housing. (BIR, pp. 7-
13 through 7 -15.)
41 "Exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
OEQA Findings
Finding: The City Council rejects this alternative on grounds that it would result in significant
and unavoidable impacts to cultural resources,
8. Hybrid Development Alternative
Description: This alternative involves the relocation of the existing residential structure and
outbuilding to the northeast corner of the property. The existing orange trees, approximately 20
to 30 trees, in the northeast portion of the property would be kept as an orchard area. Twenty -one
single family residences would be developed on the remaining areas of the property. As the site
is a locally listed historical site, modifications, changes to the orientation, improvements or
structural changes to the existing residential structure, and outbuilding would potentially result in
significant and unavoidable impacts to the historic resource.
Impacts: This alternative would have greater impacts to cultural resources than the project as
currently proposed due to the fact that it would move the historic structures from their existing
location, and place them elsewhere on the project site.
Objectives: This alternative would meet all of the four project objectives.
Finding: The City Council rejects this alternative because it would result is slightly increased
impacts to cultural resources.
10.0 Environmentally Superior Alternative
The project as currently proposed is the environmentally superior alternative. It would not result in
significant impacts after mitigation, would meet each of the project's four objectives, and is consistent
with the City's General Plan and Zoning Code. Based on the reasons above, the project as currently
proposed (referred to as the Historic Preservation Alternative in the administrative record for this action)
is considered the Environmentally Superior Alternative.
11.0 Record of Proceedings
Various documents and other materials constitute the record of proceedings on which the City of Santa
Ana bases it Findings and decision contained herein. All documents related to this project are located at
the City of Santa Ana, Planning and Building Department, 20 Civic Center Plaza, Santa Ana, California,
92702.
12.0 Summary
Based on the foregoing Findings and information contained in the record, the City of Santa Ana
has made the following findings pursuant to Section 15091 of the CEQA Statutes with respect to
the significant adverse impact of the proposed project, as identified in the FEIR:
Mitigation measures have been incorporated into the project which avoid or substantially
lessen the significant environmental effects as identified in the EIR.
2. Based on the Findings stated herein and information contained in the record, it is hereby
determined that:
42 "exhibit A"
Sexlinger Farmhouse and Orchard
Residential Development Project
CEQA Findings
e All significant adverse impacts on the environment due to the approval of the project
have been eliminated or substantially lessened to an impact that is less than significant.
13.0 Approvals
The City of Santa Ana hereby takes the following actions;
1. The City has certified the Final EIR for the project, as described in Section 1.0 above.
2. The City hereby adopts, incorporates into the project and makes a condition of the project
approval, all mitigation measures in the Final EIR, and as discussed in the Findings section
(Section 2.0).
3. The City hereby adopts the Mitigation Monitoring Program, accompanying the Final EIR and
discussed in the Findings section.
4. The City hereby adopts the Findings in their entirety, as set forth above.
5. Having certified the Final FIR, independently reviewed and analyzed the Final EIR, incorporated
mitigations into the project as conditions of project approval, and adopted the Findings, the City
hereby approves the Sexlinger Farmhouse and Orchard Residential Development Project, as
described in the Final EIR.
43 "Exhibit A"
" EXHIBIT B "
Sexlinger Farmhouse and Orchard
Mitigation Monitoring Program Matrix
City of Santa Ana
20 Civic Center Plaza
Santa Ana, CA 92701
January 2013
O
v
O
E
0
c
a
E
0
ti
a
w
J
m
Y
v
u
m
a�
C
R
w c
c c
a 'c
E
o
L o
LW c
0
ro
0
d yL
a v
4 �
�+ a
O
_O
a ,
cm z
Q Cb
Ea
w �
5
,
QY
ao
6
a
ro'
Q
co
4 L
C
>
7
O
CL
Q
O
CL
a E
v
u 'R
Z^
C,
L
C
W
V
CL
Rm
nu
, e
m
m
m
w
C
c
�a
N
CL
a
o
o
>
V)
a
n
o .
