HomeMy WebLinkAboutUnion Pacific Railroad Company 7AGREEMENT TERMINATION C 1
Please complete this form when the attached agreement is no longer in effect.
;Return form to the Deputy Cleric of the Council (M -30). Call d �f n
.have any questions. �'I T . r 9.
{
V
The agreement with ONIDq,f '/ tN 1 1Ldy � i7 A_
was completed on -7 and final payment has been made.
Department: Pvj&. c-
Signature; -
Date: �' l
City of Santa Ana
Clerk of the Council
L
Signal Interconnect 010126
Form Approved, AVP -Law
SIGNAL INTERCONNECT AGREEMENT
Folder No.: 2098 -12
A- 2002 -218
F1fo �s�7
THIS AGREEMENT, made this Vs day of IJC71 o'5C-1Z , 200 Z—, by and between
UNION PACIFIC RAILROAD COMPANY, a Delaware corporation, to be addressed at 1800 Farnam
Street, Omaha, Nebraska 68102 (hereinafter "Railroad "), and CITY OF SANTA ANA a(n) California
municipal corporation to be addressed at PO Box 1988, Santa Ana, CA 92702 (hereinafter "Political Body "),
WITNESSETH:
WHEREAS, Political Body desires to undertake as its project the installation of highway traffic control
signals at the intersection of of the Railroad track and Greeneville Street in Santa Ana, Orange County,California, as
shown on the print(s), marked Exhibit A, hereto attached and hereby made a part hereof; and
WHEREAS, Railroad has grade crossing protection devices at the intersection of its track and Greenville
Street at Mile Post 522.42, Santa Ana Industrial Lead; and
WHEREAS, Railroad agrees to install the necessary relays and other materials required to interconnect and
coordinate the operation of said railroad grade crossing protection devices with the operation of said highway traffic
control signals. Said work is to be performed at the sole expense of Political Body; and
WHEREAS, Political Body and Railroad, severally and collectively, desire to interconnect and coordinate
the operation of said signals.
NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the
parties hereto to be by them respectively kept and performed as hereunder set forth, it is agreed as follows:
SECTION 1 - SCOPE OF WORK
a). Political Body and Railroad, severally and collectively, agree to interconnect and coordinate the operation
of the railroad grade crossing protection devices with the operation of the highway traffic control signals at Mile
Post 522.42, Santa Ana Industrial Lead.
b). Railroad agrees to install the necessary relays and other materials required for interconnect at Political
Body's expense, as set forth in Section 1(d) below.
c). Railroad hereby grants permission and authority to Political Body and /or its contractor to install the conduit
with the necessary wiring beneath the track on the condition that Political Body requires any of its contractors
performing work on Railroad's property to enter into a Right of Entry Agreement with Railroad. Political Body
acknowledges receipt of a copy of the Right of Entry Agreement and understanding of its terms, provisions, and
requirements, and will inform its contractor of the need to execute the agreement. Under no circumstances will
Political Body's contractor be allowed onto Railroad's premises without first executing the Right of Entry
Agreement.
d). The Political Body agrees to reimburse the Railroad for one hundred percent (100 %) of Railroad's actual
labor and material costs associated with the work and materials described herein. The Railroad estimates such cost
to be TWELVE THOUSAND TWO HUNDRED TWENTY -SEVEN ($12,227.00), as set for in Estimate of
Material and Force Account dated July 22, 2002, marked Exhibit B, hereto attached and hereby made a part hereof.
During the performance of such work the Railroad will provide progressive billing to Political Body based on
2098 -12 City of Santa Ana, CA Page 1 July 31, 2002
Greenville Street
Signal Interconnect 010126
Form Approved, AVP -Law
Folder No.: 2098 -12
Railroad's actual costs. Actual costs to the Railroad shall include customary additives to materials, services and
labor provided by the Railroad. Within one hundred twenty (120) days after Railroad has completed its work, the
Railroad will submit a final billing to Political Body for any balance owed. Political Body shall pay the Railroad
within Thirty (30) days of its receipt of all bills submitted by the Railroad.
SECTION 2 - CONSTRUCTION AND MAINTENANCE
Railroad will furnish all labor, material, equipment and supervision for and shall install traffic pre - emption
in an existing cabin.
SECTION 3 - PAYMENT
In addition to the payment set forth in Section 1D above, in consideration of Political Body's agreement to
perform and abide by the terms of this Agreement and the work to be performed by Railroad, Political Body agrees
to pay Railroad an administrative fee of FIVE HUNDRED DOLLARS ($500.00) upon the execution of this
Agreement.
