Loading...
HomeMy WebLinkAboutORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (24) - 20151 2 3 4 5 N 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C -4 -1882 BETWEEN ORANGE COUNTY TRANSPORTATION AUTHORITY AND CITIES OF COSTA MESA, NEWPORT BEACH, AND SANTA ANA FOR BRISTOL STREET REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION PROJECT THIS COOPERATIVE AGREEMENT (Agreement), is effective this —"2� day of 201 by and between the Orange County Transportation Authority, 550 South Main Street, .O. Box 14184, Orange, California 92863 -1584, a public corporation of the State of California (herein after referred to as "AUTHORITY') and the cities of Costa Mesa, Newport Beach, and Santa Ana (hereinafter referred to as "PARTICIPATING AGENCIES ") each individually known as "Party" and collectively known as the "Parties ". RECITALS: WHEREAS, the AUTHORITY in cooperation with the PARTICIPATING AGENCIES is working together in coordinating traffic signals across multiple jurisdictional boundaries as a part of the Renewed Measure M (M2) Regional Traffic Signal Synchronization Program Project P (Project P) to enhance countywide traffic flow and reduce congestion; and WHEREAS, the AUTHORITY has completed the competitive 2014 Call for Projects (hereinafter, "2014 CALL ") in support of Project P and awarded Project P funds based on the application (hereinafter, "APPLICATION ") prepared by the City of Costa Mesa (hereinafter referred to as the "APPLICANT AGENCY ") for implementation of signal synchronization of traffic signals along Bristol Street (hereinafter, "PROJECT "); and WHEREAS, the PARTICIPATING AGENCIES in their approved APPLICATION have elected to designate the AUTHORITY and the AUTHORITY agrees to act as the implementing agency to carry out the PROJECT; and Page 1 of 14 A- 2015.053 v MD 1 COOPERATIVE AGREEMENT NO. C -4 -1882 2 BETWEEN g' 3 ORANGE COUNTY TRANSPORTATION AUTHORITY 4 AND 5 CITIES OF COSTA MESA, NEWPORT BEACH, AND SANTA ANA 6� 6 FOR fl.. 7 BRISTOL STREET REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION PROJECT s� 8 THIS COOPERATIVE AGREEMENT (Agreement), is effective this day of lV 9 201_, by and between the Orange County Transportation Authority, 550 South ' 10 Main Street, P.O. Box 14184, Orange, California 92863 -1584, a public corporation of the State of TJ 11 California (herein after referred to as "AUTHORITY') and the cities of Costa Mesa, Newport Beach, and 12 Santa Ana (hereinafter referred to as "PARTICIPATING AGENCIES ") each individually known as 13 "Party" and collectively known as the "Parties ". 14 RECITALS: 15 WHEREAS, the AUTHORITY in cooperation with the PARTICIPATING AGENCIES is working 16 together in coordinating traffic signals across multiple jurisdictional boundaries as a part of the Renewed 17 Measure M (M2) Regional Traffic Signal Synchronization Program Project P (Project P) to enhance 18 countywide traffic flow and reduce congestion; and 19 WHEREAS, the AUTHORITY has completed the competitive 2014 Call for Projects (hereinafter, 20 °2014 CALL ") in support of Project P and awarded Project P funds based on the application 21 (hereinafter, "APPLICATION') prepared by the City of Costa Mesa (hereinafter referred to as the 22 "APPLICANT AGENCY') for implementation of signal synchronization of traffic signals along Bristol 23 Street (hereinafter, 'PROJECT'); and 24 WHEREAS, the PARTICIPATING AGENCIES in their approved APPLICATION have elected 25 to designate the AUTHORITY and the AUTHORITY agrees to act as the implementing agency to carry 26 out the PROJECT; and Page 1 of 14 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET — TSSP 1 WHEREAS, the PROJECT will include approximately forty -five (45) traffic signalized 2 intersections as identified in the APPLICATION; and S WHEREAS, the PROJECT will include elements identified in the APPLICATION including 4 certain hardware and software upgrades to intersection traffic controller units, traffic telematics and 5 