4
O
4
O
Q
O
o
=
o
o
c
v
o a
a
L
o
R
O
v
O = i _
00
a
N
2 v
L
O.
O'
r
v
a2 m
v v a
"a a 'v
R
c R
o^
`o m
u
a
u di
a
u
w
°c
v
a
Q
d
a
a m
m
'c .
a
L o.�
o cp
E
c
o
a
R
sa @
E°
o
H
L a
T a a
m
e
'N
o
a m
_.
w
=
'—O
C
a
R
G R
a >
_ U
C
O
N
a
°
m
c'`'
v
c
a v 7
2 0
—°
o c
c°
ro o
R
0 0
a-0
9911
'3
R m
R
Y
O in
L=
a v
a
R
> w
O ja
9j
a
+ cu m R
a
'C N
L
O
C
,E==
U
0�
a
bD
m M
°a
c o=
5 c
Y°
°°
a E m
A
c m
R
A
E
c
aq
m
a a
o
t^
= m
a
c E
c
r-
c
rC
a
u
c.
°—
a L
>^
L°
Y E
m
�°
v
R o
3_
.5
a
E
Lo
R
C
a
v°
•N D.
o
d U
c on
'R C
L
Y
c ro
N
p
q''
v
m
L
O
N
O
C
C y
p,
A `-' Q
'a0
d 'O
b
R a
V C 'O
bA
m
7
'O
Q
U=
w.
.�
V
y._.
O �
vRi
O m
O' .� Tn
R UCO
a
+�
-O '�
y
R O ya
C
a ;O
'U
to
C
C
a
aui
LJ
t> 7
O
c
O
L
ro
7 a
T
n E a
*0
3
m
v
E E
to
L
m
nq
ya
a
a
N
C
C
C
E T
a 0
m
C
N •Q
L C
C
Y 0.
O
'O
p
.aC
Y"
!d
C d
Q
Y
bE.p
N
O
N- R
--
'�"^ "6 (d
U.
a
M
O
a
Q CD
fS R
a
Y .0
•R
O
L
'Y
4A
�+ a E
'Y
.0
n-+
7O
a
c
a
�'
.0
O
Q
•+-'
m
O
Q
s
'"'
d O a
aY-^ 'R' tl;
c c a
R
O
tz
N N
>
C
O,
c c
O
U
N a
m
o`t"paciLAmu
°s
-0 .m�°ESvs�CL
ii8ExcaLn
aj
O
0
aR
z
t
a
E
a
c
v
C
O
W
J
C
ti
Qc d
O
4
a v
Z -°
Eq
L o
lz C
�b
Qj
n a
ro
a
CL
CL
a�
o.
ro
0
C
b
ti
?
91 a+
co
a
ro q
O
O
s.
a
¢
c
O
R
"^ 6
a
m
o
c
ar
'
t. 2''
Q
m
m
W
w
17
v
a
fj
G
c
6
G
¢
O
d
O
a
i
m',5
ro
m
m
'�
ro
Q
pL
i
�C
Q
O.
Q
a
o
a
o
¢
o
m
o
�j p
c
m
p
Q
w
m
v
m
m
CU
cC
m
u
ao
C
p
d
O
A
v
d
v
CL
o
c
°'
a
c
G c
c
o�'"
(U
r v
v'
n
o.
>
w
o
O H
a "C-'
'm
't
L
E
A
.j
N
N?
{avA
o
M
Q
0
m
o
w w a
c c
a
u
3
m
L u
v
E
b4
u
a
v
Y
m
Q
a
�°
a
Q
a
°-
y o :v
'ro at
v
'c0
o o_
u
�`
0
c
m��
o
bp o
IL
a
v?
E
�+
m
e
v EE
Y
a
v
0 0
c
E
s
o
ro
p
0.
