Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PTM GENERAL ENGINEERING SERVICIES INC. (2)
Recording Requested By, And When Recorded Mail To: Clerk of the Council,City of Santa Aria Recorded in Official Records, Orange County 20 Civic Center Plaza,P.O.Box Hugh Nguyen, Clerk-Recorder 1988 Santa Ana, CA 92702 II $ IRI II II III I II I I ll III $ II NO FEE 2016000450411 1:39 pm 09119116 37 414 N12 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOTICE OF COMPLETION '( , NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a l municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana, California, 92701, is the owner of the property hereinafter described, that said owner has caused a construction of TRAFFIC SIGNAL INSTALLATION ON NEWHOPE ST. & CAMILLE ST., o M AND TRAFFIC SIGNAL MODIFICATION ON SEGERSTROM AVE. & BEAR ST. under Cd � x w contract entered into on DECEMBER 1, 2015, with PTM GENERAL ENGINEERING w o SERVICES, INC., on which contract INTERNATIONAL FIDELITY INSURANCE o z COMPANY is surety. The property on which such work improvement was placed is in the City z a of Santa Ana, County of Orange, State of California, and described as Project No. 14-6799 & 14- )-4 • g 6800 located at: NEWHOPE ST. & CAMILLE ST., AND SEGERSTROM AVE. & BEAR ST. i 0 The work improvement on said property was accepted as completed on SEPTEMBER 9, 2016. cA 44 A bYTY OF SANT A,A MUNICIPAL CORPORATION T A` t/p Dated: Principe Civil Engineer-Tyrone Chesanek // TITLE VERIFICATION I, the undersigned, say: I am the City Engineer - Edwin "William" Galvez of the City of Santa Ana, California; I executed the foregoing Notice of Completion acting on behalf of the owner of the property therein described; I make this verification on behalf of said corporation by authorization of the City Council of the City of Santa Ana; I have read said notice and know the contents thereof; and I declare under penalty of perjury that the facts therein stated are true. �� ' 1 1,� Executed on at Santa Ana;California in C-- -11_261-C----e--eic_( -, .. (Signature of individual sweating that the contents of Notice of Completion are true.) THIS NOTICE OF COMPLETION MUST BE RECORDED WITHIN TEN(10)DAYS AFTER COMPLETION REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: DECEMBER 1, 2015 TITLE: AWARD CONTRACT FOR CONSTRUCTION OF NEW TRAFFIC SIGNAL ON NEWHOPE STREET AT CAMILLE STREET AND TRAFFIC SIGNAL MODIFICATION ON SEGERSTROM AVENUE AT BEAR STREET (PROJECTS: 14-6799 & 14-6800) (STRATEGIC PL/AN NO. 6, 1B & 1G) 1 ; ', CITY MANAGE RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED /08- J -J5 �As Recommended OU B ❑ As Amended ❑ Ordinance on I" Reading ❑ Ordinance on 2ntl Reading ❑ Implementing Resolution ❑ Set Public Hearing For CONTINUED TO FILE NUMBER Award a contract to PTM General Engineering Services Inc., the lowest responsible bidder, in accordance with the bid in the amount of $373,973.00 for the construction of a new traffic signal on Newhope Street at Camille Street, and a traffic signal modification on Segerstrom Avenue at Bear Street, subject to nonsubstantive changes approved by the City Manager and City Attorney. 2. Approve the Project Cost Analysis for a total estimated project delivery cost of $504,863.60. Authorize the City Manager to execute change orders in an amount not to exceed the total authorized contingency of $74,794.60. DISCUSSION The recommended actions would support the City's efforts to construct a new traffic signal with protected -permissive left -turn phasing at the school crossing on Newhope Street at Camille Street. Additionally, the traffic signal on Segerstrom Avenue at Bear Street would be modified to provide protected -permissive left -turn phasing for westbound traffic (Exhibit 1). Once completed, these improvements will increase safety and mobility for all users. A Notice Inviting Bids was advertised on September 15 & 16, 2015, and bids were opened on October 6, 2015. The following is a summary of the bid invitations made and the bids received: Contract Award to PTM General Engineering Services Inc. for Traffic Signal Installation and Traffic Signal Modification December 1, 2015 Page 2 Contractor Participation Data Santa Ana contractors receiving notices 1 Contractors requesting bidding documents 16 Bids received 7 Bids received from Santa Ana contractors 0 Bid Results Summary RANK BIDDER'S NAME LOCATION BID 1 PTM General Engineering Services Inc. Riverside $373,973.00 2 Steiny and Company, Inc. Baldwin Park $380,577.50 3 Elecnor Velco Electric, Inc. Chino $382,167.00 4 California Professional Engineering La Puente $419,339.80 5 Crosstown Electrical & Data Inc. Irwindale $429,186.00 6 International Line Builders Riverside $441,213.80 7 Asphlundh Construction Corp. Anaheim $463,811.40 A total of seven bids were received and all were deemed responsive. PTM General Engineering Services Inc. submitted the lowest responsive bid in the amount of $373,973.00, which is 3.55 percent lower than the engineer's estimate of $387,725.00. Therefore, staff recommends award of this contract to PTM General Engineering Services. Inc. STRATEGIC PLAN ALIGNMENT Approval of this item supports the City's efforts to meet Goal #6 Community Facilities & Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City assets), Strategy B (equitably maintain existing streets and associated assets in a state of good repair so they are clean, safe, and aesthetically pleasing for all users), and Strategy G (develop and implement the City's Capital Improvement Program in coordination with the Community Investment Plan (e.g., neighborhood streets, traffic improvements, park facilities, bike master plan, etc.). Contract Award to PTM General Engineering Services Inc. for Traffic Signal Installation and Traffic Signal Modification December 1, 2015 Page 3 ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. 2013-23 and 2013-24 were filed for these projects. FISCAL IMPACT The Project Cost Analysis estimates project expenditures of $504,863.60, which includes the construction contract, construction administration and inspection, and contingencies (Exhibit 2). Funds are budgeted in the Federal Aid Safety Program Fund (Account No. 14717611-66220, Projects 146799 & 146800) and Measure M2 Local Fair Share Fund (Account No. 03217662- 66220, Projects 146799 & 146800) for expenditure in Fiscal Year 2015-16. re Mousavipour Executive Director Public Works Agency FM/EWG/TC/MO Exhibits: 1. Location Map 2. Cost Analysis 3. Construction Contract APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez Executive Director Finance & Management Services Agency THE REGISTER 625 N GRAND AVE, SANTA ANA, CA 92701 Telephone (714) 796-7000 / Fax (714) 796-6059 PROOF OF PUBLICATION (2015.5 C.C.P.) State of California ) County of ORANGE ) ss Notice Type: BID - NOTICE INVITING BIDS Ad Description: Trffc Sgnl At Nwhpe/Camille & Sgnl Mod At Sgrstrm/Bear I am a citizen of the United States and a resident of the Stale of California; I am over the age of eighteen years, and not a party to or Interested in the above entitled matter. I am the principal clerk of the printer and publisher of the THE REGISTER, a newspaper published in the English language in the city of SANTA ANA, county of ORANGE, and adjudged a newspaper of general circulation as defined by the laws of the State of California by the Superior Court of the County of ORANGE, Slate of California, under dale 11/19/1905, Case No. A21046. That the notice, of which the annexed is a printed copy, has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to -wit: 09/15/2015, 09/16/2015 Executed on: 09/16/2015 At SANTA ANA, California I certify (or declare) under penalty of perjury that the foregoing istrue and correct. Signatur This space for tiling stamp only III III II II II II II I I III I II I I II II * A 0 0 0 0 0 3 8 7 1 7 6 3 Recorded in Official Records, Orange County Renee Ramirez, Assistant Clerk -Recorder III'ilili'iliil!! II 11uI1I1 I III III111 III I II NO FEE FILED t$ R 0 0 0 5 7 1 6 5 2 5$ 201385000217 1:38 pm 03/27/13 MAR 2 7 2013 256 82 201 0.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 ORANGE COUNTY CLERK -RECORDER DEPARTMENT BY: __ .DEPUTY City: Santa Ana County: Orange ER Number: ER -2013-23 Project Description: New traffic signal to be installed at Newhope and Camille. Applicant Name: Zdenek Kekula Applicant Address: 20 Civic Center Plaza M-43 SANTA ANA, CA 92702 Name of Public Agency Approving Project: City Council Name of Person or Agency Carrying Out Project: Kekula,. Kdenek POSTED Exempt Status: ❑ Ministerial (Sec. 15268) ❑ Declared Emergency (Sec. 15269 (a)) ❑ Emergency Project (Seo 15269 (b through e)) ❑ General Rode (Sec. 15061(b)(3)/(5)) ❑ Statutory Exemption: [a Categorical Exemption: 15301(b) Reason(s) Why Project is Exempt From CEQA: 15301(b) consistes of repair/maintenance of existing public facilities. MAR 2 7 2013 ORANGE COUNTY CLERK -RECORDER DEPARTMENT BY: `�C_ DEPUTY City Contact: Zdenee�k' Kte/k'ulla/ Telephone: MAYOR Signature: INTERIM CITY MANAGER Miguel A. Pulitlo Date: 2-7 )3 Kevin O'Rourke MAYOR PRO TEM F _ € CITY ATTORNEY Sal Tinejero I-:. Sonia R, Carvalho COUNCIL MEMBERS CLERK OF THE COUNCIL Angelica Amezcua"-' Maria D, Hulzar P. David Benavides Michele Martinez Roman A. Reyna Vincent F. Sermiento CITY OF SANTAANA PLANNING & BUILDING AGENCY 20 Civic Center Plaza (M-20) P.O. BOX 1988. Santa Ana, California 92702 (714) 667-2700 . Fax (714) 973-1461 w ,sama-ana.org NOTICE OF EXEMPTION From the Requirements of the California Environmental Quality Act (CEQA) Fee Exemption per California Government Code Section 6103 To: COUNTY CLERK From: City of Santa Ana County of Orange Planning & Building Agency P.O. Box 238 20 Civic Center Plaza M-20 Santa Ana, CA 92702 Santa Ana, CA 92702 Project Title: New signal at Newhope and Cami Date of Approval: 07/02/2012 Project Number(s): PWA -2013 -330 -CITY Project Location: 1 City Wide (Partial) City: Santa Ana County: Orange ER Number: ER -2013-23 Project Description: New traffic signal to be installed at Newhope and Camille. Applicant Name: Zdenek Kekula Applicant Address: 20 Civic Center Plaza M-43 SANTA ANA, CA 92702 Name of Public Agency Approving Project: City Council Name of Person or Agency Carrying Out Project: Kekula,. Kdenek POSTED Exempt Status: ❑ Ministerial (Sec. 15268) ❑ Declared Emergency (Sec. 15269 (a)) ❑ Emergency Project (Seo 15269 (b through e)) ❑ General Rode (Sec. 15061(b)(3)/(5)) ❑ Statutory Exemption: [a Categorical Exemption: 15301(b) Reason(s) Why Project is Exempt From CEQA: 15301(b) consistes of repair/maintenance of existing public facilities. MAR 2 7 2013 ORANGE COUNTY CLERK -RECORDER DEPARTMENT BY: `�C_ DEPUTY City Contact: Zdenee�k' Kte/k'ulla/ Telephone: (714) 647-5606 Signature: () Title: 119- ^&,'Q&zc�'"�f 0 Date: 2-7 )3 Recorded in Official Records, Orange County Renee Ramirez, Assistant Clerk -Recorder II II IIII III III �IIIII I II NO FEE A$ R 0 0 5 7 1 6 4 9 1$) 201385000216 1:33 pm 03/27(13 266 82 Z01 0.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 ORANGE COUNTY CLERK -RECORDER DEPARTMENT GY: 1�--_ _.DEPUTY INTERIM CITY MANAGER Kevin O'Rourke CITYATTORNEY Sonia R, Carvalho CLERK OF THE COUNCIL. Maria D. Huizar NOTICE OF EXEMPTION From the Requirements of the California Environmental Quality Act (CEQA) Fee Exemption per California Government Code Section 6103 To: COUNTYCLERK From: City of Santa Ana County of Orange Planning & Building Agency P.O. Box 236 20 Civic Center Plaza M-20 Santa Ana, CA 92702 Santa Ana, CA 92702 Project Title: Segerstrom and Bear Signal Mod Date of Approval: 07/02/2012 ProjectNumber(s): PWA -2013 -332 -CITY Project Location: 1 Citywide (Partial) City: Santa Ana County: Orange Project Description: Segerstrom and Bear Signal Modification. Applicant Name: Zdenek Kekula Applicant Address: 20 Civic Center Plaza M-43 SANTAANA, CA 92702 Name of Public Agency Approving Project: City Council Name of Person or Agency Carrying Out Project: Kekula, Zdenek Exempt Status ❑ Ministerial (Sec. 15268) ❑ Declared Emergency (Sec. 15269 (a)) ❑ Emergency Project (Sec. 15269 (b through e)) ❑ General Rule (Sec. 15061(b)(3)/(5)) ❑ Statutory Exemption: 0 Categorical Exemption: 15301(b) Reason(s)Why Project is Exempt From CEQA: 15301 (b) consists of repair/maintenance of existing public facilities. ER Number: ER -2013-24 ORANGE COUNTY CLERK -RECORDER DEPARTMENT [SY:'L-_ DEPUTY City Contact: Zdenek Kekula Y/., ` �) Telephone: (714) 647-5606 Signature: Z. � _ OQ_ Title: .%`2f1 � C.J in w�mt' Data: c� � EXHIBIT 18 MAYOR Miguel A. Pulido MAYOR PRO TEM � 0 Sal Tloajem COUNCILMEMSERS Angelica Amezcua= P. Uavid Benavides Michele Martinez Roman A. Rayne Vincent F. Sarmiento CITY OF SANTAANA PLANNING & BUILDING AGENCY 20 Clvlc Center Plaza (MI P.O. BOX 1988 -Santa Ana, California 92702 (714) 667-2700 • Fax (714) 973-1461 w .santa-ana.crg ORANGE COUNTY CLERK -RECORDER DEPARTMENT GY: 1�--_ _.DEPUTY INTERIM CITY MANAGER Kevin O'Rourke CITYATTORNEY Sonia R, Carvalho CLERK OF THE COUNCIL. Maria D. Huizar NOTICE OF EXEMPTION From the Requirements of the California Environmental Quality Act (CEQA) Fee Exemption per California Government Code Section 6103 To: COUNTYCLERK From: City of Santa Ana County of Orange Planning & Building Agency P.O. Box 236 20 Civic Center Plaza M-20 Santa Ana, CA 92702 Santa Ana, CA 92702 Project Title: Segerstrom and Bear Signal Mod Date of Approval: 07/02/2012 ProjectNumber(s): PWA -2013 -332 -CITY Project Location: 1 Citywide (Partial) City: Santa Ana County: Orange Project Description: Segerstrom and Bear Signal Modification. Applicant Name: Zdenek Kekula Applicant Address: 20 Civic Center Plaza M-43 SANTAANA, CA 92702 Name of Public Agency Approving Project: City Council Name of Person or Agency Carrying Out Project: Kekula, Zdenek Exempt Status ❑ Ministerial (Sec. 15268) ❑ Declared Emergency (Sec. 15269 (a)) ❑ Emergency Project (Sec. 15269 (b through e)) ❑ General Rule (Sec. 15061(b)(3)/(5)) ❑ Statutory Exemption: 0 Categorical Exemption: 15301(b) Reason(s)Why Project is Exempt From CEQA: 15301 (b) consists of repair/maintenance of existing public facilities. ER Number: ER -2013-24 ORANGE COUNTY CLERK -RECORDER DEPARTMENT [SY:'L-_ DEPUTY City Contact: Zdenek Kekula Y/., ` �) Telephone: (714) 647-5606 Signature: Z. � _ OQ_ Title: .