intertie systems, Advanced Transportation Management Systems (ATMS), and other associated 6 systems (hereinafter collectively referred to as "TRAFFIC CONTROL ELEMENTS "), which will be 7 constructed and /or installed and implemented as part of the PROJECT as identified in the 8 APPLICATION; and 9 WHEREAS, the AUTHORITY agrees to work with PARTICIPATING AGENCIES to 10 coordinate the inclusion of other traffic control elements (OTHER ELEMENTS) that should be 11 installed at the same time as the construction of the PROJECT and are not a part of this Agreement; 12 and 13 WHEREAS, all costs associated with the inclusion of these OTHER ELEMENTS are the sole 14 responsibility of the AGENCY owning each and any of those OTHER ELEMENTS during the course 15 of the project; and 16 WHEREAS, based on the APPLICATION, the AUTHORITY agrees to implement the 17 PROJECT; and 16 WHEREAS, the PARTICIPATING AGENCIES per the M2 Ordinance, agree to provide 19 PROJECT funding in a combined cash match and in -kind services match of Four Hundred Seventy - 20 One Thousand One Hundred Fifty -Five Dollars ($471,155.00), or equivalent to twenty percent (20 %) of 21 the PROJECT cost, as shown in Attachment A; and 22 WHEREAS, the AUTHORITY and the PARTICIPATING AGENCIES desire to enter into this 26 Agreement to implement the PROJECT in support of Project P; and 24 WHEREAS, this Agreement defines the specific terms, conditions and funding responsibilities 25 between the AUTHORITY and the PARTICIPATING AGENCIES for the implementation of the 26 PROJECT. Page 2 of 14 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET — TSSP 1 WHEREAS, the AUTHORITY's Board of Directors approved funding for the PROJECT and 2 authorized the Chief Executive Officer to negotiate and execute this cooperative agreement on April 8, 3 2013. 4 WHEREAS, the CITY of Costa Mesa's City Council approved this Agreement 5 on the 2-1 day of 20 6 WHEREAS, 4e CITY of Ne ort Beach's City Council approved this Agreement y on the / Y day of X1 as„ 6-� 20 // . 8 WHEREAS, the CITY of Santa Ana's City Council approved this Agreement 9 on the le day of � • 20 y S 10 NOW, THEREFORE, it is mutually understood and agreed by AUTHORITY and the 11 PARTICIPATING AGENCIES as follows: 12 ARTICLE 1. COMPLETE AGREEMENT 13 A. This Agreement, including any attachments incorporated herein and made applicable by 14 reference, constitutes the complete and exclusive statement of the term(s) and conditions(s) of this 15 Agreement between AUTHORITY and PARTICIPATING AGENCIES and it supersedes all prior 16 representations, understandings, and communications between the parties. The invalidity in whole or in 17 part of any term or condition of this Agreement shall not affect the validity of other term(s) or 18 conditions(s) of this Agreement. The above referenced Recitals are true and correct and are 19 incorporated by reference herein. 20 B. AUTHORITYS' failure to insist on any instance(s) of PARTICIPATING AGENCIES' 21 performance of any term(s) or condition(s) of this Agreement shall not be construed as a waiver or 22 relinquishment of AUTHORITY's right to such performance or to future performance of such term(s) or 23 condition(s), and PARTICIPATING AGENCIES' obligation in respect thereto shall continue in full force 24 and effect. Changes to any portion of this Agreement shall not be binding upon AUTHORITY except 25 when specifically confirmed in writing by an authorized representative of AUTHORITY by way of a 26 written amendment to this Agreement and issued in accordance with the provisions of this Agreement. Page 3 of 14 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET — TSSP 1 C. PARTICIPATING AGENCIES' failure to insist on any instance(s) of AUTHORITY's 2 performance of any term(s) or condition(s) of this Agreement shall not be construed as a waiver or 3 relinquishment of PARTICIPATING AGENCIES' right to such performance or to future performance of 4 such term(s) or condition(s), and AUTHORITY's obligation in respect thereto shall continue in full force 5 and effect. Changes to any portion of this Agreement shall not be binding upon PARTICIPATING 6 AGENCIES except when specifically confirmed in writing by an authorized representative of 7 PARTICIPATING AGENCIES by way of a written amendment to this Agreement and issued in 8 accordance with the provisions of this Agreement. 