.a
—
IY/1
'c
is
°-
p
L ai L
O
a�
E 0
m N
m
L
p
Q.
r
- U
c
c a
ro
O
m
u
'C
c
H
O
3
'6
7
G
u
bA
a ..c
p. «. 'O
'O 'p
C "p
u
'6
u
m L
w e
w p
c
N
+�
'p
'�
fQ
E
*••
p
'�j
7
'C
p.
d
c aJ
al
7
N
p
ba
3
m
1
C
°B
N
(�/9
7-e—p
al w
by E
p+
c
c 7
u>
i
.�C
._
=
._
m
r
m
v
m s.
.5 -
o
vw
E
c
N ro
po.
°
�
d
a
s
muQ.
c
p
a
o
m
3
3
0
m v
n
v m
¢
>
v
o
a
Q
o
(
L
to
a
=«
m
o
o
w u a.
CL ro
3
awi
r-
bca a
jLn o°
U
c
c
c
a
f7 u
p t
Q+
-0
m
•in
p°
m
c
m
a
°
m CL
Q
w
c u a
mL v.5
o
c
.mc
o
m v,
o
g
m
3
v°
Z
w
-L
'�
o_
°- u
'
'�
°'
m
w
v
aci
E
v
s
p
Q
.+m_•'
IA
p
y@
3'
aci
'p 'd
o y
L ._
m
L
U
m
Q� •Ci
.c
•F� ay,,
o
cco
o'
a)
B
Awr.wc_
d
y
4-
p
y�
F-
d
Q
r m
>
_m
Ow
c
.0
o
.0
c
w
o
L"
o v?
v
E
w
J
n
s v
d a
O N
LI) CL
o °
s v
b
O N
C -p
�r
ti
5
N
h
O
U
�
s
CL
4
m.
0
c
o
la
'H
N>
m
m
m
m
m
a
o
c
iu
i.0
>
a
>
>
C>
-'O
O
O
O
O
O
a
�
m
a
o
c
o
a
o
a
o
a
o
c-.z
m
•� t
W
N
3
�
o
CL
y
h
¢
O
m
u
G
m
c
u
ro
¢a
h
a
ar
o
o
w
c
a
c
c
a)
+�
a
a
—
c
c
y
c by
�—
ro ro
y-
a
p
m
>
c°
E
ro
N
3
°
o
a3
v °
o a a
rL
'a 'u
a°
a a)
a
d
S
o
H
y
'i.)
o
>
a V `C7
d C
y
C
a°
Yn
a) —
^
C
LI
-'
M
y
C
a)
N
Y
()
a)
.O
bA C-
ro a
E
C
y m
O
.*_'
C Y
o
m
u
V
d
ro
y
=
N
'.0
vONf
pU
U
O
O N
N
'
E
c
Z,
bO .0
m
N
`p
O
•�
a
W
v
4x1
o
w
-°
p
L c y
o u
E
a)
a) a
'a
E
v
y
.o
CL
.
Q
d
O
a)
— L B
Y �••)
L
-0•+
4= _
V
L
N fYG
a/
C
CL
C
O
N
d
Vt
d
a
�u
p-=
C a/
ro
N
Y
w
N
Croy
_
4_
v
,N
y
c -p
m-
a)
L
ro"
a
L_
ro
` L L
L
—
p
N
$
r)
O C
3
Y
cu
a>
fYa
a
E
d
E
ro
E
ro
al
L
,ro
N a ba
�`'
O. p
f
ro
N
QJ
E
C .O
N
0
O
'�-
C
Y
�a
)n
L
U-
a)
Y
y .y
N,
y C
al m
i=
'�'
m
ro-
.O
N
ro
L
a
a C
d
ro
p
uo
ra
ao
p
C
L
a
y
a)
a
'G_
a
G
a
u
s
p.
na
c
E
v ro
o
a v
bcn
u
''C
u
•x
.v
—n°'.
y
u
•'�
v
i�
a
lu
'�
>
m
CL
y
m
y
,c
.p
0 v
=
aroi -
wa
u
U
c �.