SECTION 4 -
a). Except as set forth in Section 5, Political Body shall not be liable to Railroad on account of any failure of
Railroad's flasher lights to operate properly nor shall Railroad have or be entitled to maintain any action against
Political Body arising from any failure from Railroad's flasher lights to operate properly. Similarly, Railroad shall
not be liable to Political Body on account of any failure of Political Body's traffic signal to operate properly nor
shall Political Body have or be entitled to maintain any action against Railroad arising from any failure of Political
Body's traffic signal to operate properly.
b). Political Body reserves the right to cancel this agreement for any reason and at any time prior to Railroad
proceeding with any part of the work outlined herein.
c). Fiber optic cable systems may be buried on Railroad's property. Protection of the fiber optic cable systems
is of extreme importance since any break could disrupt service to users resulting in business interruption and loss of
revenue and profits. Political Body or its contractor(s) shall telephone the Railroad during normal business hours
(7:00 a.m. to 9:00 p.m., Central Time, Monday through Friday, except holidays) at 1- 800 - 336 -9193 (also a 24 -hour
number, 7 day number for emergency calls) to determine if fiber optic cable is buried anywhere on Railroad's
premises to be used by Political Body or its contractor(s). If it is, Political Body or its contractor(s) will telephone
the telecommunication company(ies) involved, arrange for a cable locator, and make arrangements for relocation or
other protection of the fiber optic cable prior to beginning any work on Railroad's premises.
SECTIONS - INTERFERENCE
Each party shall take all suitable precautions to prevent any interference (by induction, leakage of
electricity or otherwise) with the operation of the other party's signals or communications lines, or those of its
tenants; and if, at any time, the operation or maintenance of its signals results in any electrostatic effects, the party
whose signals are causing the interference shall, at its expense, immediately take such action as may be necessary to
eliminate such interference.
2098 -12 City of Santa Ana, CA Page 2 July 31, 2002
Greenville Street
Signal Interconnect 010126
Form Approved, AVP -Law
Folder No.: 2098 -12
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in duplicate on
the day and year first herein written.
LI]\TMI Q
Liz
A TTL O T.
CITY MANAGER
COMPANY
OF SA A A
4 6z�
DIRECTOR, PUBLIC WORKS AGENCY
k FIP OiF� �i.6 1F8 FORM
_.1l
LISA E. S p ! ti
Assistant city Attorney
2098 -12 City of Santa Ana, CA Page 3 July 31, 2002
Greenville Street
N
I LOCATION PUBLIC RDil
D
W® ®E CROSSING SIGNAL E\ ll ERCON NL C ll
5 CONSTRUCTION PROJECT
iEIL -�.�n
%MOTTONRIVER �, "' iW�$ I m x " x o
tGONIA 5 )pg ilj ! qa 34+u. rn D.. m 'a CARLTON v,..
ENDER m W CASTOR �; a?.0 W GLENWOOD N y I" y v
IECRE55 CORIENDER WISTERIAx r o] N d Nv n. C MDENm OO yr y N
-__ QUARTZ GOODITE W HARVARD I.] �J �p�ia f,Exr, N O.. n D '2 m < Q p.�.
:LLIA CANDYTUfT GALEN W50R9HANt ur ,C1Q�W��w D B to n 3- m m o m A x z
TON 4EOP - W MAYWOOD YyS _ p x m q O. x a N 'm
AQUAMARINE �+ 'q. v D A
CCABE RIV GtApST�F'he 4 'o n.-ri m {. y
.RNER ..oastline.Ga�nmunrty Co ege N x d O '� D W WARNER
m y —y f O x FW HALL D nQ o
Z' tk3'
J = MARTENS RIVER m IVIP 522.42 Santa Ana Industrial LeadG��. o D
a COLEY RIVER > z
SLATER m S GERSTRO ...E 'stir'„ At-Grade Public Road Crossing
EM OCK>l�'
n A V 6 ❑X7
Z o a Reconstruction Project
T { x M L i m sR� '9 Op WALTON
D G4RRY m °' m ,D �fi,. 'd W CAF
M { kLAKE .I. d'Sam TgtJ ECOLUMBINE
TALBERT y MRCARTH R BI
m u m c C to W MACARTHUR ggprpgx > ER = x� z yr p m
u+,p 0 rn m m r BAY CREST x W AURORA
n c ¢ C 'c v KELLER NOBEL
s = SUNFLOWER �SO� B, 5 m VILLAGE ..CRK m.