%`2f1 � C.J in w�mt' Data: c� � EXHIBIT 18 CITY OF SANTA ANA Construction Contract PROJECT NO. 14.6799 & 14-6800 TRAFFIC SIGNAL INSTALLATION ON NEWWOPE STREET AT CAMILLE STREET AND MODIFICATION ON SEGERSTROM AVENUE AT BEAR STREET This CONSTRUCTION CONTRACT is made and entered into this 13day of December, 2015, by and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California, hereinafter referred to as "CITY" and PTM General Engineering Services Inc., hereinafter referred to as "CONTRACTOR". WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: 1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the Traffic Signal Installation on Newhope Street at Camille Street & Traffic Signal Modification on Segerstrom Avenue at Bear Street, hereinafter referred to as the "Work of Improvement", identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2, The complete Construction Contract consists of the "Contract Documents," as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Project Plans • Required Contract Provisions Federal -Aid Constriction Contracts (Form FHWA 1273) • Davis -Bacon Act and Wages • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the Work of Improvement the stun total amount not to exceed $373,973.00, as set forth and identified in the BID PROPOSAL, which is attached hereto acrd incorporated b,erein as Exhibit "A". The BID PROPOSAL contains a schedule of unit price(s) or lump Stan(s) based on approximate quantities only, and the City does not expressly or by implication Page 1 of 3 CITY OF SANTA ANA Construction Contract PROJECT NO. 14.6799 & 14-6800 TRAFFIC SIGNAL INSTALLATION ON NEWHOPE STREET AT CAMILLE STREET AND MODIFICATION ON SEGERSTROM AVENUE AT BEAR STREET agree that the actual amotmt of work will correspond therewith, but reserves the right to increase or decrease the amoLmt of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. 4. CONTRACTOR agrees to complete the Work of Improvement within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including cornnencing construction within the timeframe therein specified after issuance of a Notice to Proceed. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the Work of Improvement a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the, wage determinations for this work in accordance with applicable State and Federal law. 6. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials Attnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY, CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond equal to at least ten (1.0%) percent of the final Contract price or $1.,000, whichever is greater (Warranty Bond). CONTRACTOR shall, upon project completion as a condition of project acceptance, furnish a Warranty Payment and Performance bond to be approved by the CITY, in the amount of Twenty -Five Percent (25%) of the Contract ,price, to warrant the work done under said Contract Agreement against material or quality defects for a period of one year after acceptance by the AGENCY, S. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability hxsurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. // Page 2 of 3 CITY OF SANTA ANA Construction Contract PROJECT NO. 14-6799 & 14-6800 TRAFFIC SIGNAL INSTALLATION ON NEWNOPE STREET AT CAMILLE STREET AND MODIFICATION ON SEGERSTROM AVENUE AT BEAR STREET IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: '4 MARIA D. HUIZ,AR � Clerk of the Council APPROVED AS TO FORM: SONIA R. CARVALHO City Attorney By� q e�Sar'ido�i- ,vhl 6C hief Assist,4 City Attorney N'I'A Al DA CAVAZOS City Manager RECOMMENDED FOR APPROVAL: CONTRACTOR: PTM Generat Engineering Services Ir- By:_(, __ _ Title: Blizal�A14 Nle -d— deMel"' PRE5IDENT/GF0 Page 3 of 3 CITY OF SANTA ANA INSTRUCTIONS TO BIDDERS PROJECT NO. 14.67991 Now Traffic Signal on Newhope St and Camille St PROJECT NO. 14.6800: Traffic Signal Modification on Segerstrom Ave and Bear St Bidder's Certificate of Compliance Regarding "Buy America Requirements for Steel or Manufactured Products CITY OF SANTA ANA PROPOSAL PROJECT NO. 14 6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 14-6800: Trafflr. Signal Modification on Segerstrom Ave and Bear St TO: CITY COUNCIL, OF THE CITY OF SANTA ANA FROM: PTM General Engineering Services, Inc. REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Proieot # 14-6799 Item Description Qty Unit Unit Price Amount 1 Traffic Signal Installation on Newhope St & 1 LS $ $ Camille St 9g0W C,S� 2 GTT Emergency Vehicle Preemption System 1 _LS Per Plant�r'_� 3 Install 2" PVC Conduit Per Plan 400 LF $ $ `�f a ?ZOO 4 Install 3" PVC Conduit Per Plan 50 LF $ $ 5 Install 4" PVC Conduit Per Plan 300 LF $ $ iQS oo 6 Install No. 6 pull Box 10 EA $ $ &o 7 Install Large Pull Bax (N40 with N407 Ud) 1 EA $ $ -Box 1?0 8 Install Edison Pull -I EA $ $ 9 Install Traffic Signal Loop Detector 14 EA $ $ (Type D Loop) `37 cli 5/80 10 Install Bicycle Loop Detector 6 EA $ $ (Type E Loop) 7_70 Q G `Z, 0 11 install Bicycle Loop Detector 2 EA $ $ (Type QLoop) 7 °0 rt %4/0 12 Construct 4" PCC Sidewalk 150 SF $ $ BP- i CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhope St and Camille st PROJECT NO, 14-68M Traffic Signal Modification on Segerstrom Ave and Bear St Item Description qty Unit Unit Price Amount 13 Construct PCC Curb & Gutter (Type A-2-8) 100 LF $ $ '119� ZJ-7S®( 14 Construct PCC Curb Ramp 750 SF $ $ /8 1 -000 15 AC Pavement 2 TN $ $ //Z Z Z.�lao 16 Install 24 Strand Singlemode Fiber Optic 300 LF $ $ Cable -zro q o 970 17 Fusion Splice 1 Strand of Singlemode Fiber 48 EA $ $ Optic 147 Z ®1 G 18 Install Fiber Optic Splice Enclosure 2 EA $ $ 0/S V' --S<) 19 Install CCTV and Ethernet Communication 1 LS $ $ Systems '5f,1WC) —3® o0o 2C Sandblasting/G rind Ing Conflicting Striping, 1,000 LF $ $ Then Apply Slurry Seal -11,75 Z/750 21 Sandblasting/Grinding Legends/Symbols, 30 EA $ $ Then Apply Slurry Seal 11-7— ., —Z> 6 0 22 Install White Lane Line Per City Standard 50 LF $ $ Plan f.7 sd 23 Install Double Yellow per City Standard Plan 50 LF $ $ L-5 24 Install 12" Solid White/Yellow Line (Thermo) 31.0 LF $ $ 25 Install Red Curb 50 LF $ $ 7,c /000 26 Remove Existing Sign(s) and Post 4 EA $ $ 27 Install New Sign(s) and Post 1 EA $ $ 2-40 �f"� 28 Pothole for Utilities Not Shown an Plans 15 EA $ $ !00 1 0 29 Pothole for Traffic Signal Equipment 10 EA $ $ Locations '_ 30 Unclassified Excavation 50 CY $ $ r400e� Project No.: 14-6799, SUBTOTAL .............. $ 1 ''@o r BP -2 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 146800: Trafflc Signal Modification on Segerstrom Ave and Bear St Prolect# 14-6804 Item Description city Unit Unit Price Amount 31 Traffic Signal Modification on Segerstrom 1 LS $ $ Ave &Bear St 16,66 1®Ci,�57 32 GTT Emergency Vehicle Preemption System 1 LS $ $ Per Plan 33 Install 2" PVC Conduit Per Plan 140 LF $ $ "z4 34 Install 3" PVC Conduit Per Plan 225 LF $ $ 13{1" 35 Install 4" PVC Conduit Per Plan 175 LF $ $ 36 Install No, 6 Pull Box 10 EA $ $ /o/ y// 00 37 Install Traffic Signal Loop Detector 11 EA $ $ (Type D Loop) C C1 7 38 Install Bicycle Loop Detector 8 EA $ $ (Type E Loop) G'7 d `z.•- i So 39 Construct 4" PCC Pad 20 SF $ $ 40 Construct PCC Curb & Gutter (Type A-2-8) 5o LF $ 41 Construct PCC Curb Ramp 250 SP $ $ Iq 500 42 AC Pavement 2 TN $ $ 43 Install 6-PaIrAWG#22lnterconnectCable 250 LF $ $ .S (y 3..r� 7� 44 Install Twisted -Pair Splice Closure and Splice 1 EA $ $ Twisted -Pair "Z S 45 Relocate Existing Ethernet Antennas 1 LS $ $ Z �e ri rCJ( 46 Remove Existing Sign(s) and Post 1 EA $ $ I -Z� 25 I` 47 Install New Signis) and Post 2 EA $ $ 48 Pothole for Utilities Not Shown on Plans 7 EA $ j $ 49 Pothole for Traffic Signal Equipment 5 EA$p $ Locations C 005 5 0 ci BP -3 Hca CITY OF SANTA ANA PROPOSAL PROJECT N0. 14-6799: Now Traffic Signal on Newhope St and Camille St PROJECT NO, 146800: Traffic Signal Modification on Segerstrom Ave and Bear St Item Description Qty it Unit Price Amount 50 Unclassified Excavation 10 Cy $ $ /0(0 Project No,: 14-6800, SUBTOTAL .............. $ r�JW'E ( 7 2 - Total Base Bid For Project: 14-6799 & Project The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the rightto increase or decrease the quantity of this item accordingly. t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within eighty (80) working days after the commencement date stated in the Notice to Proceed. The bidder also proposes to commence construction of the Work within ten (10) days after issuance of a Notice to Proceed, and to continue In a diligent and workman -like manner without interruption, and to complete the construction thereof within the time specified above. The liquidated damages amount in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $1,000 per calendar day. Name of Firm PTM Gen9LciLErering Services, Inc. Signature of BIDDER Title Elizabeth H. Mendoza de McRae, President/CFO (if an individual, so state) BP -4 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799t New Traffic Signal on Newhope St and Camille St PROJECT NO. 14-6800: Traffic Signal Modification on Segerstrom Ave and Bear St BIDDER'S STATEMENT BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent Construction Contract Agreement shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto. BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish AGENCY all required bonds and certificate of liability insurance within ten (10) business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned. BIDDER understands that a bid Is required for the entire work, the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. The BIDDER also certifies that the bid is a balanced bid. In accordance with Section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing is true and correct. Name of Firm Signature of BIC Title Elizabeth H. Mendoza de McRae, President/CFO (if an individual, so state) (If a firm or copartnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) PTM General Engineering Services, Inc. Elizabeth H. Mendoza de McRae, President/CFO Brian Mendoza, Vice President/Secretary Iff am CITY OF SANTA ANA PROPOSAL PROJECT NO. 14.6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 14-6809: Traffic Signal Modiflcatlon on Segerstrom Ave and Bear St CONTRACTOR'S LICENSING and REGISTRATION STATEMENT The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and all his/her subcontractors are registered with the State of California Department of Industrial Relations (DIR), and that the following is true and correct. Contractor's Name: PTM General Engineering Services, Inc. Business Address: 5942 Acorn St. Riverside CA 92504 Business E -Mail Address: elizabeth@ptm-eng.com; brion@ptm-eng.com Telephone: 951.710.1000 State Contractor's License No. and Class: 891265 Class A; License Expiration Date: 02.28.2017 State Dept, of Industrial Relations (DIR) 000001433 Registration No.: State Dept. of Ind Registration �xoir`t Signed: I Relations (DIR) 06.30.2016 Title: Elizabeth H. Mendoza de McRae, President/CFO BP -6 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 14-6800: Traffic Signal Modification on Sagarstrom Ave and Bear St PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as California Code of Regulations, Title 8, Section 16,000, at seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement, Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. The undersigned certifies that the foregoing is true and correct. Name of Firm PTM General Engineering Services, Inc. Signature of BIDDER Title Elizabeth H. Mendoza de McRae, President/CFO (if an individual, so state) BP -7 CITY OF SANTA ANA PROPOSAL PROJECT N0. 14-6799; New Traffic Signal on Newhope St and Camille St PROJECT NO. 146800: Traffic Signal Modification on Segerstrom Ave and gear St OWNERSHIP AFFIDAVIT STATE OF CALIFORNIA COUNTY OF ORANGE jSS: CITY OF SANTA ANA ) Elizabeth H. Mendoza de McRae, , being duly sworn, deposes and says: ❑INDIVIDUAL That he/she is the party making the foregoing proposal: El PARTNERSHIP That he/she Is a member of the co -partnership firm designated as: and who has been and Is duly vested with the authority to make and execute instruments for the co -partnership by: who constitute the other members of the co -partnership. sh ®CORPORATION That hes of: President/CFO of PTM General Engineering Services Inc a corporation which Is making the foregoing proposal: ❑JOINTVENTURE That he is of: one of the parties making the foregoing proposal as a joint venture, and the he/she has been and Is duly vested with the authority to execute instruments for an on behalf of the parties making said bid who are: that s e a bid is genuine and not collusive or sham, and has not in any manner sought by collusl to secure any advantage against the City of Santa Ana or any person interested In the P r ontract, for himself or any other person. Elizabeth H. Mendoza de McRae President/CFO Signature of Bidder Subscribed and sworn to before me this day of 20 _ Signature of officer Administering Oath (Notary Public) 13r -s CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 . ..... a,.'