a
a
a
y
o
ro
v
u'�
v
v
c
ro
m
c
v=
v
E
a,%L
w a u
ro'o
v
m
c
a
c
M
v
>
w
a
•�
u
ry"
C
Y C
L
v
0-
a) U
E
y
N
S
u
"
'c
c
a
c
a
ro c
a
a
m
ro E
a
a
y
a
a
T
a
0
a)
c
o
bd
c_
o
w
o
v
E°
8 ro
c ro
E N
�'
a
6
o
a
o
v
m
a
e
v
v
30
a
ro
a
a
o
wz
>.ucoX
odc
LV
ow
o
o
o'cav0c
Cr
row
scot
.0
i?
.m
d
CL
3;
,,,
a"
b
o
a b
m
3
a
v
..
t
W`
a
a
u
c
a
c
C c C
N
"OOL
O
'E
C
'o
p
'�
c
c
O
p
U
.�
p F
'G
O
C
.� O
lU.l
0
O
O
Y
aL-•
O
N
L
V
�d
0 Ga
ns
O
U
d
a)
y C
E
0
is
I-
a)
C
h
=
h 41
-p
bD
C
�'i
d
C
C
0 E
`
ai
C
•�
-O
a`-•
N C
y
y
O
N
N
y`•
Y
Y
IJl
d
a
C
l/) = a)
a) L'
'6
CC
O
y
a) 7`
d
CC
C ro
aG
a) O
ae
C
E
c
d
E
m
¢° �r
o
coi
a
`o.'o
m -o
M.
m¢
E v
¢
°u
.E
uu
�r
ti
5
N
h
O
U
°
v
0
c
a
c
0
a
w
J
z w
QjO
a
a �
5 O'
O
,c a
E o
`a
� m
C rysj
rn �
w
m
6
>a
cu
a
aa�
d
w-
0
m
ro
c.
c
o
m
'N
ti
"a
m
m
;�
>
i
3
a.m
O
d
C
O
w- d
O
.
C
O
O_ a
'{p �N
'G
a
c3
C
ea
N
W
`$
U
X
F
a
ary�
17
a
m
W
E
m
m
m
m
m
M
a
6
>
>
>
y
>
si
n
Q
a
a
O
Q
O
Q
O
O
Q
4
O
a
r
o
o
a
°1
E
cz
Y
v
a
a
s
c
a
I-
au r
a s
=°
u
>
CL
�N
E o
c
vm
a
v
E
o
o
a
a c
�
a
- a
m
.19
a
Y
m a y
CA
N,
> N
'^
m
N
a
am
m
m
3
0"
0
ow
'u
°
bA
p
a
O
O¢
7
a
C
a
a
L
a
�.
E
O
m
a
u,
O.
o
0
a
E w
>
a
o
a m
o
4
,
o
a
a
a
a
ro
�
I
bA
C-0
D o
a
a
a m
� an
L
a
o u
•L
a
m M O
O. '0
a
�
O
a
C a
a_+
a
�°
C
N
L
�
�
O
3
bb
+.C+
Y
.O
O
o
0
u
u
r
c Lu
-0
�
E
� -'�'
a
s
0
M
o a
0
4
+`• ao
q
v s
a
a m=_
bn
X
`a
2 m
.£
—°
w
n
`o
a
W
s c
.�
w
:C 'o
u a
m
m
c
m
,"=
in
a
Y
m O
agi
w
+� •'t,
=
4=
> r
c
LL a
2
r Q
E
E°
c a`°
o
m
-mo
a O>
v
t
ro y
ai
bn -
t
u_
v
a
o
.c .�
Y U
CJ
v
Y
w ro
a
c
°
E
a
a
q
u a
°
.c
c
o
"
a h
E
-° o
u
o °
o "°
a
m
cu 0>
a
X
c
O
,c
c°
Y
—°
c 7
C
c
�i
m
CL
bD
0
= E
a
'°
c
m
a
m U
L�"
c
}�
O
c
a
u .*_'
G
a
OD
M
Eov
CL
a
�Yroom.�Lao
v
E °°c'�'�?
c
ro'C
m
a
c
a
m
_^
O
m o
ro c
O
°u obu
o
•. m
Q
"O
C
a
v
E
„�
v
v
a
E
c
.0
°
by
a
c
w m
L 0
a
•.