9 ARTICLE 2. SCOPE OF AGREEMENT 10 This Agreement specifies the roles and responsibilities of the Parties as they pertain to the 11 subjects and projects addressed herein. Both AUTHORITY and PARTICIPATING AGENCIES agree 12 that each will cooperate and coordinate with the other in all activities covered by this Agreement and 13 any other supplemental agreements that may be required to facilitate purposes thereof. 14 ARTICLE 3. RESPONSIBILITIES OF AUTHORITY 15 AUTHORITY agrees to the following responsibilities for funding of the PROJECT: 16 A. AUTHORITY shall implement the PROJECT based on the Intent of the usage in the 17 APPLICATION prepared by the APPLICANT AGENCY in accordance with the policies and procedures 18 contained in the CTFP Guidelines. 19 B. AUTHORITY shall provide oversight in order to maintain inter - jurisdictional traffic signal 20 operational integrity between PROJECT and other similar existing and new M2 Project P funded 21 projects not older than 3 years. 22 C. AUTHORITY will act as the LEAD AGENCY and provide and file all documentation 23 necessary to comply with California Environmental Quality Act (CEQA) regulations for PROJECT. 24 D. AUTHORITY shall perform web -based public outreach activities for the project to 25 communicate major project milestones and results. 26 Page 4 of 14 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET — TSSP 1 E. AUTHORITY shall provide formats, templates, and guidance in reporting requirements 2 as described in Comprehensive Transportation Funding Program (CTFP). 3 F. AUTHORITY, or agents of AUTHORITY, under this Agreement and upon close -cut of 4 PROJECT, may perform a technical and /or field review to ensure that the CTFP Guidelines, policies, 5 and procedures were followed. Such a review may be performed one hundred and eighty (180) days 8 after the PROJECT three (3) year grant period is complete. If the technical and or field review 7 determines that any of the activities performed are ineligible for CTFP funding, PARTICIPATING 8 AGENCIES must reimburse and return the amount of funding used to perform the ineligible activity to 9 AUTHORITY. 10 G. AUTHORITY shall invoice the PARTICIPATING AGENCIES as identified in the 11 PROJECT 2014 CALL APPLICATION and Attachment A for the dollar cash match at the start of the 12 PROJECT or at a mutually agreed upon time to facilitate any respective AGENCY funding 13 timeframes. 14 H. AUTHORITY shall request updates on the PROJECT as part of semi- annual review 15 process, including documentation of in -kind match conforming to Attachment A and will include the 16 PROJECT in the list of active projects in OCfundTrAcker until completion of the three (3) year grant 17 , period. Documents to be provided include, but are not limited to, payroll records, contracts, and 18 purchase orders. 19 ARTICLE 4. RESPONSIBILITIES OF THE AUTHORITY AS PROJECT LEAD AGENCY 20 The AUTHORITY as the LEAD AGENCY agrees to the following responsibilities for the 21 implementation of the PROJECT: 22 A. AUTHORITY shall act as the LEAD AGENCY for the work necessary to manage, 23 procure, and complete the PROJECT as identified in.Attachment A. 24 B. To coordinate outreach with the PARTICIPATING AGENCIES for the PROJECT. 