.. '�.y., a n. v a .a a, ..a.. a. Ha, a, a ... a,. -n 'n .. a. • a. .'n a ^. A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of ORANGE ) On Zo '09' ZOIS before me, PHILIP VEGA, NOTARY PUBLIC Date Here Insert Name and Title of the Officer personally appeared ELIZABETH H. MENDOZA de McRAE Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within ins hand acknowledged to me that he/she/they executed the same in his/her/their s p�E es,, nd that by his/her/their signature(s) on the instrument the person(s), or th on p�mvP ,tA person(s) acted, executed the instrument. NO�AFIY PUBLIC CALIF N ' LOS ANGELESCOUN'1Y I certify under PENALTY OF PERJURY under the laws My 31.201 s of the State of California that the foregoing paragraph is true and correct, WITNESS my hq*,&r d off>al seal. Signature of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: c�•�'Sx.���'c�"�,G�R94-FJ'ow�G+,�'--�C.�r*ureffe.15"�u'a5r����1�'��e�;e?5' y��' �c^�a'�:8�' �.4^,z' ©2014 National Notary Association ' www.NationalNotary.org ' 1 -800 -US NOTARY (1-800-876-6827) Item #5907 1, •. x. x : i PROPOSAL PROJECT NO. 14-6799; New Traffic Signal on New hope St and Camille 5t PROJECT NO. 14-6800: Traffic Signal Modiflcatl on on Sege rstrom Ave and Gear St KNOW ALL PRESENT that, PTM GENERAL ENGINEERING SERVICES, INC. as BIDDER, and INTERNATIONAL FIDELITY INSURANCE COMPANY as SURETY, are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of TEN PERCENT OF AMOUNT BID Dollars ($ 10% ), which is ten percent (10%) of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and vold, otherwise it shall remain in full force and effect in favor of AGENCY. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this 5TH day of OCTOBER2015, BIDDER" PTM GE NGINEERING SERVICES, INC. 5942 ACORN ST. RIVERSIDE, CA 92504 1-710-1000 SURETY" INTER; 10 AL FIDELITY INSURANCE COMPANY 2400 E. KATELLA AVE #250 ANAHEIM, CA 92806 UM sworn to before me '20—. Signature: Notary Public in and for the County of , State of this day of *Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address, and telephone number of authorized representative. 6 ,uu„ugr "Y c a, �ssiop JPTAHY ��•• a, auuuc NUKn behalf in the a ents of any of any When of the .d and July. 4LTY rere._ .. .. CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of ORANGE ) On CS6 6, !) before me, PHILIP VEGA, NOTARY PUBLIC Date Here Insert Name and Title of the Officer personally appeared ELIZABETH H. MENDOZA de McRAE Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/Their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. PHILIP VF_GA ccMn q 19770lla o o NOTARY PUBLIC CALIFORNIA ' LOSANGELES COUNTY My Comm. Expires MAY 91,2016 Place Notary Seal Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hoed and off'ipial seal. Signature Signature of Notary Public OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Signer(s) Document Date: Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 02014 National Notary Association • www.NationalNotary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5907 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 T A notary public or other officer completing this certificate verifies only the Identity of the Individual who signed the document to which this certificate Is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Los Angeles ) On OCT 0 5 2015 before me, Monica Blaisdell, Notary Public Date Here Insert Name and Title of the Officer personally appeared Philip E. Vega Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(w whose name%) Were subscribed to the within Instrument and acknowledged to me that he/XP(WAW executed the same In his/ yVtkWjt authorized capacityM and that by his/1xwftw signature(g) on the Instrument the personO, or the entity upon behalf of which the person(o acted, executed the Instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph Mowca BtAl6CELL is true and correct. Commission # 1878845 i Notarypublic Courtly California g WITNESS my hand and official seal. i ��?ya •' Orange M Comm. Expires Mai 26, 2816 Signature V V'Ii�l�Ii��IJ i��✓V f—� Signature of Notary Public CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT N0, 14-6800: Traffic Signal Modification on Segerstrom Ave and Bear St LIST OF SUB -CONTRACTORS Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount: o Streets, highways including bridge projects: Y2% of the bid or $10,000, whichever Is greater o Buildings, parks, or other projects: Yn%of the bid Section 17255 of the Public Contract Code requires all Subcontractors be registered with the State Department of Industrial Relations (DIR). BIDDER proposes to subcontract certain portions of the work to the firms listed below: Name License #/Exp. (p 'Zo/ CT&T Concrete Paving Inc. a 324 S. Diamond Bar Blvd. PMB 275, Diamond Bar, CA 91765 License No: 875627 Exp: 4,30.16 Class C12, C8 Tel: 909.396.8453 Fax: 909.396,0522 Dir. 1000025154p0(L�1r71✓ Amount $ 3zl i (90 Name License #/Exp. Cts `2.0 nip Q}. RIC— Din 1000003794 Traffic Loops CrackfiIII ng Inc. 946 S. Emerald St, Anaheim, CA 92804 License No: 652956 Exp: 8.31,16 Class: C10, C32 Tel: 714.520.4026 Fax: 714.520.4027 Type Of Work poo-ro4 o r- c otvws Amount $ 1 2 0 c :- Name License #/Exp. °Zty Dir: 100001560/ Prime Performance Contractors 2711 Ridgel'me Dr #105, Corona, CA 92882 License No: 979710 Exp: 12.31.16 Class: A Te1h 714.362.1359 Fax: 951.454.4369 Name License #/Exp. / Zto1 Cha VII. 1VVVVVViJJ D Crosstown Electrical & Data Inc b 5463 Diaz St, Irwindale, CA 91706 p License No: 756309 Exp: 11-30 16 Class: C10 Tel: 626.813.6693 Fax: 6C2�6.813.6604 Amount $ -,Is `7 Cie =1177 License #/Exp. {a/,Z 0 ((o ["biir: lODUu(Ttisr � t PCI P.O. box 16118, Long Beach, CA 90806 I License No: 823802 Exp: 9.30.15 class C32, D42 F Tel: 562.218.0504 Fax: 562.218.0634 Type Of Work �orcY/esCf C5 i'�LtpPftil Amount $ Name License #/Exp, DIR Reg. #/Exp. License # Location Phone Type Of Work or- Q„s v e [ Type Of Work Amount$ - 'e� 3CC) 0 s G. Amount$ PTM Germs Bering Services, Inc. Elizabeth H. Mendoza de McRae, President/CFO Signature of -BI de BP -10 CITY OF SANTA ANA PROPOSAL PROJECT NO, 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT NO, 14,68M Tieffir, Signal Mo4ificatlon on Segerstrom Ave and Bear St REFERENCES The following are the names, addresses, and telephone numbers for THREE public agencies for which BIDDER has performed similar work within the past three years, 1. City of Garden Grove 11222 Acacia Parkway Garden Grove, CA 92840 Name and Address of Owner. Mr, Dai C. Vu 714.741.5186 Name and Telephone Number of person familiar with project. 575,798.00 T/S Install & Mod at Various Locations Dec. 2013 Contract Amount Type of Work Date Completed 2. City of Irvine Once Civic Center Drive Irvine, CA 92623 Name and Address of owner. Mr. Darrell Hartman 949.724.6000 Name and Telephone Number of person familiar with project, 424023.00 N/B On-ramp Traffic Signals Imp, June 2015 Contract Amount Type of Work Date Completed 3 City of Lawndale 14717 Burin Ave. Lawndole, CA 90260 Name and Address of owner. Mr. Miguel Alvarez 310.973.3265 Name and Telephone Number of person familiar with project. 160990.00 T/S Modification June 2014 Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER Intends to procure Insurance and bonds. Commercial Insurance: McRae & Associates 1290 N. Hancock Ave. #210 Anaheim, CA 92806 714.779.6999 Mr. Patrick McRae 714.779.6999 Bonding Agent: Contractors & Developers Bonding 534 E, Badillo St. Covina, CA 91723 Mr. Philip Vega 626.859.1000 Surety: International Fidelity Insurance Company 233 Wilshire Blvd. #820 Santa Monica, CA 90401 S CITY OF SANTA ANA PROPOSAL PROJECT N0, 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 14.6600: Traffic Signal Modification on Segerstram Ave and Bear St ADDITIONAL REFERENCES The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER or Subcontractor has performed traffic signal installation and/or modification in the past 5 years. 1, City of Newport Beach 3300 Newport Blvd. Newport Beach, CA 92658 Name and Address of Owner. Mr, Brad Sommers 949.644.3326 Name and Telephone Number of person familiar with project. 547050.00 T/S Rehabilitation Nov 2012 Contract Amount Type of Work Date Completed 2, City of Rancho Cucamonga 10500 Civic Center Dr. Rancho Cucamonga, Ca 91730 Name and Address of owner. Mr. Craig Cuz 909.477.2740 Name and Telephone Number of person familiar with project. 809503,00 T/S Install Sept. 2013 Contract Amount Type of Work Date Completed 3 City of Rosemead 8838 E. Valley Blvd. Ca 91770 Name and Address of owner. Mr. Rafael Fajardo 626.569.2100 Name and Telephone Number of person familiar with project. 655045.00 Safe Routes to School Jan 2013 Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds. Commercial Insurance: McRae & Associates 1290 N. Hancock Ave. #210 Anaheim, Ca 92806 Mr. Patrick McRae 714.779.6999 Bonding Agent: Contractors & Developers Bonding 534 E. Badillo St. Covina, CA 91723 Mr. Phil Vega 626.859.1000 Surety: International Fidelity Insurance Company 233 Wilshire Blvd. #82-0 Santa Monica, CA 90401 More references attached. BP -12 PTM Job No: P13-01 Owner Job No.: C2-0151 Job Location: Ramon Road and Monterey Avenue/Sierra Del Sol Description of Work: Traffic Signal and Lighting Project, Thousand Palm Area Owner: County of Riverside Contact: Mr, Joel Jimenez Address: 352514th Street City/5tate: Riverside, CA 92501 Telephone: (951) 955-6780 Fax No.: (951) 955-3464 Contract Date: April/2013 Completed Date: December/2013 Contract Value: $244,021.60 FTMJnb No: P13-02 OwnerJnb No.:41053 Job Location: Redlands, Cope and McKinley Description of Work: Pedestrian Safety Improvements, Owner: City of Redlands Contact: Mr. Jason Montgomery Address: 35 Cajon St, Suite 4 Citg/5tate: Redlands, CA 92373 Telephone: (909)798-7584 Fax No.: () Contract Date: April/2013 Completed Date: 0cto1ber/2o i 3 Contract Value: $39,760.00 FTM Job No: P13-03 Owner Job No.: Contract No. 12A1475 Job Location: Bolsa Chica State Road Description of Work: Upgrade Traffic Signals and Related Electrical Components Owner. Department of Transportation Contact: Mr. Address: 1727 30th Street City/State: Sacramento, CA 95186 Telephone: (916)227-6000 Fax No.: (9:1.6)227-67.55 Contract Date: Fe6ruiryV70I3 Completed Date: Contract Value: $134,884.00 PTM Job No: P13-04 Owner Jab No. : Job Location: City of Inglewood, Crenshaw Blvd. & 104°h St. Description of Work: Traffic Signal Modification Project Owner: City of Inglewood Contact: Mr. Alan Ma Address: One Manchester Blvd, City/5tate: Inglewood, CA 90301 Telephone: (310)412-5333Fax No.: (310)412-5552 Contract Date: April/2013 Completed Date: ContractValue: $1.64,030.00 PTM Job No: P13 -O5 OwnerJo6 No.: 7125 Job Location: Garden Grove, Various Locations Description of Work: Traffic Signal Installation and Modifications at Various Locations, Owner: City of Garden Grove Contact: Mr. Mr. Dai C. Vu Address: 11222 Acacia Parkway City/5tate: Garden Grove, CA 92840 Telephone: (714)741-5186 Fax No.: () Contract Date: March/7013 Completed Date: Decem6er/70I 3 Contract Value: $575,798.00 PTM Job No: P13-06 Owner Job No.: 418-73371 Jo6 Location: Monroe Street & Orange Description of Work: Intersection Reconfiguration, Federal Project Id, HSIPL-5070(025) Owner: City of Pomona Contact: Mr. Ali Eskandari Address: 505 South Garey Ave City/5tate: Pomona, CA 91769 Telephone:(909)620-2261 Fax No.: (909)620-2278 Contract Date: May/2015 Completed Date: Decem6er/7o13 Contract Value: $122,392.00 PTM Job No: P13-07 Owner Job No.: 61095 Job Location: Rose Dr. & Yorha Linda Blvd. Description of Work: Intersection Improvement Project Owner: City of Placentia Contact: Mr. Michael McConaha Address:401 E. Chapman City/5tate: Placentia, CA 92870 Telephone: (714)993-8117 Fax No.: Contract Date: April/2o I3 Completed Date: Decem6e:/70I 3 Contract Value: $124,533.43 PTM Jeb No: P13-08 Owner Job No.: CS -0192 Job Location: City of Vernon, Citywide Description of Work: Pedestrian Countdown Head Replacement Project Owner: City of Vernon Contact: Mr. Samuel Wilson Address: 4305 Santa Fe Avenue City/5tate: Vernon, CA 90058 telephone: (323) 583-8811 Fax No.: (323)826-1435 Contract Date: May/2o13 Completed Date: Contract Value: $84,117.00 PTM Job No: P13-09 Owner Jo6 No. 12-6760; Federal Project No, HSIPL-5063(141) Jo6 Location: City of Santa Ana, Mcfadden at Lyon Description of Work: Traffic Signal Modification, Federal Project No. HSIPL-5063(141) Owner. City of Santa Ana Contact; Mr. Edward Torres Address: 20 Civic Center Plaza CitV5tate: Senta Ana, CA 92701 Telephone: (714)647-5680 Fax No.: Contract Date: May/2013 Completed Date: Contract Value: $285,420.00 PTM Jnb No: P13-10 Owner Jab No. CIP 5548 Jo6 Location: City of Hemet, Various Locations Description of Work: Safe Routes To School Project Owner: City of Hemet Contact: Address:945 East: Florida Avenue Citt4/5tate: Hemet, CA 92543 Telep6ne:(951)765-2348 Fax No.: (951)765-2349 Contract Date: Completed Date: Contract Value: PTMJo6 No: P13-11 OwnerJo6 No. Job Location: Mead Valley Area, Cajalco Road and Alexander Street Description of Work: Traffic Signal and Lighting Project Owner: County of K.iverside City of Contact: Mr. Joel Jimenez Address: 3525 14°I' 5t. Cit5/5tate: Riverside, CA 925001 Telephone: (951) 955-6780 Fax No.: (951) 955-3464 Contract Date: Julij/2o14 Completed Date: Contract Value: $334,886.00 PTM Jo6 No: P13-12 Owner Jo6 No. : Jo6 Location: City of Inglewood, Crenshaw Boulevard Description of Work: LED Pilot Project Owner, City of Inglewood Contact: Mr. Alan Mai Address: One Manchester Blvd. Cit9/5tate:Inglewood, CA 90301 Telephone: (310)412-5333Fax No.: (31.0)412-5552 Contract Date: Completed Date: Contract Value: $44,460.00 PTM Job No: P13-13 owner Job No.: ESPL 5358 Job Location: Hellman/San Gabriel Description of Work: Intersection Improvement Projects Owner. City of Rosemead Contact: Mr. Rafael Fajardo Address: 8838 E. Valley Blvd. City/5tate: Rosemead, CA 91770 Telephone: (626)569-2100 Fax No.: Contract Date: May/201) Completed Date: December/2013 Contract Value: $482,024.30 