0 .O
O C
N
m
Y bA
C
a
s
yr
by m
b0
C
Y
u
Y
C
m
LO
a Y
a
u
4j
L o
{"' a
w
.- N>
v
v A
v
E
-o
v E
o
f
'o
va
o v
o
y
n
ro
� U
a
y
a-0
o
+�
d
v
•ro
°>
° m
rcb
O
r
a c
O
E
m
'C
O m C
to
O
u
'+�
a
m
ii v
i
Q
,r
p°
c> o
G
a)
E ro
m
a
E
E@
s
E
o
a
a
m 'Y^
w
a.=
v
v
0
m
u
e
bA _
~
.o 6
C
ti
c u
a
cJ
a a
>
a
cu
aY
c
o
a
cJ
s°i
m
.E
Xc
•c oVN
O
m °o
.Y
�=
a _�
..
Y
�-
C
c t
'>
"°
o
a
v
u
O o
E
Q
a
c
w°
c
:
m
E
m m>
m
E cu
u
c
c
O
m:
°W
m
E
0
v a
m
d°
u
o$
o °u
u
v
w
w
m
6
C
N
C
O
W
Q
a
S N
O
a
a v
o
-C a
Q
'
k; a a"
a7 v
� v
h �
w
P
C
Itz
w
m
h
0
U
L
as
O
1
Q.
0
La
ry
C
C
O
M.
N w'p
m
C
p �
Co
1..! CL.
C O
C
O y
'C
r�ppF
"yo m
tlJ
M
W
7C
A
L
h
a
u
CL
mi
m
, c
m
m
wT
m
r-
=
m
v
v
o
o
v
Q
o
N
O
Q
Q
O
Q
O
Q
i
—
'6
a
y 10
q
0=
Y_n
ma
}I
(ca
Q: Vr
bq C
q
Y
W
Y
.yr
q
L
a
N 10
t
}a L=
u
m
q
j
a
N
O
m 'f0
((pp
U
Y
m
.N
Vf
T
-o
N
fVG
r
_
c
w o
C a
w> o
c
S2
C
q
0
c
m
L E
.�
v
'pp
°
u
'°
Op
0 -a
°- uu �
m
v
'0-v0
a
o
X'
O �
'�
o
f
u=
g
m
L a
u a
a a
v_
o
"'
m ac
a
a
'�
t
t a
d
s
O-
a
�
T
a
f0
'f_ o
�_ T
m
m
jy
L 'a6
M
_m
`al
ti
L
'O
t
aJ
E
+V+I
lJ E
a O'
3'S d a
E
a
ut
C
V
c
C
a
m
'O
a
LO
`
L
:C
aw
N
' w
c
C W
vYi
m
CO
c
a
T
._
d
O
N
L'
O. O'
O O
T
E
.N
a .�
a
d
0O
C_
Z
in
a
4=
Z
V
a
m
c
L
�L
M
m
O
v
7
E
a
a u
'C [2
4
+'C+
y
O.
N L
r
a-
_O
o
c a
Y=
�_
.�
m
a)
a
Y
ro o
d
c`
o o
o
m
c
a
d;
c
O
v
g w
'O
'�
C
C
.�
N C
`- in
a
c
N
to
O
H
O
O
'.L''
LN.
R,
q
E
m
a
u
m
aa)
c—
o
m
a
4"'
�+
O.