25 C. To collect all data necessary to provide new optimized timing plans including but not 28 limited to manual intersection all movement counts and automated machine traffic and vehicle Page 5of14 1 2 91 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 IA1 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET —TSSP classification counts. D. To develop and implement new timing plans optimized for signal synchronization. E. To provide updated timing plans for all control systems and all relevant data used to develop said plans to the PARTICIPATING AGENCIES. F. To prepare a "Before and After Study" for the PROJECT as described in the Measure M2 Eligibility Guidelines adopted by the AUTHORITY. The "Before and After Study" for the project is considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section B.111.9) for the PROJECT. The AUTHORITY shall provide the "Before and After Study" to the PARTICIPATING AGENCIES in draft and final formats for review and comment. AGENCY comments shall be noted in the final study. If specified in original PROJECT APPLICATION, the AUTHORITY shall provide a "Before and After Study" video of a representative portion of PROJECT. ARTICLE S. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES: The PARTICIPATING AGENCIES agree to the following responsibilities for implementation and funding of the PROJECT: A. Provide a technical representative to meet and participate as a member of the PROJECT's Traffic Forum, B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the PROJECT. C. To participate and support the PROJECT implementation within the timeframe outlined in the APPLICATION and consistent with the CTFP Guidelines adopted by the AUTHORITY. D. To provide the AUTHORITY all current intersection, local field master, and/or ATMS timing plans and related data upon request. E. To provide the local cash match and/or documentation for the in -kind services match for the PROJECT in accordance with Attachment A. Failure to provide included local cash match and/or evidence of in -kind services match may result in the loss of future participation for competitive 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET —TSSP funding opportunities F. PARTICIPATING AGENCIES that have included a dollar match as identified in Attachment A shall provide payment for the dollar match to the AUTHORITY within thirty (30) calendar days of receipt of an invoice. G. PARTICIPATING AGENCIES that have included an in -kind services match as identified in Attachment A shall provide documentation of conformance as part of the semi - annual review process. H. To waive all fees associated with any local agency permits that may be required of the OCTA Consultant, sub — consultants, and /or service or equipment providers in the performance of this project. I. PARTICIPATING AGENCIES shall provide updates to the AUTHORITY on the PROJECT as part of semi - annual review process until completion of the three (3) year PROJECT grant period. Documents to be provided include, but are not limited to, payroll records, contracts, and purchase orders. J. PARTICIPATING AGENCIES shall, if specified in the APPLICATION, continue Ongoing Monitoring and Maintenance after the three (3) year grant period is complete and continue until the end of the PROJECT per additional Maintenance of Effort in the APPLICATION. ARTICLE 6. DELEGATED AUTHORITY The actions required to be taken by PARTICIPATING AGENCIES in the implementation of this Agreement are delegated to their respective City Manager, or designee, and the actions required to be taken by AUTHORITY in the implementation of this Agreement are delegated to AUTHORITY's Chief Executive Officer or designee. ARTICLE 7. AUDIT AND INSPECTION PARTICIPATING AGENCIES shall maintain a complete set of records in accordance with generally accepted accounting principles. Upon reasonable notice, PARTICIPATING AGENCIES shall permit the authorized representatives of the AUTHORITY to inspect and audit all work, materials, Page 7of14 COOPERATIVE AGREEMENT NO. C4-1882 BRISTOL STREET — TSSP 1 payroll, books, accounts, and other data and records of PARTICIPATING AGENCIES for a period of 2 four (4) years after final payment, or until any on -going audit is completed. For purposes of audit, the 3 date of completion of this Agreement shall be the date of AUTHORITY's payment of OCTA Consultant's 4 final billing (so noted on the invoice) under this Agreement. AUTHORITY shall have the right to 5 reproduce any such books, records, and accounts. The above provision with respect to audits shall 6 extend to and/or be included in contracts with PARTICIPATING AGENCIES' contractor. 