FTM Job No, P33-14 ownerJob No.: Contract No. 07A3421 Job Location: Description of Work: Owner.. Department of Transportation Contact: Mr. Address: 1727 30th Street City/5tate: Sacramento, CA 95186 Telephone: (916)227-6000 Fax No.: (916)227-6155 Contract Date: June/2015 Completed Date: Contract Value: $203,131.00 FTM Job nlo: P13-15 owner Job No.: Contract No. 07A3409 Jo6 Location: Description of Work: Minor (B) Contract No. 07A3409 Owner. Department of Transportation Contact: Address: 1727 301h Street CitV5tate: Sacramento, CA 95186 Telephone: (916)227-6000 Fax No.: (916)227-6155 Contract Date: June/2019 Completed Date: Contract Value: $26,000.00 FTM Job No: P13-16 owner Jo6 No.: Federal Project No. FISIPL-5360(012) Jn6 Location: City of Lawndale, Manhattan Beach & Firmona Avenue Description of Work: Traffic Signal Modification, Federal Project No. HSIPL-5360(012) Owner City of Lawndale Contact: Mr. Miguel Alvarez Address; 14717 Burin Avenue Ciqt/State: Lawndale, CA 90260 Telephone: (310)973-3265 Fax No.: (310)644-4556 Contract Date: June/2013 Completed Date: Contract Value: $l%990,00 FTM Job No: P13-17 Owner Jos Nlo. : Job Location: City of Duarte, Huntington Drive at Pops Road Description of Work: Traffic Signal and Intersection Improvements Project Owner: City of Duarte Contact: Mr. Rafael Casilles ,address: 1600 Huntington Drive City/jtate: Duarte, CA 91010 Telephone: (626)357-7931 Fax No.: (626)358-0018 Contract Date: June/2013 Completed Date: Contract Value: $313,677.00 FTMJos No: P13-18 OwnerJos No.: 13-365, CIP N0.8430 Jos Location: City of Murrieta, Intersection of Nutmeg Street and St. Ralph Drive Description of Work: Rectangular Flashing Beacon (BRFB) Installation Owner. City of Murrieta Contact: Mr. Rosert K. Moehling P.E. Address: I Town 59uare C&V5tate: Murrieta, CA 92562 Telephone: (951)461-6067 Fax Nlo- ContractDate: August/2013 Completed Date: Contract Value: $ FTM Job No: P13-19 Owner Jos No : Jos Location: City of Mead Valley, Turnkey Eastvale Gateway & Mead Valley Description of Work: Bus Shelter Project Owner: Riverside Transit Agency Contact: Mr, Address: 1 825 Third Street CitV51;ate: Riverside, CA 92517 Telephone: (951)565-5000 Fax No.: (951)565-5001 Contract Data: June/2013 Completed Date: Contract Value: $66,456.00 FTM Jnb No: P13-20 Owner Jos No.: 7191 Job Location: Rosecrans Avenue at Crossdale Avenue Description of Work: Pedestrian Crossing Improvements Owner: City of Norwalk Contract: Ms. Julia Jimenez Address: 12700 Norwalk Blvd. CitV5tate: Norwalk, CA 90651 Telephone: (562)929-5700 Fax No.: (562)929-5773 Contract Date: July/z013 Completed Date: Decemser/zoI Contract Value: $.40,548.00 FTM Job No: P13-21 Owner Job No.: 61114 Job Location: Monroe Street & Orange Description of Work: Safe Routes to School Owner. City of Placentia Contact: Mr. Michael McConaha Address: 401 E. Chapman Ave. CitV5tate: Placentia, CA 92870 Telephone:(714)993-8171 Fax No.: Contract Date: JuIV2015 Completed Date: Decem6er/2013 Contract value: $97,699.00 FTM Job No: P13-22 Owner Job No.: ST -316 Jo6 Location: City of La Palma, along Walker Street from Crescent Avenue to La Palma Avenue and Crescent Avenue from Moody Street to Walker Street Description of Work: Walker Junior High School Pedestrian Safety Improvements Project Owner. City of La Falma Contact: Ms. Michelle Rusu Andres- 78Z2 Walker Street Citt/5tate: La Palma, CA 90623 Telephone: (714)690-3300 Fax No.: (714)523-2141 Contract Date: 5eptcMkcV201 5 Completed Date: Contract value: $110,707.00 FTM Jo6 No: P13-24 OwnerJob No.: 12-14, Federal Project No. HSIP3-5312 (084) Jo6 Location: City of Costa Mesa, Victoria Street and Valley Road/Pacific Avenue Description of Work: hltersection Improvements Owner: Citi of Costa Mesa Contact: Address: 7822 WAer51reet CitV5tate: Costa Mesa, CA Telephone: (714)754-5335 Fax No.: (714)754-5264 Contract Date: July/2015 Completed Date: Contract Value: $512,056.500 FTM Job Nn: P13-26 Owner Jo6 No.:8010040 70 77 Jo6 Location: City of Moreno Valley, Citywide Description of Work: Fiscal Year 2011/2012 Citywide Pedestrian Enhancements Owner: City of Moreno Valley Contact: Mr. Cu9 Fegan Address: 14 177 r-clerick Street CiW5tate: Moreno Valley, CA 92952 Telephone: (951)413-3115 Fax No. Contract Date: Aunu5t/ZO1 5 Completed Date: Contract value: $407,941.00 FTM Jo6 No: P13-27 Owner Job No, : Job Location: City of Irwindale, Avon Avenue Description of Work: Installation of Speed Table and Street Improvements Owner: City of Imindale Contact: Mr. Armando Hegdahl Address: 5050 North Imindale City/5tate: Irwindale, CA 91706 Telephone: (626)430-2200 Fax No.: (626)962 9 Zo90 Contract Date: Augu5t/2013 Completed Date: Contract Value: $33,333,00 FTM Job No: P13-28 Owner Job No. : Jn6 Location: City of San Bernardino, Almond Avenue Description of Work: Sidewalk Project Ownen City of Contact: Mr. Grant C, Mann Address: 825 Fast Third Street CitV5tate: San bcrnardino, CA 924 1 5 Telephone: (909)387-7920 Fax No.: (909)387-8 1 30 Contract Date: August/201 j Completed Date: Contract Value: $ 1 51,240.00 FTM Job No: P13-29 Owner Jo6 No.: 13 -GOES -511 JA Location: City of Coronado, (BTA GRANT) Description of Work: Scenic Bike Loop Owner: City of Coronado Contact: Ms. Mary L. Clifford Address: 1825 Strand Way Cit5/5tate: Coronado, CA 921 18 Telephone: (619)522-7384 Fax No.: (612)522* 17320 Contract Date: September/2o 13 Completed Date: Contract Value: $71,801 00 F7 M Jo6 No: P13-30 Owner Jo6 No.: 5548 Jo6 Location: City of Hemet, Cawston Avenue and Menlo Avenue Description of Work: Safe Routes to School Project Owner. City of Hemet Contract: Address: 1h 5 E-ast Horida Avenue CitV5tate: Hemet, CA92543 Telephone: (951)765-38474 Fax No.: (951)765-2337 Contract Data: OcLaler/20 1 3 Completed Date: Contract Value: 3554, 3 3 I .00 PTMJo6 No: P13-31 OwnerJo6 No.: Job Location: City of Colton, Railroad Crossing Description of Work: Street improvement Plans, Quiet Zone Owner. Cify of Colton Contact: Mr. Victor Ortiz Address: 650 North Le Cadena Drive Gty/5tate: Colton, CA 92324 Telephone: (909)370-5065 Fax No.: (909)370-5072 Contract Date: Augu5t/2013 Completed Date: (n -Process Contract Value: $929,961.00 PTM Job No: P13-32 Owner Job No.: 08-0521 Job Location: City of Corona, Lincoln Avenue and Parkridge Avenue Description of Work: Traffic Signal Installation (SR2S) Owner: City of Corona Contact: Mr. Albert F5pinoza Address: 400 5. Vicentia Avenue Ste. 21 O City/5tate: Corona, CA 92882 Telephone: (951)736-3548 Fax No.: (951)279-3627 Contract Date: November/2013 Completed Date: Contract Value: $332,713.00 I rM Job No: P13-33 Owner Job No. : Job Location: City of Culver City, Linwood to E. Howe Description of Work: Safe Routes to School Project Owner: City of Culver City Contact: Mr. Sammy Romo Address: 9770 Culver City CiV5tate: Culver City, CA 90232 Telephone: (310)253-5619 Fax No.: O Contract Date: Decem6er/2015 Completed Date; cjepten:ber/201 h Contract Value: $431,914.00 PTM Jo6 No: P13-35 Owner Jo6 No. : Jo6 Location: City of Colton, Morris Elementary and William Jehue Middle School Description of Work: Safe Route to School Owner: County of San Bernardino Contract: Mr. Victor Ortiz Address: 650 North La Cadena Drive City/5tate: Colton, CA 92324 Telephone: (909)370-5065 Fax No.: (909)370-5072 Contract Date: December/2013 Completed Date: Contract Value: $18,888.00 FTM Jab No: P13-36 Owner Job No.: 41040 Job Location: City of Redlands, Description of Work: Safe Routes to Schools, Cycle 8 Owner: City of Redlands Contact Mr. Jason Montgomery Address: 35 Cajon St. Suite 4 City/5tate: Redlands, CA 92373 Telephone: (909)798-7584 Fax No.: 0 Contract pate: Decem6er/2015 Completed Date: June/2014 Contract Value: $775,818.00 FTM Jo6 No: P13-37 Owner Jo6 No.: 41040 Jo6 Location: City of Hawthorne, Crenshaw Boulevard Description of Work: Furnishing and Installing Pole and Associated Conduits and Pull Boxes for the Installation of License Plate Recognition Cameras Owner: City of Hawthorne Contact: Mr. Arnold Shadbehr Address: 4455 W. 126th Street City/5tate: Hawthorne, CA 90250 Telephone: (310)349-2901 Fax No.: 0 Contract Date: Completed Date: Contract value: $33,332.00 FTM Jo6 No: P13-38 Owner Jo6 No.: 07A3552 Jo6 Location: Los Angeles County, Route 105 Description of Work: Repair Damaged Pump Stations Owner. Department of Transportation Contact: Ms, Joan Crews Address: 1727 301h Street City/5tate: Sacramento, CA 94828 MS 65 Telephone: (231)620-4852Fax No.: 0 Contract Date: Deceinbe:/2015 Completed Date: 5eptnmker/2014 Contract Value: $800,000.00 FTM Jo6 No: P14-01 Owner Job No.: SPEC 2051 Jo6 Location: City of Malibu Rte. 1 PCH at Big Rock Dr. Description of Work: Rte. 1 Pacific Coast Highway Intersection Improvements Owner: City of Malibu Contact: Mr. Arthur Aladjadjian Address: 23825 Stuart Ranch Road CitV5tate: Malibu, CA Telephone: (310) 456-2489 Fax No.: (310)317-0950 Contract Date: February/2013 Completed Date: August/2014 Contract Value: $149,049.00 FTM Jo6 No: P14-02 OwnerJo6 No.: 12A1522 EA 12-0N1014 Jo6 Location: City of Huntington Beach Rte. 39 (Beach Blvd.) at Chrysler Dr. Description of Work: Remove Section of Existing Median Island and Reconstruct Median Nose Owner: Department of Transportation Contact: Mr. Danh Thal, PE Address: 1727 30" Street City/5tate: Sacramento, CA 95816 Telephone: (916)227-6000 Fax No.: (916)227-6155 Email: danh.thai@dot.ca.gov Contract Date: February/2014 Completed Date: Dec 2014 Contract Value: $ 57,576.00 FTM Jo6 No: P14-03 Owner Jo6 No.: 8950 JA Location: City of San Marino, Oak Knoll and Monterey Road Description of Work: Traffic Calming Project Owner: City of San Marino Contact: Mr. Chuck Richey, Project Manager Address: 2200 Huntington Drive City/State: San Marino, CA 91108 Telephone: (626)300-0793 Fax No.: (626)300-0709 Contract Date: March /2013 Completed Date: Dec 2014 Contract Value: $92,599.00 FTM Jo6 No: P14-04 Owner Jo6 No.: CIP 331202, Bid No. 14-1006 Jo6 Location: City of Irvine, Warner Ave, Jamboree Road Description of Work: Northbound On -Ramp Traffic Signals Improvement Owner: City of Irvine Contact: Mr. Darrell Hartman Address: One Civic Center Drive City/5tate: Irvine, CA 92623 Telephone: (949)724-6000 Fax No.: (949)725-7556 Contract Date: April/2014 Completed Date: June 2015 Contract Value: $435,064.00 FTM Job No: P14-05 Owner Job No.: 227-58069, SR25L-5070 (028) Job Location: City of Pomona, Lexington Ave. (Garet' Ave. to White Ave.) Description of Wodc: Traffic Modification Owner. City of Pomona Contact: Mr, Ron Chan , PE Address: 505 S. Garay Ave. CitV5tate: Pomona, CA 91769 Telephone: (909)620-2261 Fax No.: (909)620-2269 Email: Ronald_chan@ci.pomoma.ca.us Contract Date: March/2014 Completed Date: October 2015 Contract Value: $571,209.00 FTM Job No: P14-06 Owner Job No.: 418-73371 Jo6 Location: City of Murrieta, Various Locations Description of Work: Pedestrian Safety Enhancement Project Phase II Owner. City of Murrieta Contact: Mr. Brian Stephenson, PE ,address: 1 Town Center square CitV5tate: Murrieta, CA 92562 Telephone: (951)461-6070 Fax No.: (909)461-6049 Email: bstephenson@murrieta.org Contract Date: April /2014 Completed Date: October/ 2014 Contract Value: $183,831.00 FTM Jo6 No: P14-07 Owner Jo6 No.: 134-27 Jo6 Location: City of Orange, Vista Ridge Drive Description of Work: Drainage and Street Improvement Owner: City of Orange Contact: Mr. Matthew Lorenzen, Project Manager /address: 300 E. Chapman Cit:V5tate: orange, CA 92866 Telephone: (714)744-5553 Fax No.: (714)744-5573 Email: mlorenzen@cityoforange.org Contract Date: April/2014 Completed Date: Sept 2014 Contract Value: $105,187.00 FTM Jo6 No: P14-08 Owner Jo6 No.: C4-0055 Jo6 Location: City of Riverside, Briggs Road on Bard Road Description of Work: Traffic Signal Lighting Project in the Community of French Valley Owner: County of Riverside Contact: Mr. Joel Jimenez, Project Manager Address: 3325 14°h Street Cif:V5tate: Riverside, CA 92504 Telephone: (951)955-1537 Fax No.: (951)955-3164 Email: jrjimenez@rtlma.org Contract Date: April/2014 Completed Date: Feb 2015 Contract Value: $179,132.00 FTM Job N P14-09 Owner Job No.: City Project No. 13-20 Job Location: City of Costa Mesa, Placentia Ave. at 20" Street Description of Work: Illuminated Crosswalk Project Owner: City of Costa Mesa Contact: Mr. Thomas Banks, PE Address: 77 Fair Drive CitVjtate: Costa Mesa, CA 92628 Telephone: (714)754-5355 Fax No.: (714)754-5028 Email: tom.banks@costa mesaca.gov Contract Date: June/2014 Completed Dake: In Progress Contract value: $130,990.00 FTM Job No: P14-11 Owner Job No.: City Project No, 13-13 Job Location: City of Costa Mesa, Sunflower Ave. at Anton Blvd Description of Work: Traffic Signal Modification, Federal Project No. HSIPL-5312 (085) Owner. City of Costa Mesa Contact: Mr. Thomas Banks, PE ,address: 77 Fair Drive Cif:V5tate: Costa Mesa, CA 92628 Telephone: (714)754-5355 Fax No.: (714)754-5028 Email: tom.banks@costamesaca.gov Contract Date: May/2014 Completed Date: In progress Contract value: $238,823.00 FTM Job No: P14-12 Owner Job No.: 3-R-13 Job Location: City of La Habra, Various Locations Description of Work: Annual Sidewalk and Wheelchair Improvement Project Owner: City of La Habra Contact: Mr. Christopher Johansen, Project Manager Address: 201 E to Habra Drive CitV5tate: La Habra, CA 90631 Telephone: (562)383-4151 Fax No.: (562)383-4476 Contract Date: May/2014 Completed Date: Dec 2014 Contract value: $182,383.00 FTMJ-6 No: P14-13 OwnerJo6 No.: Job Location: City of Stanton, Beach Blvd. & Village Center Drive Description of Work: Traffic Signal Improvements Owner: City of Stanton Contact: Ms. Stephanie Camorlinga, Eng. Asst. ,address: 7800 Karelia Avenue CitV5tate: Stanton, CA 90680 Telephone: (714)890.4204 Fax No.: (714)890-1443 Email: scamorlinga@ci.stanton.ca.us Contract Date: June/2014 