'O N"
.0
C
N
C
•i
ro
O
vLO,
a
e
O
it
v
.�
;•=
v o
o=
o
o
u
Q
aa_0
y
a N c
a
°Y'
w a
as
'3
E
ono
0
"" -
M °c
o
m
i°
N
�
°
''�
c>
D
o
v
o
a
r
u°
t''
to
u
:o
e
E
•19
V
O. a
L
m
O
0
a
i
Q
O
W�
a
-O '0
O' . r a>
0a
ti
Y
o
Z, pA
c-.
O
C
E
c
v
o
c
r
c
W
w
o.
q m"
a
a
c
T �'
N
ro
L
m
r
Y
m
a`)
tw w
E
m
m
g
m
m
's "w
a
a c
v
E
a"
!° q"
m
u=
O
m
Q)
a)
c
a
E
a
u
v
m +a
u°
O.
M -o a
m
o
E
b
`ma na
i7
s
ao
E
to
v
m a
E c]
E
E
t
v
a
ca,
m
r
m
a
m
a
.. q
a n
a
t L°
�
$ cu
.c
:y
C
m
E
U O
u t
o
C
a
a
a
a G
Y
V
O
d
CL
T
y
w
L 'O
C
O pp
y
!9
u
N-
L Y
a
>
E
o
'c
—
M
c
o
O�
o .mC
f
s
d
im-�
c O
a ea
up
O
O
'Y
N 'O
3
M
m
Z
r
m
m
Z
1
>
O
Q
a
c
a E
v
�i O.
~ m
I�
ma S!
Q
J
J
m
a
o
a
N E
o
c
s
o o
E
a
c
v
i
a
a v
�n c 'C
a'D
M
,4, a
s a
pn
Q
u
Y
N
u u
Q
m
.c
Y
u
a
Y
m
,�
Y
r-
L 'O
U 3
m m
L
a
u
m .a
o. '0
'N
d
w
P
C
Itz
w
m
h
0
U
z
k
"O
� N
0 0
n
o w
O �
� 5
� o
0
� v
c a
c
Q
'S
U
ICU
0.
ao
i
w
e
a,
m
c
^o
e
°.
m
a
_N
•�
CO
m
Vµ.
C
TL
t9
o
0
Es
a
a
r7 am
4
44
Q
a
4
o
no
c
.L
I
nq
g.
W
K
~'
w
a
u
m
m
m
m
co
F,
ro
v
d
v
+
Q
a
o
0
o
y
0
L
a
L
a
L
a
L
a
cm
d
d
O
¢
O
Q
O
w-p
dal Z7
'a
m
ro
ba
bC0
°
.0
G m
d
C
L
°
—°
a°
U
O
^
c.
N=
•E
u a
E
o
o
a
H
nor
m
o. c
O
m
aj
bD
m
O.
E
ro
u
N ai
Q
� vi
O
N
O.
u
p
Y
_v
'
?..
ro c
E
a1 —
y.
_O
m m
a
N
O.
Y
U
-
},
m m
c
m
E
,n_�+
o-
,v,
a
o
a°
3¢
m^
rD
E
co
p
cr
. v
a
N
v
a%
c
o.
L
m
v
ai
c��
cu�
m
t
v
o
o
m
u�
no
a
,s m
c
[p
m
,�
:p Y
t'=
0
` v
a
.O •�
o
'1p+
v
>. E
o
a
c.
o
d O
a,
(� L"
(��pa O
4-r
d
U
-E
p E
C U
c
Y
u
c w
m
O Q.
U
L
'G =
a
m
c)
m
c
U
£
C
O
t o
+%'
N
w
C m
•�
tn'
+L+
?
u
N
3
'C
y
CL
W
C'
L-'
ro
(J
a)
^" 4_
b
i7
'O
in
m
O
y-
a
m
^c
•vY""i
>
E
c
O
,CV
O
O
o.
o.
E
u,
u`
c
u
c
�; U
-a
v'�i
L
u a
u
c
o
m
c
y
s +a
u
B
co
°.