IS w SOSE Jyli ➢ DEEP CRK m
` { _SUNFLOWER
N
SANA m CARNATION TO CENTER
y _Z OEg( O CROCUS guna Art tJliseum Satellite ASNYON_
C Pp Wq - S COAS �'. ouch Coast Plaza Mall
21p Rt: G9 1 '.:
11A BU INGHAM
G p rd- �AClF
z raw �YmNlA 11B 10 c cy
06 oGISLER I. OARLINGFORp CONCORD YANANq q OLYMPIC T S� TRAVERSE
%
,.y ° r. 4 [at£+or stYdmexialPt B SE WAY m m PIERPON Pa
D x. L''Y PEACE VrALLEGHENY
{ p. 0 BELFAST AUSTIN xp �u
41998ALnmc,BboctAass ABA CARRWAY d. J. �, C�. RT NTA WAY �4 0?} 7S w F �ppj4G.rfAYEt't
I RAILROAD WORK TO BE PERFORMED:
11. Install traffic pre - emption in an existing cabin.
EXHIBIT "A"
UNION PACIFIC RAILROAD COMPANY
SANTA ANA INDUSTRIAL LEAD
MILE POST 522.42
GPS: N 33 °, 42.240'; W 117 °, 54.256'
SANTA ANA, ORANGE CO., CA.
Illustrative print showing location of signal interconnect construction
project with the CITY OF SANTA ANA.
Folder No. 2098 -12 Date: July 31, 2002
WARNING
IN ALL OCCASIONS, U.P. COMMUNICATIONS DEPARTMENT MUST BE CONTACTED IN ADVANCE
OF ANY WORKTO DETERMWE EXISTENCE AND LOCATION OF FIBER OPTIC CABLE. PHONE: 1-
m-Fgyg vie
gap
6 jw£ay, S 3 e SG I
� � e
ego
g_
WIN
NU
o 0 0 00 000000 0000000® o
2
F
F
N
w
J
J
Z
W
W
cc
O
F
a
W
Q
Z
O
I—
J
a
DATE: 2002 -07 -22
ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK
�+. BY THE
UNION PACIFIC RAILROAD
DESCRIPTION OF WORK:
F INSTALL TRAFFIC PRE - EMPTION IN EXISTING CABIN AT GREENVILLE STREET IN
SANTA ANA, CA. M.P. 522.42 ON THE SANTA ANA IND. LD.
SIGNAL PROJECT MANAGER: LEE BURDEN 935 -7680
RAILROAD TO PERFORM ALL WORK / COST DISTRIBUTED AS FOLLOWS:
SIGNAL -CITY OF SANTA ANA 100$ RECOLLECTIBLE
PID: 44100
AWO:
MP,SUBDIV: 522.42,
SANTAANA
SERVICE UNIT: 20
CITY:
SANTA ANA
STATE: CA
DESCRIPTION
----- ------
QTY
---
UNIT LABOR MATERIAL
---- -- --- ----- ---
RECOLL
---- ---
UPRR TOTAL
----- -----
ENGINEERING WORK
ENGINEERING
827
827
827
LABOR ADDITIVE 78%
1222
1222
1222
SIG -HWY XNG
739
-----
739
739
TOTAL ENGINEERING
-- --------
2788
-------- --------
2788
- -------
- 2788
SIGNAL WORK
MATL STORE EXPENSE
108
108
108
SIGNAL
2178
2178
2178
BILL PREP
450
450
450
CONTRACT
217
217
217
EARTH FILL
250
250
250
EQUIPMENT RENTAL
3000
3000
3000
LABOR ADDITIVE 78k
947
947
947
PERSONAL EXPENSES
665
665
665
SALES TAX
136
136
136
SIG -HWY XNG
1214
1214
1214
TRANSPORTATION CHARGES
50
50
50
USAGE EQUIPMENT
224
224
224
TOTAL SIGNAL
-- - - --- --
2611
--- - --
6828
--- -- - -- --
9439
-- ---- - ---- - --
9439
LABOR /MATERIAL EXPENSE
--- ---- --------
5399
6828
-- - - - - -- --
- - - - --
RECOLLECTIBLE/UPRR EXPENSE
12227
0 -- - - - - --
ESTIMATED PROJECT COST
12227
EXISTING REUSEABLE MATERIAL CREDIT 0
SALVAGE NONUSEABLE MATERIAL CREDIT 0
RECOLLECTIBLE LESS CREDITS
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.