Completed Date: In Progress Contract value: $388,888.00 FTM Job No: P14-14 Owner Job No.: Project No. 11-354 CIP 8438 Job Location: City of Murrieta, Alta Murrieta and Whitewood Description of Work: Traffic Signal Installation Owner: City of Murrieta Contact: Mr. Brian Stephenson, PE Address: 1 Town Center Square CifV5tate: Murrieta, CA 92562 Telephone: (951)461-6070 Fax No.: (909)461-6049 Email: bstephenson@murrieta.org Contract Date: Aug 2014 Completed Date: June 2015 Contract v.lue: $248,951.00 FTM Jo6 No: P14-15 Owner Jo6 No.: C2M14-39 Jo6 Location: City of Alhambra, Intersection of Garfield Ave & Talmage Burke Way Description of Work: Traffic Signal and Highway Safety Lighting System Owner: City of Alhambra Contact: Ms. Amanda Eltel ,address: 111 South First Street C&V5tate: Alhambra, CA 92562 Telephone: (626)570-5062 Fax No.: (626)458-4201 F,mail: aeltel@cityofalhambra.org Contract Date: July/2014 Completed Date: May 2015 Contract Value: $106,757.00 PTMJ06 No: P14-16 OwnerJok No.: 21242; Federal No, HSI PL -5351(023) Jo6 Location: City of Pico Rivera, Citywide Description of Work: Traffic Signal Safety Improvements Owner: City of Pico Rivera Contact: Mr. Jose Loera /address: 6615 Passons Blvd. Cit:V5tate: Pico Rivera, Ca 92503 Telephone: (562)801-4350 Fax No.: (562)949-7506 Email: jloera@picorivera.org Contract Datc: June/2014 Completed Date: August 2014 Contract Value: $1,937,510.68. FTM JA No: P14-17 Owner Jo6 No.: 14-041 Jo6 Location: City of Moreno Valley, Moreno Valley Mall Stop Description of Work: Mall Stop Enhancements Project Owner: Riverside Transit Agency (RTA) Contact: Mr. Andrew Frost Address: 1825 Third St, CitV5tate: Riverside, CA 92507 Telephone: (951)565-5190 Fax No.: (951)565-5191 Email: afrsot@riversidetransit.com Contract Date: September /2014 Completed Date: Aug 2014 Contract Value: $599,662.00 PTM Job No: P14-18 Owner Jo6 No.: 227-58070 Jo6 Location: City of Pomona, Fairplex Drive Description of Work: Traffic Signal Poles Relocation Owner•. City of Pomona Contact: Mr. Ron Chan, PE Address: 505 S. Garey Ave. CiV5tate: Pomona, CA 91769 Telephone: (909)620-2261 Fax No.: (909)620-2269 Email: Rona ld_c ha n@ci. pomoma.ca. us Contract Date: November/2014 Completed Date: April 2015 Contractvalue: $15,854.00 Briton Mendoza P.O, Box 7745 Riverside, CA 92513-7745 Fniaib briau@ptnt-eng,com . Cell 951,722,5755 Chief ]Estimator and Supervisor of Outside Operations Supervisor of outside operations with over 18 years of experience. Electrician with over 20 years of experience. An effective communicator and tear leader; experienced in coordinating and executing large and fast -paced projects. CAREER EXPERIENCE Freeway Electric/PTNI General Engineering Services, Inc. Riverside, CA 06/2006 to ])ate Chief Estimator/Supervisor of Outside Operations In charge of managing the estimating department and finalizing bid packages; coordinating the beginning phase of an awarded project between the company and agency. Project submittals, contract review. Coordinated and managed crews California region; handled various sized projects ranging in size from $1,000 to $4.5 million dealing with dry utilities, wet utilities, traffic signals, and road improvements. Maintained coordination Freeway IEectric/PTM General Engineering and subcontractor, and project owners. In charge of handling project's administrative work; monthly gross estimates, project progress schedule, inaterials requisitions, contract change order negotiations and equipment purchase and rentals. High Light Electric Ine./Peie & Sons Construction Inc. Riverside, CA 10/96 to 06/2006 Chief Estimator In charge of managing the estimating department and finalizing bid packages. Coordinating the beginning phase of an awarded project between the company and agency or gime contractor; project submittals, contract review. Successfully bid on projects totaling $12 million with an average spread 6%. Area Supervisor Coordinated and managed 10 crews consisting of 6 members per team in the southern California region; handled various sized projects ranging in size from $1,000 to $4.5 million dealing with dry utilities, wet utilities, traffic signals, and road improvements. Maintained coordination between High Light Electric Inc and subcontractor, general contractor and project owners. In charge of handling project's administrative work; monthly gross estimates, project progress schedule, materials requisitions, contract change order negotiations and equipment purchase and rentals. Continued... BRIAN M:ENDOZA v Page t CAREER EXPPRIRN('E CONTINOlD MBE Electric Inc. it] Riverside, CA 10/1998-10/1996 Vice President and Head of Outside Operations Managed outside operations for all projects ranging it, size fl-orn $1 to $2.5 million, Headed Rn around the clock electric crew and coordinated with CC Meyes to repair the 1-10 Santa Monica Freeway after it collapsed during the 1994 Northridge Earthquake to complete (he fast paced project in 66 days. Maintain coordination beriveen hIBE Clechis and subcontractors, general contractor and project owners; implemented and enforced safety guidelines. Handled administrative work, monthly progress estimates, material requisitions, contract change order negotiations. Vasco Corporation in San Fernando, CA 10/1987-06/1998 EOre"12n (Part Time) Managed day to day operations of work crews and various projectsranging in size from $1,000 to $5,000 in Eastern Los Angeles County; traffic signals, street lighting, signal interconnect. Raymor Electric in Rosemead, CA 06/1986-10/1987 Crew Leader (Fant Time) In charge of work ciew on projects ranging from $25,000 to 5250,000 through out Los Angeles County. WORI{ SKILLS • Capable of operating heavy equipment such as skip loaders, cranes, and backhoes; Hands-on experience with hand tools and power tools; • Capable of overseeing fast -paced and high profile projects; • An effective communicator and leader; EDUCATION • International Brotherhood of Electrical Workers Completed training course (1!)88-1989) in street lighting and traffic signal installations, code enforcement and blue print reading. • South Gate High School Received High School diploma in 1988 -BRIAN MENDOZA • Page 3 CAREER EXPERIENCE CONTINUED PROFESSIONAL MEMBERSHIPS • International Brotherhood of Electrical Workers (IBEW) • National Electrical Contractors Association (NECA) ACCREDITATION • IBEW-Journeyman Wireman; CSLB-Electrical Contractors, Certified Trench Safety Coordinator, • English (Native) • Spanish (Fluent) LANGUAGES AWARD RECEIVED • Recipient of the U.S. Small Business "Young Entrepreneur of the Year" Award in 1996, nationally. • Recipient of the Certificate of Recognition by the City of Los Angeles for "Small Business" in 1997. • Recipient of the Certificate of Recognition by the City of Riverside for "Small Business" in 1997. • Recipient of the Certificate of Recognition by the State Assembly, Assemblyman Mr. Rod Pacheco, for the "top 500 Inland Empire Small. Business" in 1997. • Ranked among the "Top 500 Inland Empire Hispanic Owned Companies" since 1997. • Certification of Appreciation for our participation and maximization in the "Century Freeway Affirmative Action" by CFAAC. PROFESSIONAL AND PERSONAL REFERENCES Caltrans project #07--1224U4 (Electrical contract amount $4.5 million) Project completed in 2005 Description of project: Installation of traffic signals, ramps metering, sign illumination, Highway lighting, fiber optic cormnunication, and electrical irrigation along the I-10 Freeway in Los Angeles County. • Doug Dwason-Project Manager for prime contractor, Balfour Beatty Cell (949)232-3276 and Office (909)397-8040 • Patty Galvan- Resident Engineer. Office (909)594-4270 • Veronica Ross -Electrical Inspector. Cell (714)606-6311 BRIAN MENDOZA . Page 4 CARDLIR EXPERIENCE, CONTYNUED City of Redlands Contract #208300-72304/41008 (Electrical contract amount is $218,800) Project completed in 2003 Description ofproject: hrstalla and signillumination,tiou of traffic signals, modification of ramp metering, lighting . • Bill Hensley -Senior Civil Engineer- Office, (909)798-7586 ext 2 • Juan Olvera-Project Manager for general contractor, H&H Coustraction- Cell (951)453-7712 and Office(909)473-7331. Caltrans project #08-4567V4) Electrical contract amount is $.938,238) Project completed in 2005 Description of Project: T11Stallati0n of lighting system along tire, I-5 Freeway in San Bernardino County, • Gary Vogel -Project Manager form prime contractor, Granite Construction Cell: (661)549-3953 and Office (661)726-4447' Sanbag Projects, Segment 1, 2, 3, early segment 9, segment 9, and alder Ave. (Total electrical contractanrount was S3.2 million) Project completed in 2004. Description of projects: Installation of traffic signals, tamp metering, sign illumination, highway lighting, fiber optic communication, and electrical irxigatibn along the. I-10 Freeway in San Bernardino County. Harold Lantis-Saibag Contract Manager- Cell (760)802-7730 and Office (909)875-8029 ext 213. Tim. Hanable-Caltrans Inspector- Cell (951)712-0021 Al Ortega- Project Manager for prime contractor, Yeager Shanska- Cell (714)240- 5333. City ofiudio Project #ST0137 (Electrical contract amount was $1,4 million) Project completed in 2005 Description of project: Installation of street lighting system, traffic signals, electrical irrigation, and dry utilities. • Gary Baxter -Area Manager for prime contractor, Yeager Shanska Construction - Cell (909)721-9749 and Office (760)343-5472 • Tommy young -Project Manager for prime contractor- Cell (951)232-6618 and Office (760)343-5472 • Mehran Sepehri-City Engineer- Cell (760)250-2201 Additional Professional References: • Zale Barris -Caltrans Inspector- Cell (951)289x0047 • Ray Robles -Caltrans area supervisor- Cell (909)799-0646 CITY OF SANTA ANA PROPOSAL PROJECT N0. 14-6799: New Trefflc Signal on Newhore St and Camille St PROJECT No, 14-6800: Traffic Signal Mod if [cation on Segeratrom Ave and Bear St NON -COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put In a false or sham bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested In the proposed contract; that all statements contained In the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Note: The above Non -collusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Non -collusion Affidavit. BIDDERS areca Toned that making a false certification may subject the certifier to criminal prosecution Signed ``- Elizabeth H. Mendoza de McRae, President/CFO State of California County of Subscribed and sworn to (or affirmed) before me on this _ day of 20_, by proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me Notary Public Signature Notary Public Seal BP -1.3 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the Identity of the Individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) County of ORANGE ) On4f ti1-(p, & I�� before me, PHILIP VEGA, NOTARY PUBLIC Date Here Insert Name and Title of the Officer personally appeared ELIZABETH H. MENDOZA de McRAE Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and offiQial seal. PHILIP VEGA S COMM. # 197'7088 �+ y P NOTARY PUBLIC- CALIFORNIA o Signature LOSANGELES COUNTY My Comm. Expires MAY 31,2016 Signature of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): — ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: ©2014 National Notary Association • www.NationaiNotary.org - 1 -800 -US NOTARY (1-800-876-6827) Item #5907 CITY OF SANTA ANA PROPOSAL. PROJECT N0, 14-6799: New Ti aRic Signal on Newhope Stand Camille St PROJECT N0, 14-6800: Traffic Signal Modification on Sege rstrom Ave and Bear St NON-DISCRIMINATION CERTIFICATE The undersigned contractor or corporate officer, during the performance of this contract, certifies as follows: 1. The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin, Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post In conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Contractor shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The Contractor shall furnish all Information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be Imposed and remedies invoked as provided in Executive Order BP -14 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhope Stand Camille St PRO) ECT N0, 14-6809: Traffic Signal MadMcation on Segerstrom Ave and Bear St 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. 7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, No discrimination shall be made In the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided In Section 1420, and any contractor of public works vlolatingTt�is Section is subject to all the penalties imposed for a violation of the Chapter. j( Signed: �� 2 Title: Elizabeth H. Mendoza de McRae, President/CFO Firm: PTM General Engineering Services, Inc. Date: 10.05.2015 BP -1S CITY OF SANTA ANA PROPOSAL PROJECT NO. 14.6799: New Traffic Signal on Newhope St and Camille St PROJECT NO, 14.6800: Traffic Signal ModHicarion on SegarWoin Ave and Bear St STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000 or 20 working days shall: 1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area of the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or Industry affected. 2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the apprenticeship standards. 