7 ARTICLE 8. INDEMNIFICATION 8 A. To the fullest extent permitted by law, PARTICIPATING AGENCIES shall defend (at g PARTICIPATING AGENCIES' sole cost and expense with legal counsel reasonably acceptable to 10 AUTHORITY), indemnify, protect, and hold harmless AUTHORITY, its officers, directors, employees, 11 and agents (collectively the "Indemnified Parties "), from and against any and all liabilities, actions, suits, 12 claims, demands, losses, costs, judgments, arbitration awards, settlements, damages, demands, 13 orders, penalties, and expenses including legal costs and attorney fees (collectively "Claims "), including 14 but not limited to Claims arising from injuries to or death of persons (PARTICIPATING AGENCIES' 15 employees included), for damage to property, including property owned by AUTHORITY, or from any 16 violation of any federal, state, or local law or ordinance, alleged to be caused by the negligent acts, 17 omissions or willful misconduct of PARTICIPATING AGENCIES, its officers, directors, employees or 18 agents in connection with or arising out of the performance of this Agreement. 19 B. To the fullest extent permitted by law, AUTHORITY shall defend (at AUTHORITY's sole 20 cost and expense with legal counsel reasonably acceptable to PARTICIPATING AGENCIES), 21 indemnify, protect, and hold harmless PARTICIPATING AGENCIES, its officers, directors, employees, 22 and agents (collectively the "Indemnified Parties "), from and against any and all liabilities, actions, suits, 23 claims, demands, losses, costs, judgments, arbitration awards, settlements, damages, demands, 24 orders, penalties, and expenses including legal costs and attorney fees (collectively "Claims "), including 25 but not limited to Claims arising from injuries to or death of persons (AUTHORITY's employees 26 included), for damage to property, including property owned by PARTICIPATING AGENCIES, or from Page 8 of 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 21 22 23 3! 25 M1 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET — TSSP any violation of any federal, state, or local law or ordinance, alleged to be caused by the negligent acts, omissions or willful misconduct of AUTHORITY, its officers, directors, employees or agents in connection with or arising out of the performance of this Agreement. C. The indemnification and defense obligations of this Agreement shall survive its expiration or termination. A. Term of Agreement: This Agreement shall be effective on in full force and effect for forty -eight 48 months through shall be B. Termination: In the event either Party defaults in the performance of their obligations under this Agreement or breaches any of the provisions of this Agreement, the non - defaulting Party shall have the option to terminate this Agreement upon thirty (30) days' prior written notice to the other Party. C. Termination for Convenience: Either Party may terminate this Agreement for its convenience by providing thirty (30) days' prior written notice of its intent to terminate for convenience to the other Party. D. AUTHORITY and PARTICIPATING AGENCIES shall comply with all applicable federal, state, and local laws, statues, ordinances and regulations of any governmental authority having jurisdiction over the PROJECT. E. Legal Authority: AUTHORITY and PARTICIPATING AGENCIES hereto consent that they are authorized to execute this Agreement on behalf of said Parties and that, by so executing this Agreement, the Parties hereto are formally bound to the provisions of this Agreement. F, Severability: If any term, provision, covenant or condition of this Agreement is held to be invalid, void or otherwise