January 6, 2003
MS MONICA SUTTER
PWA TRAFFIC
CITY OF SANTA ANA
PO BOX 1988 M -43
SANTA ANA CA x92702
Dear Ms. Sutter:
2r >oZ Z -�
Folder No. 2098 -12
Attached for your records is your original copy of a Signal Interconnect Agreement, fully executed on behalf
of the Railroad Company.
You are hereby authorized to proceed with the work upon proper notification to the Railroad Company's
Manager of Industry & Public Projects. In accordance with the terms of the above agreement, 10 days advance
notification upon entering the Railroad Company's right of way shall be given to the following office:
Freddy Cheung
Mgr Industry & Pub Proj
Union Pacific Railroad Co
19100 Slover Ave
Bloomington CA 92316
Phone: 909-879-6288
Fax: 909-879-6289
When you or your representative enter the Railroad Company's property, a copy of this fully executed
document must be available at the site to be shown on request to any Railroad employee or official.
Should you have any questions, please contact me at (402) 997 -3620 or e -mail me atpgfarrell@up.com.
Real Estate
Public Road Xing Distribution Letter UNION PACIFIC RAILROAD
1800 Farnam Street, Omaha, NR 68102
fx. (402) 997-3601
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
20 Civic Center Plaza
P.O. Box 1988, M -43
Santa Ana, California 92702
TRANSMITTAL
TO: Patricia E. Mealy
Clerk of the Council
DATE
'. )�.. z
January 23, 2003
SUBJECT: FULLY EXECUTED AGREEMENT FOR ALTON /GREENVILLE SIGNAL
INTERCONNECT
WE ARE ENCLOSING: THE FOLLOWING: FOR:
Under Separate Cover Letter Your Review
X herewith Prints _ Your Approval
Via Mail Specification Your Action
X Originals X Your Files
X Agreements Your Use
Copies Signatures
REMARKS: Original Agreement for your files. Project 2597: Alton/Greenville Signal
Installation.
If you have any questions, comments or concerns, please contact me at (714) 647 -5645.
Sincerely,
MONICA SUAER,,91C AIL ENGINEER
c: Rose Ann Trujillo
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
DECEMBER 2, 2002
TITLE:
AGREEMENT WITH UNION PACIFIC
RAILROAD COMPANY TO PROVIDE
SIGNAL INTERCONNECT/PRE-
EMPTION
CLERK OF COUNCIL USE ONLY:
071.0 _ r,
❑ As Recommended
❑ As Amended
❑ Ordinance on 1" Reading
❑ Ordinance on 2nd Reading
❑ Implementing Resolution
❑ Set Public Hearing For_
CONTINUED TO
FILE NUMBER —d/`
Direct the City Attorney to prepare and authorize the City Manager and
the Clerk of the Council to execute an agreement with the Union Pacific
Railroad Company to provide signal interconnect /pre - emption between the
railroad controller and the new traffic signal being constructed at
Alton Ave. and Greenville Street.
DISCUSSION
A new traffic signal is being installed at the Alton /Greenville
intersection adjacent to the railroad crossing at Greenville (Exhibit
1) . Since this traffic signal is very close to the Union Pacific
Railroad, pre - emption is required by State law for the safety of
vehicles, pedestrians and bicyclists. Signal pre - emption prevents
vehicles from getting trapped on the railroad tracks while waiting for
a green light at the intersection.
Based on the proposed agreement, Union Pacific Railroad Company will
modify their railroad equipment to facilitate communication from their
controller to the City's traffic signal controller for the required
pre - emption. Santa Ana will reimburse Union Pacific Railroad Company
for the cost of modifying their equipment. Additionally, this
agreement provides a license /easement for the City's signal
interconnect to be constructed and remain on the railroad's property
indefinitely.
ENVIRONMENTAL IMPACT
The proposed agreement is a part of the Alton /Greenville Traffic
Signal project that was previously approved for Categorical Exemption.
No additional environmental analysis is required.
Page 43
25.A.
Agreement with Union Pacific Railroad
December 2, 2002
Page 2
FISCAL IMPACT
Santa Ana's share of the cost is estimated at $12,227. Funds for the
proposed agreement are available in Transportation Systems Improvement
Area E Fund (account no. 34- 631 -6631, project no. 2597).