>
m ro
o
�a c
N
m
w c
_
aa)
Y
o
a
E
v$
�°
to
c
a
o
v
E v
w
o
o
'0
o
+,
ai
cu
t4
a)
4-
p a
F
"6
m
vi
p
O
al m
Y%
Y
cu
o
c
.a
*a
c
m .c
v E
O
u
aj
.o
a7
o
u
i
-p
.0
C
N '4''
m
C
o
m
w
Y
•?
a
E w
v
a
m
ou:
v
4
M
a
c
u
N
c
m
o
o
r-
a
v
o.0
o
C
u
c
+c-
`L°
o
v
m 'm
ar
E
aj
o
a^
m
Y
c
c
'w
Y
=
=
c
c
8 c
a
o
Y
y+
o
4
v
v v
c
a
E
o_
U
c
c
o
4
E
v
m
ca
C
E
v Y
u^
o.
m
o
L
r
p
a
t=
r
°
E
a
a
m m
m
t
m
o >'
-O
c µ
G
a
o
°
U=
3
m
m
m
E
ro
m
U
cf
a
y
s
Y
a
C
a
o 3
y
c�
�a ro
w
a
m±
s'
m
3
cur
c
>
m
o—
j
a
u
c
a
c
v€
r
Y
y
L
v
4
L m
o
L o¢
p d0
0
nor
=
m
W
Y
c
c
m
m
w
m
3 o c
'o
N
N U
�i
N
CL
Y
a
m
�' a
'o
c
ro
p
c
N
e(
0 e 0
C
o
N
L
G L
L
,O
M�+�v
O a
ro
L
p O
p
01
-p
U
N
,C
C
Cam'
m
�
2
6>
o O
O
i n
0
O Y
m_-'
E
m
m
:!:
,
o
o
�. m y
'
-r-
w
.N
s
'9
N�
d
•b
C
M
N
W �a =
Q
C
u
N O
O
O p
�
o
d
Q
u
0
v
m
.c
a=
s E
E
a 3
a
3�
m
,2
° lou
z
=o
Zo
uv
E$
na.
u
4 a m
a
c
Q
'S
U
\
\
[
\t
\/
mE
\\ cu
(5
ƒ/
\)
\
\
/
\�
.0
.
:
m
e {{
a
\k�
0 46
0
EEk
k§
� §\
20
�k
CL
CL
tao
/M
CL
.�
!
_00
)
.0
\/\
'\Z)
cu
)
)
(
°o
k
}0\
§
f\/
ow
.
\�
&wm
r_
/q
|�
f
/eƒ
/
}))
\
\
/
Conditions for Approval for Variance No. 2012 -04(a)
Should the Planning Commission approve Variance No. 2012- 04(a), the approval is
subject to compliance, to the reasonable satisfaction of the Planning Manager, with all
applicable sections of the Santa Ana Municipal Code, the California Administrative Code,
the California Building Standards Code and all other applicable regulations.
The applicant must comply in full with each and every condition listed below prior to
exercising the rights conferred by this variance.
The applicant must remain in compliance with all conditions listed below throughout the life
of the variance. Failure to comply with each and every condition may result in the
revocation of the variance.
A. Planning Division
All proposed improvements must conform to the Site Plan Review approval
of DP No. 2010 -47 and the staff report exhibits.
Any amendment to this variance must be submitted to the Planning Division
for review. At that time, staff will determine if administrative relief is available
or the variance must be amended.
3, Landscaping, once installed, shall be maintained per the approved
landscape plan. After project occupancy, landscaping is to be maintained to
include the minimum level of plant materials installed at the time of
occupancy and per the approved plan.
4. Vines are required to be added to all block walls that face a public street.
Exhibit "C"
Conditions for Approval for Variance No. 2012 -04(b)
Should the Planning Commission approve Variance No. 2012- 04(b), the approval is
subject to compliance, to the reasonable satisfaction of the Planning Manager, with all
applicable sections of the Santa Ana Municipal Code, the California Administrative Code,
the California Building Standards Code and all other applicable regulations.