3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or apprentices on the public work, in the same amount or upon the same basis and In the same manner s) the other contractors, except contractors not signatory to the trust agreement shall pay a i e amount to the California Apprenticeship Council. Signed: Title: Elizabeth H. Mendoza de McRae, President/CFO Firrn; PTM General Engineering Services, Inc. Date: 10.05.2015 EM CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6749: New Traffic Signal on NewhoPe St and Camille St PRO) ECT NO. 14.68W Traffic Signal Mod Iflcatlon on Segerstram Ave and Hear St STATEMENT REGARDING "ANTI -KICKBACK- REQUIREMENTS The undersigned is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3), This act provides that each contractor or subcontractor shall be prohibited from Inducing, by any means, any person employed in the constrc ion or repair of public work, to give up any part of the compensation to which he/she is othe ise entitled, Signed: Title: Elizabeth H. Mendoza de McRae, President/CFO Firm: PTM General Engineerinq Services Inc. Date: 10.05.2015 BP -17 CITY OF SANTA ANA PROPOSAL PROJECT N0, 14.6799: New Traffic Signal on Newhope St and Camille St PROJECT NO, 14.6800: Traffic Signal Modification on Segerstrom Ave and Bear St PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of perjury, the following questionnaire: Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary Interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No x If the answer is yes, explain the circumstances in the following space. BP -18 CITY OF SANTA ANA PROPOSAL PROJECT N0, 14-6799c New Traffic Signal on Newhepe St and Camille St PROJECT NO, 14�6800; Traffic Signal Modification on Segerstrom Ave'ak gear St BIDDER'S STATEMENT REGARDING REQUIRED FEDERAL CONTRACT PROVISIONS (Form FHWA 1273)u The undersigned, is submitting this proposal for performing by contract the work required by these bid document , agrees to comply with the required Federal Contract Provision (Form FHWA-1273) ash the Aj2pendix F of the special provisions of this project. Signed Title Elizabeth H. Mendoza de McRae, President/CFO Firm PTM General Engineering Services, Inc. Date 10.05.2015 1,193] CITY OF SANTA ANA PROPOSAL PROJECT NO, 14-6799: New Traffic Signal on Newhope Stand Camille St PROJECT NO, 14-6800; Traffic Signal Modification on Se@erstrom Ave and Bear St EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION The bidder PTM General Engineering Services, Inc. I proposed subcontractor hereby certifies that he has X , has not_, participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements. Note: The above certification Is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.) Currently, Standard Form 100 (EEO -1) is the only report required by the Executive Orders or their implementing regulations. Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor. BP -20 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 14-6800: Trafflr. Signal Mod if]cat !on on Segerstfom Ave and Bear St PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has,,,,_, has not )Lbeen convicted within the preceding three years of any offenses referred to in that section, Including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law In connection with the bidding upon, award of, or performance of, any public works contract, as defined In Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. Note: The bidder must place a check mark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.x Signed Title Elizabeth H. Mendoza de McRae, President/CFO Firm PTM General Engineering Services, Inc. Date 10.05.2015 EM CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-8799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 14.8800: Traffic Signal Modification on Segerstrom Ave and Bear St PUBLIC CONTRACT CODE SECTION 10232 STATEMENT In conformance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board, Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Signed Title Elizabeth H. Mendoza de McRae, President/CFO Firm PTM General Engineering Services, Inc. Date 10,05.2015 CITY OF SANTA ANA PROPOSAL. PROJECT NO,146799; New Traffic Signal an Newhope St and Carni Ile St PROJECT NO, 14.6800: Traffic Signal Mod if cation on Segerstrom Ave and Bear St TITLE 49 CODE OF FEDERAL REGULATIONS PART 29 DEBARMENT AND SUSPENSION CERTIFICATION The bidder under penalty of perjury, certifies that except as noted below, he/she or any person associated therewith in the capacity of owner, partner, director, officer, manager: is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any federal agency; has not suspended, debarred, voluntarily excluded, or determined ineligible by any federal agency within past three years; has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years. If there are any exceptions to this certification, Insert the exceptions in the following space,. Exceptions will not necessarily result in denial of award, but will be considered in determining bidders responsibility. For any exception noted above, indicate below to whom it applies, initialing agency, and dates of action. Note; Providing false information may result in criminal prosecution or administrative sanctions, The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification, Name of BidderPTM neral Engineering Services, INc. Signature of Bidde� E .Mendoza de McRae Date 0 5. 0 President/CFO CITY OF SANTA ANA PROPOSAL PROJECT NO. 14,6799: New TrAH1c Signal on Newhope St and Camille St PROJECT NO, 14-6800: Traffic Signal Mod if kation on Segerstrom Ave and Bear St NON -LOBBYING CERTIFICATION FOR FEDERAL AID CONTRACTS The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influence or attempting to Influence an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriate funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form -LLL, "Disclosure of Lobbying Activities," in accordance with its Instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code, Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall equire that the language of this certification be included in all lower tier subcontract which exceed $100,000 and that all such sub -recipients shall certify and disclose according) . Eii£dbeth H. Mendoza de McRae President/CFO Signature PTM General Enaneerina Services, Inc Firm 10.05.2015 Date • Standard Form UL may W obtained 61,m Calvans and P`JIWA ni'Nra� ESP -24 CITY OF SANTA ANA PROPOSAL PROJECT NO, 146799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 145800: Traffic Signal Mod iflcatirni on Segeratrom Ave and Bear St N/A = Not Applicable DISCLOSURE OF LODDYNG ACTIVITIES APIPMVed by 0MI5 Complete this to= to disolose lobbying activities pursuant to St U,S.C. 4352 6 (See reverse for reiban burl" ttittdn.. 1 9. Type of Federal Act" . 2. Status. al'Fedenal Ac' ...__. % Report Type: contract �a. bldlofinitial feed n ban InRiai filing a.ward b.. b. a Cooperatrm agreennowd C. past -award Fee maitariat Chance orrty: d. ban N/A N/A quarter N/A e. loon guarantee date of last report f, loan irouranDe d. name and Address of Reporting Entity: S. N Reporting Entity in No, d is a Subawardee, Eerier Name ❑ prow ❑ a and Aditness of Prkw,, Tear , dJarmen: N/A N/A Con ssior District, ff kmewm Corr res oistrtot, d S. Federal QepartmenitAgency: 7. Federal Program on. N/A CFM Number, rT ble: N/A • Federal Action Nmnbar,. Of known - S. Award Amount, df known: N/A I; N/A 10. a, Name and Address of Lobbying: Entity b, Individuals performing Services (kokuhng address ff Wasate7dual, last name first name, kff): differadf them No. 10a) (lass nwrPe, first name. WA . N/A N/A eYs sAtttaq .740Wa 11, Amount of Payenent (chwak aN wpply); 13, Type of payment (check 30 that aPpli'): 3 N/A ❑ actor ❑ Plarnled ❑are N/A ❑ 0.onobowtoe ❑ c» 12. Form of Payment {ebmdir all that apply): a oaeh E14.0ofthatinatme ❑ a. in -am spadtp: [] 4 d value 711, . "my: 14, Brief DeacriptUm of Services peratanned or to be Performed and oate(s) of Service, incieding ofgcer(s)t.. empf s)'e or Member(s) cantaoted, far Payment hrdleated in hem, 11: N/A armati SF r 15. Coniirmatian Shee s SF-La.LA. Nee xr.,a.aa reun.rvx rw r.n, . eam iG. rare. earn w .aero e . m rte. Sign m: PdrdName: lizabethH.MendozadeMcRae �xm ar q.n ,t" eras.re,,,�,,tr. « .,aatna>vr11,,:�„« Titka; President/CFO •. aaM W tlwr +.r.4.pnftlr avi.a br wailYWM «rtw m.znaw*+^i tr.awterw .Ma nn. ax. run to e. Teiaplxvte Nn.: 951.710.1000 10.05.15 Federal Use onty: AdIffoofted for Lot Stalded FOon LLL Mv. 747 BP -25 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhopa St and Camille St PROJECT NO. 14.6800: Traffic Signal Modification on Segarstrmn Ave and Bear St its mrmshat ✓o WMIIthe easy, eea aam Coaprevkxrstprtg, purawtW 31 U;3C, Seam 1352 The spdoe on fie tum I5 palliated by ale Office of c hiN1 alB taw atf/a add Madam casage Mama Ram' id pk knpremalWrg. 3' Or Bid rep& 0#4 W a'TaWMV ale to tMergre aft repodwow aye mafiaataraa>Bebme Mannon.panonfaqrep actm 5, a dad argrltzadd¢l. gala raper<In Itam4 afteoke tlIe h8 and ai are Federal aFtl1aM C{kl lot Otstnd, ffkrYVRI. exanaa, En ate a r�wsn at leasidta a ,p a. Deparaneaffid Transporladakthtfad santscrag Genre. 7,. Fsoara�. FecoFatpraganlnarnaee aacaapltnnfirthe F (t[em 1}a Dae ap Cala4aJa arca {CFM40~ for 9MM 0XVIelal agretWoOrat, JM9, and Wadaaarvall a. Enter the road oplampraldFool WoMAINalar the F at0on Mandated 0 Barn l (egg,forPMPUM RF n for Bid Stomp Rumaer, grant an. art a d ata apPllad { � Wonder 9y the Feall andafamum a.p.,-SFA-. .. 9. Faa as aeaata Wan 1tT iha Feyee'>>I:geftry. altCrareF aawuttt#it�awaratavt anneal Ntala: � fi 4a 5. Id, (a) E9paq do fall Raine. Oral icy, "agate and zip of she engagod o good In naea d b kahadano as covered Obit BaTtl"epat tal (a) 41111 InaUdl U WMM It drWaM fMM 10 (al. EABEI'L39 Name.Flmt Morro,and 3it0�JMSdI (Pal} It, t2.trke®appcapda[enak().ca�ka5 aoresfiat a asw�taa 9�•havrearcdntlha 13.. Cts the Cheek. Al - aPply. a , epeaay MOM Innavilspeark and deialled aczrs she ,awed, expecWtOpernamom on, aate{slof any.. e dwm ak « a` fstated aO ty, " JwA Mate m aaWu coodut wM Fontenot adil Read, pro Fa ,y OdoodPR a 15... Yd>plltB@!' `a *sFL.lUCa):F6 _ . 16, The Metal InAild, WSM and add and roam, Pont ttpf%i anatele¢acne. Annealing to t+apa tom, as:aMdedr&onapatapand toeeapepda,a d, Mwoonoo,,al it aVp a O6alP CdW Narroon. Ttfi vola OMS annarto mane faro ROW WoMM MCA18"0, W436046, PUNIC repoll WON Mr Mak a#Odadadon,ae, 'difilattaft aYaMW 30 intra per tesp<ate. ndaidung dme lar i existing aaia iiotiaes. l}aft ir§ M N"daa Deentok add OURIMaIng and are CallotbM OfMetalled. Sena 03014ards Mgadng tie Bandana esowlea any ontan aspect of rtpettme Of fie to de Ol 401' Mana9meni'. R (aatsnrMSl.w 01726503. SP -26 CITY OF SANTA ANA PROPOSAL PROJECT N0, 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT NO, 14.6800: Traffic Signal Modification on Segerstrom Ave and Bear St EXEIt1SIT 15-G CONSTRUCTION CONTRACT DBE CoAIN1l'rN ENT 1, Local Agency: City of Santa Ana ^, 2. Contract DDE Goal: q.ggoA 3. Project Description New traffle signal on Nawhone otreet at Camille Slrt, 4. Project Location: Newhope Street at Camille Street in the City of Santa Ana 7. Bid 5. Bidder's Name: PTM General Engineering Svcs, Inc. 6. Prime certified DBE: ❑ Amount: 215801.00 S. Total Dollar Amount for ALL Subcontractors: 97643.00 9. Total Number of ALL Subcontractors. 5 10. Bid Item Number 11. Description of Work, Service, or Materials Supplied 12 DBE Cortificatlon Number 13. DBE Contact Information (Must be certified on the date bids are opened) 14, DBE Dollar Amount Ptn. #9, Traffic Loops Crac filling Inc. 10A 11 Portion of loop install, 38033 946 S. Emerald St. Anaheim, Co 92804 6610.00 71 .520.4026 Local Agency to Complete this Section $ 6610.00 21. Local Agency Contract Number: 22, Federal -Aid Project Number: HSIPL 5469(152) 23. Bid Opening Date: October 6, 2015 15. TOTAL CLAIMED DBE PARTICIPATION 3.0 070 24. Contract Award. Date: IMPORTANT: Identify all DBE firms being claimed for credit, regardless of tier. Names of the First Tier DBE Subcontractors and their respective items) of work listed above must beonsistent, where applicable with the names Local Agency certifies that all DBE certifications are valid and information on this form Is complete and accurate, and items oft work in the °Subcontractor List' submitted with your bid tten confirmation of each listed DBE is rayylr 25. Local Agency Representative's Signature 26, pate 16. Preparer's Signature 17. Date Elizabeth H. Mendoza de McRae 951.710.100 27. Local Agency Representative's Nama 28. Phone i8. Preparer' -Name 19. Phone President/CFO 29. Local Agency Representative's Title 20. Pre arer's Title DISTRIBUTION: 1. Original - Lo cal Agency '2. Copy - Caltrans District Local Assistance Engineer (DLAE). Failure to submit to DLAE within 30 days of contract execution may result in de -obligation of federal funds on contract. Include additional copy with award package, ADA Notice: For Individuals with sensory disabilities, this dooumant Is available In alternate formats. For Infomlallon call 1916) 554-6410 or TDD (916) 064-3880 or write Records and Forms Management,1120 N Street, MS -69, Sacramento, GA 05814, BP -27 CITY OF SANTA ANA PROPOSAL PROJECT N0, 14-6799: New Traffic Signal on Newhope St and Camille St PROJLCT NO. 14.6800: Traffic Signal Modification on Segerstrom Ave and Bear St it Emil l'r 15-C CONSTRUC'11ON CONTRACT DBE ConrntzTx4uNr 1. Local Agency: _ Cffy of Santo Ana 2. Contract DBE Goal: 1.06% 3. Project Description: Traffic signal modificaflon on aeaerstrom Avenue at Bear Rtraet 4. Project Location: Ganarstrnm Avenue at Rear Street In the City of Santa Ana 5. Bidder's Name: PIM General Engineering SVCS Inc.8. Prime Certified DBE: ❑ 7. aid Amount: 158172.00 8. Total Dollar Amount for ALL Subcontractors: 38975.00 9. Total Number of ALL Subcontractors: 10. Bid Item 11. Description of Work, Service, or Materials 12, DBE 13. DBE Contact Information 14. DBE Supplied Certification (Must be certified on the date bids are Dollar Number Number opened) Amount Pin. #37Traffic Loops Crackfiling Inc. & 38 Portion of loop install. 