APPROVED AS TO FUNDS AND ACCOUNTS:
James Ge,Ross Rod R. Coloma
Executive Director Executive Director
Public Works Agency Finance & Mgmt. Services Agency
25.A. Page 44
Q22
SANTA ANA
City Council AGREEMENT WITH UNION PACIFIC RAILROAD COMPANY TO
p� t►►►e Agenda Date PROVIDE SIGNAL INTERCONNECT /PRE- EMPTION BETWEEN THE
RAILROAD CROSSING AND TRAFFIC SIGNAL CONTROLLERS AT
PUBLIC WORKS AGENCY Dec. 2. 2002 I ALTON AVENUE AND GREENVILLE STREET
■e a■
CONSENT CALENDAR
22.F. SPEC. NO. 02 -106 - COMPACT PASSENGER VAN AND HALF -TON
COMPACT TRUCK - FLEET MAINTENANCE - Award a contract to West
Covina Motors, Inc. d /b /a Clippinger Chevrolet Oldsmobile for the
purchase of one compact passenger van and one half -ton compact truck
in the amount not to exceed $45,067.52 - Finance and Management
Services
22.G. SPEC. NO. 02 -110 - SAFETY SUPPLIES - CENTRAL STORES - Award
contracts for safety supplies for a period of one year with options for two
one -year renewals in a total annual aggregate amount not to exceed
$23,077.00 with:
Airgas, Incorporated
Brenton Safety
Calolympic Safety
Equipment Direct
Hagemeyer - Vallen Safety Supply
Hart Healthcare Enterprises Inc.
22.H. SPEC, NO. 02 -111
- PAINT AND
SUPPLIES -
BUILDING
MAINTENANCE - Award
contract for paint
and supplies for
a two -year
period, with provision for two one -year renewals in the annual
amounts as
follows:
Bidder:
Location:
Categories:
Amount:
Vista Paint Corp.
Fullerton
B,C,F
$33,191.00
Pervo Paint Co.
Los Angeles
D
13,286.00
Griffin Ace Hardware
Santa Ana
G
9,352.00
Northtown Company
Huntington Beach A
5,940.00
General Industrial Tool
Sun Valley
E
2,922.00
22.1. SPEC. NO. 02 -114 - MISCELLANEOUS FIRE TRUCK REPAIR - FLEET
SERVICES - Renew the contract with American LaFrance of Los Angeles
for miscellaneous fire truck repair, for a two year period for an annual
amount not to exceed $60,000.00 - Finance and Management Services
PROJECTS - MAINTENANCE. REHABILITATION, IMPROVEMENT,
CONSTRUCTION OR CHANGE ORDERS FOR PUBLIC FACILITIES
23.A. PROJECT NO. 2597 - TRAFFIC SIGNAL INSTALLATION AT ALTON
AVENUE AND GREENVILLE STREET
Motion: 1. Award a contract to F. J. Johnson, the lowest responsible bidder,
in accordance with unit bid prices in the estimated amount of
$138,530.00 for the installation of a new traffic signal at the
intersection of Alton Avenue and Greenville Street
CITY COUNCIL MINUTES 323 SEPTEMBER 3, 2002
CONSENT CALENDAR
2. Approve a Funding Analysis with a total estimated construction
cost of $170,900.00
Motion: Alvarez SECOND: McGuigan
VOTE: AYES: Alvarez, Bist, Franklin, McGuigan, Pulido
Solorio (6)
NOES: None (0)
ABSENT: Christy (1)
23.13. PROJECT NO. 2598 - TRAFFIC SIGNAL INSTALLATION AT WARNER
AND STANDARD AVENUE
Motion: 1. Award a contract to F. J. Johnson, the lowest responsible bidder,
in accordance with unit bid prices in the estimated amount of
$65,789.00 for the traffic modification at the intersection of
Warner and Standard Avenues
2. Approve a Funding Analysis with a total estimated construction
cost of $81,225.00
AGREEMENTS
Motion: Direct the City Attorney to prepare and authorize the City Manager
and Clerk of the Council to execute agreements. (Items 25.A.
through 25.C.)
25.A. AGMT NO. 2002 -164 - ENVIRONMENTAL REMEDIATION AND
TESTING - Execute an agreement with TRC in the amount of $100,000.00
to provide environmental remediation and testing services - Public Works
Agency
25.B. AGMT NO. 2002 -165 - CABLING SERVICES - Execute an amendment to
the agreement with Lomac Information Systems, Inc. for a one -year period
to continue cabling services in an amount not to exceed $400,000.00 -
Finance and Management Services
25.C. AGMT NO. 2002 -166 - INMATE MEDICAL SERVICES - Execute an
agreement with Correctional Managed Care Medical Corporation to
provide on -site inmate medical care for the Santa Ana Jail in a total
amount not to exceed $827,540.00 - Police Department
CITY COUNCIL MINUTES 324 SEPTEMBER 3, 2002