The applicant must comply in full with each and every condition listed below rip or to
exercising the rights conferred by this variance.
The applicant must remain in compliance with all conditions listed below throughout the life
of the variance. Failure to comply with each and every condition may result in the
revocation of the variance.
A. Planning Division
All proposed improvements must conform to the Site Plan Review approval
of DP No. 2010 -47 and the staff report exhibits.
2. Any amendment to this variance must be submitted to the Planning Division
for review. At that time, staff will determine if administrative relief is available
or the variance must be amended.
3. Landscaping, once installed, shall be maintained per the approved
landscape plan. After project occupancy, landscaping is to be maintained to
include the minimum level of plant materials installed at the time of
occupancy and per the approved plan.
4. Vines are required to be added to all block walls that face a public street.
Exhibit "D"
Conditions for Approval for Vesting Tentative Tract Map No. 2012 -02
(County Map No. 17231)
Should the Planning Commission approve Vesting Tentative Tract Map No. 2012 -02
(County Map No. 17231), the approval is subject to compliance, to the reasonable
satisfaction of the Planning Manager, with all applicable sections of the Santa Ana
Municipal Code, the California Administrative Code, the California Building Standards
Code and all other applicable regulations.
The applicant must comply in full with each and every condition listed below rip or to
exercising the rights conferred by this vesting tentative tract map.
The applicant must remain in compliance with all conditions listed below throughout the life
of the map. Failure to comply with each and every condition may result in the revocation
of the vesting tentative tract map.
A. Planning Division
The Covenants, Conditions and Restrictions (CC &R's) for this project must
be reviewed and approved prior to approval of the final tract map.
2. Any amendment to the vesting tentative tract map must be submitted to the
Planning Division for review. At that time, staff will determine if
administrative relief is available or the map must be amended.
3. Landscaping, once installed, shall be maintained per the approved
landscape plan. After project occupancy, landscaping is to be maintained to
include the minimum level of plant materials installed at the time cf
occupancy and per the approved plan. This requirement shall also be
incorporated into the CC &R's for the project.
4. The CC &R's must include language that requires all required landscaping
must be installed within a specified time period.
A solid block wall not less than six feet in height must be provided around
the project perimeter. In the event the applicant is unable to secure approval
from the adjacent property owners, a revised fence plan shall be submitted
to the Planning Division for review and approval.
6. The final map must be approved and recorded prior to issuance of building
permits.
7. Development within the area of the map is subject to development and
permit fees in effect at the time of permit issuance.
Exhibit "E"
March 4, 2014
PAGE 2OF2
8. Development within the area of the map is subject to design and
development standards in effect at the time of permit issuance.
9. The project must be in compliance with the provisions of Site Plan Review
(DP No. 2010 -47).
10. Two copies of the recorded final map and CC &R's shall be submitted each
to the Planning Division, Fire Authority, Building Division, and Public Works
Agency within 10 days of recordation.
11. The final map and all improvements required to be made or installed by the
subdivider must be in accordance with the design standards and
specifications of the Santa Ana Municipal Code and the requirements of the
State Subdivision Map Act.
12. The interior of the Sexlinger Farmhouse shall be rehabilitated to building
code standards in order to return the structure to a habitable condition.
18. Prior to issuance of any building permits for the site, a covenant shall be
recorded that requires the existing and replacement oranges trees be
maintained on the Sexlinger Farmhouse site.
14.
standards, shall be provided on the project's streets. (Added by the
Planning Commission February 10, 2014.)
15. The exterior of the Sexlinger Farmhouse and garage shall be rehabilitated in
compliance with the Secretary of the Interior's Standards for the Treatment
of Historic Properties - Rehabilitation Guidelines. (Added by the Planning
Commission February 10, 2014.)
16.
Commission February 10, 2014.)