38033 946 S. Emerald St. Anaheim, CA 92804 5455.00 714.520.4026 Local Agctncy to Co tipicte-this See(wn _ $ 5455.00 21, Local Agency Contract Number: 22, Federal -Aid Project Number: 18, TOTAL CLAIMED DBE PARTICIPATION 3.4 HSIPL 5063(l 51) 23. aid Opening Date; October 8, 2015 24. Contract Award Date: IMPORTANT: Identify all DBE firms being claimed for credit, regardless of tier. Names of the First Tier DBE Subcontractors and their respective Rem(s) of work listed above must be consistent, where applicable with the names and Items oft work in the "Subcontractor list" submitted Local Agency dangles that all DBE certifications are valid and ➢nformation on with your bid. dtten confirmation of each listed DBE is this form is complete and accurate. rodoir 10.07.2015 25. Local Agency Representative's Signature 26. Date 18. Pr p er,$ Signature 17. Date EIizak),Qth H Mendoza de MSRae 951 710 1000 27. Local Agency Representative's Name 28, Phone 18. Preparer's Name 19, Phone President/CFO 29. Local Agency Representative's Title 20. Pre arer's Tide DISTRIBUTION: 1. Original -Lo cal Agency 2. Copy - collages District Local Assistance Engineer (DLAE). Failure to submit to DLAE within 30 days of contract execution may result in de -obligation of federal funds on contract. Include additional copy with award package. ADA Notice: For individuals with sensory disablliges, this document Is available In alternate formats, For Information call (g16) $54.6410 or TDD (916) 664-3880 or write Records and Forme Management, 1120 N Street, MS -89, Sacramento, CA 95614. mm M �, _7 1.-1 PROPOSAL PROJECT NO. 14-6799: Now Traffic Signal on Newhope Stand Camille St PROJECT NO. 14.6800: Traffic Signal Modification on Segrostrom Ave and Bear St INSTRUCTIONS - CONSTRUCTION CONTRACT DBE COMMITMENT CON MACTOIZ SECTIO 1, Local Agency - Enter the name ofthe local or regional agency that is hitting the contract. 2. Contract DBE Goal -linter the contract DBE good piaccivagc its it appears of the project advertisement. 3. Project Location - Fater the project location as itappoars, on the finkiect advertisement, 4. Project Description - Four the project description its it Appears on the firrrJect advertisement (Bridge Rehab, Seismic lWillb, Overlay, Widening. etc). i. Bidder's Name - Fluor the cmiffacuir's firan name 6, Prime Certified DBE - (1codc box if prime amftactor is a certified DBI 7. Bid Amount - Filter the Join[ contract bid dollar amount fir the prime contractor. 8. Total Dollar Amount for ALL Subcontractors — Enter the total dollar amount for all subcontracted contractors. SUM (DBFS + all Non -DBEs). Do not include the prime conuaQuor inimmatior in this count. 9. Total number of ALL subcontractors — floor the total number of all subcontracted contractors. SUM = (DBEs + all Non - DBEs), Do not include the prime contractor information in this count, 10. Bid Item Number - ]-dater bid item number for work, services, or materials supplied to be provided. 11. Description of Work, Services, or Materials Supplied - Enter description ofwork, services, or materials to be provided. Indicate kill work to be perlin tried by DBEs including work performed by the prime corill-acton's rrwil forces, if the prime is a DBE It'] 00% ofthe item is not to be pci-fortired or famished by the DBP, describe the exact portion to he performed or J111 11;%lied by the DBK See LAYlvi Chnfact 9 to determine how to count Ite participation of'DBE firms. 12. DBE Certification Number - Enter the DBE's Certification Identification Number, Alt IMES must be certified on the date bids are opened, 13, DRE Contact information - Enter the tune, address, and phone number ofatl DBE subconbacted contractors. Also, enter the prime contractor's name and phone number, if the prime is a DBE, 14, DBE Dollar Amount - Fluor the Subcontracted dollar amount of the Work to be perfmined or service to be provided. Include the prime contractor if the prime is a DBF. See LAPNI Chirpier 9 fin how to count roll/partial participation, 15. Total Claimed DBE Participation - $: firmer the total dollar amounts entered in the -DBE Dollar Ainouirt"colmyrn, %: Enter the total DUE participation claimed ("Total Claimed D13F participation Dollars" divided by item "Bid Ammuna"), If the total 11% churned is less than item "Contract DBE Goal," an adequately documented Good Faith Effort (OFF) is inquired (see Exhibit IS- I[. DHE lufannafion - Good Faith Efforts of are LAPISh. 16, Preparers Signature - The person completing the DBE comillitracat firrm on behalf of tile coninctol Is firm must sign their Imine, 17. Date - Enter the date the DDE commitment foam is minted by the contractor's preparer. 18. Preparers Name - letter Ole name of the person preparing and signing the cordraI FAIL coraffiffitioart Form. 19. Phone - Erifici the area cooloc and phone number of the Person Sipling tilt' contractor's DDE commitment fount. 24). Preparer's Title - Enter the position/title offfic person simiag sipling contractor's DIIF conn uriont form. LOCAL A(JENCY SEC1 ION 21. Local Agency Contract Number - Fluor the Local Agency contract number or identifier. 22. Federal -Aid Project Number - Filter (lie Foderal-Aid Project Number, 23. Bid Opening Date - Enter the (title contract bids were opened, 24, Conti -act Award Date - Enter the date the contract was executed, 25. Locid Agency Reprosentativers Signature- T"he person coullpleting this Section of the ibrin IZ)r The Local Agency must sign their name to certify that the information in this and the Contractor Section of this form is complete and accurate 26. Date - Filter The date the DBE corruinitiffent Rnniff is signed by the Local Agency Representative. 27. Local Agent), Representative's Name - Filter [lie name of [lie Local Agency Itepresidantive certifying the contractor's DHE commitment form. 28. Phone - Filter the area code and phone another of the person signing the contractor's DBE commitment Imill. 29. Local Agency Representative Title - klacir (lie local Ageticy, Ropiesentative certifying the contractor's D13F commitment form. BP -29 Date: Attn: Owner: Project: Bid Date: Traffic Loops Crackfilling, Inc. 946 S. Emerald Street, Anaheim CA 92804 • Tel: (714) 520 4026 Fax: (714) 520 4027 State License No. 652956 • Class C-10 & C-32 • DBE & UDBE No. 38033 DIR Registration No. 1000003794 • Expiration Date: 06/30/2016 Email: Mailan@ticinc-ca.com or Estimating@ticinc-ca.com 10/5/2015 Quotation Estimator City of Santa Ana Project No. 14-6799, Federal Project No. HSIPL 5063(152) - T/S Installation on Newhope Street at Camille St. Project No. 14-6800, Federal Project No. HSIPL 5063(15z) - T/S Modification on Segerstrom Avenue at Bear St. 10/06/2015 @ 2:00 PM BID ITEM DESCRIPTION QTY. UNIT UNIT PRICE ITEM TOTAL Project No. 14-6799 9 Install Traffic Signal Loop Detector (Type D Loop) 14 EA 325.00 4,550.00 10 Install Bicycle Loop Detector (Type E Loop) 6 EA 235.00 1,410.00 11 Install Bicycle Loop Detector (Type Q Loop) 2 EA 325.00 650.00 Project No. 14-6800 37 Install Traffic Signal Loop Detector (Type D Loop) 11 EA 325.00 3,575.00 38 Install Bicycle Loop Detector (Type E Loop) 8 EA 235.00 1,880.00 TOTAL BID AMOUNT: $ 12,065.00 -Quote is good for 180 days from the date of this proposal. •10 days notice required for scheduling. -Site must be ready with cat -track or permanent striping prior to loop installation. -Additional charges may incur for extra move -ons. Our quote includes: 1- Lay out, saw cut, wash, blow, dry, seal, and megg 2- Loop saw cut shall be filled with Hot Melt Sealant 3- Insurance coverage up to $1 million, general aggregate up to $2 million, umbrella up to $2 million 4- Traffic control 5- One move -on Our quote excludes: 1- Bond fee, permit fee, utilities fee, advance sign posting of any kind, or notifying residents 2- Traffic control plan 3- Weekend work 4- Conduit, stub -out, splice All inclusions and exclusions are to be incorporated into our contract. If either party becomes involved in litigation or arbitration arising out of this contract, the court or arbitration panel shall award attorney's fees and costs to the prevailing party. Please call if you have any questions or need more information. Sincerely, Mai -Lan Nguyen Page 1 of 1 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhope St and Carniile St PROJECT N0, 14-6899: Traffic Signal Modification on Segerstrom Ave and Rear St EianlusIT 15-H DBE INFaanint'ION ---Gocaa FninI EFFORTS DBE INFORNIATION - ti FAITH EFFORTS HSIPL5063(152) HSIPL5063(151) 10.06.2015 Federal -aid Project Na. _,_,.Bid Opening Date Santa Anp/Orange 1.43 The (City/comity, oft established Jt Disadvantaged Business Enterprise (DBE) goal ofl •05 a/, for this project. The information provided herein shows that a good faith effort was node. ]„Qwest, second lowest and third lowest bidders shall submit the following information to document adequate good faith efforts. Bidders should submit the following information even if the "Local Agency Bidder DBE Conuniticamt" form indicates that die bidder las tact the DBE goal. This will protect the bidder's eligibility for award of the contract if the administering agency determines that the bidder failed to tnect the goal for various reasons, e.g., a DBB firm was not certified at bid opening, or file bidder made a Mathematical error. Submittal of only the "Local Agency Bidder DBE Commitment" Form may not provide sufficient documentation to demonstrate that adequate good faith efforts were Inside. The Following items are listed in the Section entitled "Submission of DBE Commitment" of the Special. Provisions: A. The names and dates of each publication in which a request for DBE participation for this project was placed by the bidder (please attach copies of advertisements or proofs of publication): Publications Dates of Advertisement B. The names acrd dates of wrinen notices seat to cenifted DBEs soliciting bids for this project and the dates and methods tuned for following up initial solicitations to determine with certainty whether the DBEs were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.): Names of DBEs Solicited Date of lultaal Follow Up Methods and Dates Solicitation Goals Met BP -30 PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 146800: Traffic Signal Modification on Segerstrom Ave and Beer St C. The items of work which the bidder made available to DBE firms including, where appropriate, any Breaking down of the contract work items (includin& those items normally perro reed by the bidder with its own forces) into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation was made available to DBE firms. Items of Work Bidder Nonvally Breakdown of Amount percentage performs Item items O Of (V/Ni Contract D. The names, addresses and phone numbers of rejected DBE (inns, the reasons for the bidder's rejection of the D,BP_s, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if Ute selected firm is not a DBE; Names, .addresses and phone numbers of rejected DBEs and the reasons for flue bidder's rejection of the DBEs: Goals Met Names, addresses and phone numbers of flans selected for the work abovc; Traffic Loops Crackfilfmg Inc. 946 S. Emerald St, Anaheim, CA 92804 License No: 652956 Exp: 8.31,16 Class: C10, C32 Tel: 714.520.4026 Fax: 714.520.4027 Q/j Q 38m 33 c.. ,nnnnm�on E. Efforts made to assist interested DBEs in obtaining bonding, lines of credit or insurance, and any technical assistance or information related to the plans, specifications and requirements for the work which was provided to DBEs: Goals Met BI' -31 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New TrafficSignal on Newhope Stand Camille St PROJECT NO. 14-6800. Traffic Signal Modification on Sogerstrom Ave and Bear St F. Efforts made to assist interested DBEs in obtaining necessary equipment, supplies, materials or related assistance or services, excluding Supplies and equipment the DBE subcontractor purchases or leases from the prime contractor or its affiliate: G, The names ofagcticies, organizations or groups contacted to provide assistance in contacting, recruiting and using DBE Innis (please attach copies of requests to agencies and any responses received, i.e., lists. fixtemet page download, etc.): Name of Agency/Organization Method/Date of Contact Results Goals Met H. Any additional data to support a demonstration of good faith efforts (use additional sheets if nccessai-y): NOTE: USE ADDITIONAL SHEETS OF PAPER IF NECESSARY. BP -32 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 14.6800: Traffic Signal Modification on Segerstrom Ave and Bear St EXHIBIT 12-B BIDDER'S ].,IST OF SUBCONTRACTORS (DBE AND NON -DBE) PART] The bidder shall list Al subcontractors (both DBE and non -DBE) to accordance with Section 2-1.054 of the Standard Specifications and per Title 453, Section 26.1 t of the Code ofFederal Regulations. This listing is required in addition to listing DBE Subcontractors elsewhere in the proposal, Photocopy this form for additional firms. Address/ Phone/ Annual Cross Ity, State, Fax Receipts Name I Phone <$I mitliorLy� CT&T Concrete Paving Inc. - ~ 3245. Diamond Bar Blvd. PMB 275, Diamond Bar, CA 91765 License No: 87°627 Exp: 4.30.16 Class C12, C8 Tel: 909.396.8453 Fax: 909.396.0522 Dir: 1000025154 '$ I million ame / IJon¢ < . _ .... Traffic Loops Crackfilling Inc. 9465. Emerald St, Anaheim, CA 92804 License No: 652956 Exp: 8.31.16 Class: C10, C32 Tel; 714.520.4026 Fax: 714.520.4027 +onnnnv7q Name Phone Prime Performance Contractors 2711 Ridgeline Dr 4105, Corona, CA 92882 _ License No: 979710 Exp: 12.31.16 Class: A ( Tel: 714.362.1359 Fax: 951.454.4369 Name ( Phone 10 < $1 mil Crosstown Electrical & Data Inc — 5463 Diaz St, Irwindale, CA 91706 License No: 756309 Exp: 11.30,16 Class: C10 _ Tel: 626.813.6693 Fax; 626.813.6604 Dir: 1000000155 PCI P,O. box 16118, Long Beach, CA 90806 License No: 823802 Exp: 9.30.15 class C32, D42 Tel: 562.218.0504 Fax: 562.218.0634 Dir,. 