unenforceable, to any extent, by any court of competent jurisdiction, the remainder of this Agreement shall not be affected thereby, and each term, provision, covenant or condition of this Agreement shall be valid and enforceable to the fullest extent permitted by law. G. Counterparts of Agreement: This Agreement may be executed and delivered in any Page 9of14 COOPERATIVE AGREEMENT NO. C-4 -9882 BRISTOL STREET — TSSP 1 number of counterparts, each of which, when executed and delivered shall be deemed an original and 2 all of which together shall constitute the same agreement. Facsimile signatures will be permitted. 3 H. Force Maieure: Either Party shall be excused from performing its obligations under this 4 Agreement during the time and to the extent that it is prevented from performing by an unforeseeable 5 cause beyond its control, including but not limited to; any incidence of fire, flood; acts of God; 6 commandeering of material, products, plants or facilities by the federal, state or local government; 7 national fuel shortage; or a material act or omission by the other Party; when satisfactory evidence of 8 such cause is presented to the other Party, and provided further that such nonperformance is g unforeseeable, beyond the control and is not due to the fault or negligence of the Party not performing. 10 t. Assignment: Neither this Agreement, nor any of the Parties' rights, obligations, duties, or 11 authority hereunder may be assigned in whole or in part by either Party without the prior written consent 12 of the other Party in its sole and absolute discretion, Any such attempt of assignment 13 shall be deemed void and of no force and effect. Consent to one 14 assignment shall not be deemed consent to any subsequent assignment, nor the waiver of any 15 right to consent to such subsequent assignment. 16 J. Governing Law: The laws of the State of California and applicable local and federal laws, 17 regulations and guidelines shall govern this Agreement. 18 K. Litigation fees: Should litigation arise out of this Agreement for the performance thereof, 19 the court shall award costs and expenses, including attorney's fees, to the prevailing party. 20 L. Notices: Any notices, requests, or demands made between the Parties pursuant to this 21 Agreement are to be directed as follows: 22 1 23 24 1 25 26 Page 10 of 14 1 2 3 4 5 6 7 8 AN 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET — TSSP To COSTA MESA: To AUTHORITY: City of Costa Mesa Orange County Transportation Authority 77 Fair Drive 550 South Main Street P.O. Box 1200 P. O. Box 14184 Costa Mesa, CA 92 Orange, CA 92863 -1584 Attention: Raja Sethuraman Attention: Venita Anderson Transportation Services Manager Senior Contract Administrator (714) 754 -5032 Tel: (714) 560 -5427 Email: raja .sethuraman(@costamesaca.gov E -mail: vanderson(@octa.net To NEWPORT BEACH: To SANTA ANA: City of Newport Beach City of Santa Ana 100 Civic Center Drive Public Works Agency P.O. Box 1768 20 Civic Center Plaza, M -43 Newport Beach, CA 92658 -8915 Santa Ana, CA 92701 Attention: Brad Sommers Attention: Vinh Nguyen Senior Civil Engineer Senior Civil Engineer (949) 644 -3326 (714) 647 -5612 Email: bsommers(dmewportbeachca.gov Email: nvnguyenC@santa- ana.orq i i 9 Page 11 of 14 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET — TSSP 1 This Agreement shall be made effective upon execution by all Parties. 2 IN WITNESS WHEREOF, the parties hereto have caused this Agreement No. C-4 -1882 to be 3 executed on t ate first above. 4 CITY O RANGE COU TY T NSP TATION AUTHORITY 5 By: By: Stephen M. Mensinger Darrell Jo ns 6 Mayor Chief Exe , ve Officer h 7 ATTEST: APPROVED AS TO FORM: r 8 QQ�,���,, ..__,,^^-- 9 By:.(%T.X - &Oxylall- By: Brenda Green Kennard R. Smart, Jr. 10 City Clerk General Counsel 11 APPROV IR M: APPROVAL REC 12 By: By: 13 117 u rt Kia Mortazavi City Attorney Executive Dire or, Planning 14 15 Dated- Dated 16 17 18 19 20 21 22 23 4 � 5 06 Page 12 of 14 1 2 3 4 5 6 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1 COOPERATIVE AGREEMENT NO. C -4 -1882 BRISTOL STREET — TSSP This Agreement shall be made effective upon execution by all Parties. IN WITNESS WHEREOF, the parties hereto have caused this Agreement No. C-4 -1882 to be executed on the date first written above. CITY OF NEWPORT BEACH By: 44b L Edward D. Selich Mayor ATTEST* � By: ' Leilani I. Brown City Clerk APPROVED AS TO FORM: Aaron C. Harp C4M 0 -I1()iW City Attorney Dated : 1 21101 N Page 13 of 14 COOPERATIVE AGREEMENT NO. C -4 -1882 BRISTOL STREET - TSSP 1 This Agreement shall be made effective upon execution by all Parties. 2 IN WITNESS WHEREOF, the parties hereto have caused this Agreement No. C -4 -1882 to be 3 executed on the date first written above. 4 CITY OF SANTA ANA 5 By: David vazos 6 City Manager 7 ATTEST: 8 By: -78 An,� /' Maria D. Huizar 9 City Clerk 10 APP eV FORM: 11 By: N 12 S is C alho C Attor y 13 Dated : :316 I S 14 15 16 17 18 19 20 21 22 23 24 25 26 Page 14 of 14 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET — TSSP ATTACHMENT A DETAILED LOCAL MATCH COMMITMENT SECTION 1: AGENCY TOTAL MATCH SUMMARY AGENCY CASH IN -KIND TOTAL MATCH City of Costa Mesa $125,396.00 $19,984.00 $145,380.00 City of Newport Beach $56,963.00 $13,977.00 $70,940 City of Santa Ana $223,450.00 $31,385.00 $254,835.00 TOTAL $405,809.00 $65,346.00 $471,155100 SECTION 2: MATCH BREAKDOWN (CASH VS IN -KIND SERVICES) A. Cash Match Agency Funding Source Amount of Cash Contribution City of Costa Mesa NIA $125,396.00 City of Newport Beach $ $56,963.00 City of Santa Ana $223,450.00 TOTAL $405,809.00 B. In -Kind Services i. Specific Improvements (List items and Cost): Agency Improvement Date of Construction Expenditure NIA $ TOTAL Page A — 1 COOPERATIVE AGREEMENT NO. C-4 -1882 BRISTOL STREET — TSSP ATTACHMENTA ii. Staffing Commitment., Agency Staff Position Type of Service to No of Fully Burdened Total* Project Hours. Hourly Rate City of Costa Transportation Oversight 16 $200.00 $3,200.00 Mesa Services Manager City of Costa Mesa Associate Engineer Project Manager 40 $150.00 $6,000.00 City of Costa Mesa Assistant Engineer Signal Timing 40 $140.00 $5,600.00 City of Costa Mesa Engineering Tech Technical Field Support 43.2 $120.00 $5,184.00 Total for City of Costa Mesa: $19,984.00 Agency Staff Position Type of Service to No. of Fully Burdened Total* Project Hours Hourly Rate City of Newport Senior Civil Oversight 15 $170.00 $2,550.00 Beach Engineer City of Newport Associate Civil Project Manager 48 $130.00 $6,240.00 Beach Engineer City of Newport Junior Engineer Signal Timing, Implementation, 19.9 $130.00 $2,587.00 Beach Monitoring City of Newport Senior Inspector Construction Inspection 20 $130.00 $2,600.00 Beach Total for City of Newport Beach: $13,977.00 Agency Staff Position Type of Service to No. of Fully Burdened Total* Project Hours Hourly Rate City of Santa Ana Sr. Civil Engineer Project Admin / Review 16 $233.00 $3,728.00 City of Santa Assistant Engineer II g Project Design / Implement / 40 $213.00 $8,520.00 Ana Construction Engineer City of Santa Assistant Traffic Project Design / Implement / 40 $213.00 $8,520.00 Ana Operation Engineer Construction Engineer City of Santa Construction Inspector Construction Engineer 48 $187.00 $8,976.00 Ana City of Santa Engineering nterns g Project Design / Implement / 40.03 $41.00 $1,641.00 Ana Construction Engineer Total for City of Santa Ana: $31,385.00 TOTAL IN -KIND MATCH*: $65,346.00 *Total amount is the required participation by the identified agency. The number of hours and hourly rate will be based on each agency's actual fully burdened billing rates, which must collectively equal the same value of the assigned "Total" dollars. Each agency will be responsible for keeping detailed records of hours worked and description of work. An accounting record of personnel, hours at fully burdened rate is expected to be included with the final submittal. Records will be subject to auditing. Page A — 2