1000005687 Description of Portion of Work to be Q ] Performed. Pt ®I1 10)'1C'V4& o 1'ESiltrDBL ES Y pfn ofkiops No r��cr�az p+n pc*IeW ®blf3 ct�Fiiaty"- Zf rY$ X60rtaific8M = _ F ani _ � a ='h0fElnn` 'IP�rF�s w x lwtillittvl BP -33 CITY OF SANTA ANA PROPOSAL PROJECT N0. 14-6799: New Traffic Signal on Newhope Stand Camille St PROJECT N0. 14.6800: Traffic Signal Modification on Sege rstrom Ave and Bear St EXHIBIT 12-B BIDDER'S LIST OF SUBCONTRACTORS (DBE AND NUN -DBE) PART II The bidder shall list all subcontractors who provided a quote or bid but were not selected to participate as a subcontractor on this project, This is required for complianec with Tine 49, Section 26 of the Code of Federal Regulations. Photocopy (his form for additional firms. Cat Tracking Inc. 2950o Rubo: Blvd, Riverside, Ca 92507 Licensea N 999 1122 Exp: 3.31.16 Class: A, B, C8, C12, C32 Tel: 951.2.25 54.9163 Fax: 951.682.1491 Dir: 1000011750 Superior Pavement Markings 14656 Industry Circle, La Mirada, Ca 90638 License No: 776306 Exp: 8.31.15 Tel: 714.562.9100 Fax: 714.995.9400 Dir: 1000001476 BP -34 g [MAC Fln. 0�5{v'/�r�� Wo lljt„ JM t CITY OF SANTA ANA PROPOSAL PROJECT NO. 14.6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 14.6800: Traffic Signal Modiflcatlon on Segerstrom Ave and pear St PROMPT PAYMENT OF FUNDS WITHHELD TO SUBCONTRACTORS The undersigned, is submitting this proposal for performing by contract the work required by these bid documents, certify to comply with the following: The agency shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the agency, of the contract work, and pay retainage to the prime contractor based on these acceptances. The prime contractor, or subcontractor, shall return all monies withheld in retention from a subcontractor within 30 days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the agency. Federal law (49CFR26.29) requires that any delay or postponement of payment over 30 days may take place only for good cause and with the agency's prior written approval. Any violation of this provision shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified in Section 7108.5 of the Business and Professions Code. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise availabletothe prime contractor or subcontractor in the event of a dispute involving late paynt or nonpayment by the prime contractor, deficient subcontract performance, or nit compliance by a subcontractor. Signed Title Elizabeth H. Mendoza de McRae, President/CFO Firm PTM General Engineering Services, Inc. Date 10.05.2015 BP -35 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14-67M New Traffic Signal on Newhope St and Camillast PROJECT NO. 14-6800! Traffic Signal Mod if[cation on Segorstrom Ave and Bear St DIFFERING SITE CONDITIONS The undersigned, is submitting this proposal for performing by contract the work required by these bid documents, certify to comply with the following: a. Contractor's Notification Promptly notify the Agency's Engineer if you find either of the following conditions: 1. Physical conditions differing materially from either of the following: • Contract documents • Job site examination 2. Physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent In the work provided for in the Contract Include details explaining the information you relied on and the material differences you discovered. if you fall to promptly notify the Engineer, you waive the differing site condition claim for the period between your discovery of the differing site condition and your notification to the Engineer. If you disturb the site after discovery and before the Engineer's investigation, you waive the differing site condition claim. b. Engineer's investigation and Decision Upon your notification, the Engineer investigates job site conditions and: 1. Notifies yo ,whether to resume affected work 2. Decides then the condition differs materially and is cause for an adjustm t of time, payment, or both Signed Title Elizabeth H. Mendoza de McRae, President/CFO Firm PTM General Engineering Services, Inc. Date 10.05.2015 BP -36 CITY OF SANTA ANA PROPOSAL PROJECT N0, 14-6799: Now Traffic Signal on Newholne Stand Camille St PROJECT NO. 14-68M Traffic Signal Modification on Segerstrom Ave and Beer St BIDDER'S CERTIFICATE OF COMPLIANCE REGARDING "BUY AMERICA" REQUIREMENTS FOR STEEL OR MANUFACTURED PRODUCTS The undersigned, is submitting this proposal for performing by contract the work required by these bid documents, ify to comply with the " Buy America" requirements of Section 165 of the Surface Transporrin Assistance Act of 1582 and as shown in the special provisions of this project. Signed Title Elizabeth H. Mendoza de McRae, President/CFO Firm PTM General Engineering Services, Inc. Date 10.05.2015 BP -37 CITY OF SANTA ANA SPECIFICATIONS PROJECT NO. 14-6799; New Traffic Signal an Newhope Stand Camille St PROJECT N0. 14-6so0: rrafftc Signal Modification on Segerstrom Ave and Bear St The Standard Specifications is the 2012 edition, including all supplements, at time of bid of the Standard Specifications for Public Works Construction, including supplements and accompanying Standard Plans, written and promulgated by Public Works Standards, Inc. These Standard Specifications shall control the general provisions, construction materials, and construction methods for this contract, except as amended by the Contract Documents. The following General Provisions are supplementary and in addition to the provisions of the Standard Specifications, unless otherwise noted. The section and subsection numbering system used in these General Provisions corresponds to that used in the Standard Specifications. The State of California Department of Transportation Standard Specifications, Standard Plans, and Manual of Uniform Traffic Control Devices, latest edition at time of bid of each, are incorporated herein by reference and are hereby accepted as Reference Specifications. These Reference Specifications are intended to govem certain construction materials, methods, and details except as modified herein or are inconsistent with the provisions herein. PART 1 GENERAL PROVISIONS SECTION 1 - TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE AND SYMBOLS 1-2 TERMS & DEFINITIONS Add the following to this subsection: Acceptance —The formal written acceptance by the Agency of the completed project. Agency — City of Santa Ana Approved Equal —material or product that has been reviewed and approved by the Engineer as similar and equal in all respects and acceptable for use in lieu of that specified. Approved, Required, Directed — or words of similar Import, refer to and indicate that the work or materials shall be "approved," "required," or "directed" by the City of Santa Ana or its duly authorized representative. Board — City Council of the City of Santa Ana Bid Proposal — see Bid City— City of Santa Ana Public Work's Contractor Registration Search Page 1 of 1 ail `s`erl` �Js Ye%Pint fl.l �'`I1"F pe, Ink, khhr itFkf) Division of Labor Standards Enforcement Public Works Contractor Registration Search This Is a listing of current and active contractor registrations pursuant to Division 2, Pan 7, Chapter I(commencing with section 1720) of the California Labor Code. Enter at least one search cntene to display active registered public works contractors) matching your selections. i Registration Number: 1000001433 Contractor Legal Name le ABC COMPANY yy Contractor License LookuL� License Number: ie, 606309 (CSLB) r 5earch.II,_ 2eset� Public Works Contractor Registration Web Search Results One Registered Contractor found, 1 Legal Name Registration Number License TypelNumber(s) Registration DalaExpiration Date PTM GENERAL ENGINEERING SERVICES INC -t0o0001433 CSLB'., 891265 07/07/2015 -`,0 11 6/30/20 11 16 Export as. Excell PCF Coptiright 'i. 2011 .State nt Czlifo, lu https://efiling.dir.ca,gov/PWCR/Search.action 7/7/2015 CERTIFICATE OF CORPORATE RESOLUTION I Brian Mendoza Secretary of PTM General Engineering Services Inc. (Corporation) do hereby certify that at a duly constituted meeting of the Stockholders and Directors of the Corporation held at the office of the Corporation on December 30 , 2007(year), it was upon motion duly made and seconded, that it be VOTED: Elizabeth H. Mendoza de McRae, President/CFO ..... OR.... Brian Mendoza, Vice President/Secretary Authorized to sign & execute contracts and submit bids with either one of the corporate officer's signatures. It was upon further motion made and seconded that it be further VOTED: That Elizabeth H. Mendoza de McRae, President/CFO ..... OR.... Brian Mendoza, Vice President/Secretary in the capacity as of the Corporation is empowered, authorized and directed to execute, deliver and accept any and all documents and undertake all acts reasonably required or incidental to accomplish the foregoing vote, all on such terms and conditions as he in his discretion deems to be in the best interests of the Corporation. I further certify that the foregoing votes are in full force this date without rescission, modification or amendment. Signed this (ate day of 0cf &h9v ZoIS (year). A TRUE RECORD ATTEST (Corporate Seal) 53 / Brian Mendoza Sectetaryy-eerk Vice President/Secretary CITY OF SANTA ANA INSTRUCTIONS TO BIDDERS PROJECT N0, 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT NO. 14-6800: Traffic Signal Modification on Segerstrom Ave and Bear St INFORMATION TO BIDDERS FOR PROPOSAL SUBMISSION INTENT OF BID PROPOSAL The purpose of this Bid Proposal is to identify a Prime Contractor to enter into a contract with the City of Santa Ana, referred to as AGENCY, to complete the work shown on the Contract Documents. BID PROPOSAL The Bid Proposal shall be submitted in accordance with the Notice Inviting Bids and shall be accompanied by the following documents: Bid Proposal 2-'�Bidder's Statement contractor's Licensing and Registration Statement Prevailing Wage Compliance and Monitoring Statement nership Affidavit Bid Bond List of Subcontractors References A ditional References ,,W,'Non-Collusion Affidavit t_�Wtst Discrimination Certificate ement Regarding Apprenticeship Requirements atement Regarding "Anti -Kickback" Requirements PPtiblic Contract Code Section 10162 Questionnaire Federal Aid Certifications ,a' Bidder's Statement Regarding Required Federal Contract Provisions Form FHWA-1273) Equal Employment Opportunity Certification .C./Public Contract Code Section 10285.1 Statement d. -'Public Contract Code Section 10232 Statement �, Title 49, Code of Federal Regulations, Part 29 Debarment and uspension Certification Non -Lobbying Certification for Federal Aid Contracts Disclosure of Lobbying Activities Instructions for Completion of SF -LLL, Disclosure of Lobbying Activities Exhibit 15-G Construction Contract DBE Commitment (HSIPL 5063(152)) ,i! Exhibit 15-G Construction Contract DBE Commitment (HSIPL 5063(151)) Instructions — Construction Contract DBE Commitment Exhibit 15-H DBE Information — Good Faith Efforts Exhibit 12-B Bidder's List of Subcontractors (DBE and Non -DBE) Part ,KlExhibit 12-B Bidder's List of Subcontractors (DBE and Non -DBE) Part 1 ,fl! Prompt Payment of Funds Withheld to Subcontractors CITY OF SANTA ANA INSTRUCTIONS TO BIDDERS PROJECT NO. 14-6799: New Traffic Signal on Newhope St and Camille St PROJECT N0, 14-6800: Traffic Signal Modification on Segerstrom Ave and Bear St /Differing Site Conditions , r' Bidder's Certificate of Compliance Regarding "Buy America Requirements for Steel or Manufactured Products The Bid Proposal may be considered non-responsive if any of these documents or forms is not included. The bid package shall be submitted as instructed in the Notice Inviting Bids. It is the BIDDER'S responsibility to ensure delivery of the proposal to the location and prior to the bid opening hour stipulated in the Notice Inviting Bids. Late bids will not be considered. CALIFORNIA STATE LABOR CODE As outlined in the Notice Inviting Bids, this project is subject to compliance monitoring and enforcement by the State of California Department of Industrial Relations, per Section 1771.4.a.1. BIDDERS are required to inform themselves fully of the conditions relating to construction and labor under which the work will be performed. Any contract entered into pursuant to this notice will incorporate the provisions of the California State Labor Code. Per Section 171.4.a.2, Contractors are required to post job site notices, as prescribed by regulation. EXAMINATION OF CONTRACT DOCUMENTS AND PROJECT SITE BIDDERS shall satisfy themselves by personal examination of the work site, Contract Documents including the Plans and Specifications (and by any other means as they believe necessary) as to the actual physical conditions, requirements, and difficulties under which work must be performed. DISCREPANCIES AND MISUNDERSTANDINGS No BIDDER shall at any time after submission of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies found in the Contract Documents including the Plans and Specifications shall be called to the attention of the AGENCY as a Request for Clarification and addressed prior to the submission of bid proposals. REQUESTS FOR INTERPRETATION OF CONTRACT DOCUMENTS Requests for interpretation must be received at least five (5) working days prior to the bid opening date. The person submitting the request will be responsible for its prompt delivery. Any interpretation or correction of the documents will be made only by an Addendum. ADDENDA All addenda issued during open bid advertisement period will be posted on the City of Santa Ana website and shall become part of the Contract Documents. Before submitting a Proposal, each BIDDER is responsible to become self -informed as to whether or not addenda have been issued. It is the BIDDER's responsibility to notify the AGENCY regarding receipt of addenda. Vi