Loading...
HomeMy WebLinkAbout23A - PROJ - SA STADIUM CONCRETE REPAIRREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JANUARY 19, 2016 TITLE: AWARD CONTRACT FOR THE SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIRS (PROJECT 16 -2656) (STRATEGIC PLAN NO. 6, 1B & 1G) c! 1 t ° CITY MANAGE RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ❑ As Recommended ❑ As Amended ❑ Ordinance on 1" Reading ❑ Ordinance on 2nd Reading ❑ Implementing Resolution ❑ Set Public Hearing For CONTINUED TO FILE NUMBER 1. Authorize the City Manager and Clerk of the Council to award and execute a contract to Metro Builders & Engineers Group, Ltd., the lowest responsive bidder, in accordance with the bid in the amount of $448,339.60 and the Additive Alternate Two of $20,300, for a contract total of $468,639.60, for the Santa Ana Stadium Structural Concrete Repairs, subject to nonsubstantive changes approved by the City Manager and the City Attorney. 2. Approve the Project Cost Analysis for a total estimated project delivery cost of $689,300, which includes the contract base bid amount, administration, inspection and testing, and a contractual contingency of $130,992, subject to non - substantive changes approved by the City Manager and City Attorney. DISCUSSION The Santa Ana Stadium was constructed in 1963. Due to aging and weathering, the concrete structure at various locations has cracked and broken off, exposing the reinforcing steel, and causing it to become corroded. In addition, the protective fencing adjacent to lateral seating areas is damaged and rusted at various sections (Exhibit 1). The recommended actions would support the City's effort to enhance the overall safety of the stadium by repairing the concrete structure and steps, and replacing existing fence with new galvanized steel. A Notice Inviting Bids was advertised on November 13 and 18, 2015, and bids were opened on December 1, 2015. The following is a summary of the bid invitations made and the bids received: Contractor Participation Data Santa Ana contractors receiving notices 13 Contractors requesting bidding documents 14 Bids received 6 Bids received from Santa Ana contractors 0 23A -1 Award Contract for Santa Ana Stadium Structural Concrete Repairs January 19, 2016 Page 2 Bid Results Summary RANK BIDDER'S NAME LOCATION BID 1 Metro Builders & Engineers Group, Ltd. Newport Beach $448,339.60 2 RSB Group, Inc. Lake Forest $465,100.00 3 Mode Engineering Laguna Niguel $474,900.00 4 Olympus Painting Inc. Van Nuys $606,700.00 5 Slater Waterproofing, Inc. Montclair $634,588.00 6 Moalej Builders, Inc. Sherman Oaks $918,670.00 Six bids were received and considered responsive, with Metro Builders & Engineers Group, Ltd. submitting the lowest responsive bid. The $448,339.60 bid is comparable to the engineer's estimate of $500,000. Based on the bids received, staff recommends award of this contract to Metro Builders & Engineers Group, Ltd. The bid package was divided to provide a base bid for the most essential work required to enhance safety with an additive alternative bid that, when combined with the base bid, would also improve the safety of the fencing. Since there is sufficient project funding for the entire scope of work, staff recommends awarding a construction contract for the base bid of $448,339.60 plus the Additive Alternate Two bid of $20,300, for a total contract amount of $468,639.60. The construction contract incorporates the low bid and is ready for approval (Exhibit 2). STRATEGIC PLAN ALIGNMENT Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities & Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City assets), Strategy B (equitably maintain existing streets and associated assets in a state of good repair so they are clean, safe and aesthetically pleasing for all users) and Strategy G (develop and implement the City's Capital Improvement Program in coordination with the Community Investment and Deferred Maintenance Plan.) ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. 2015 -111 was filed for these projects. 23A -2 Award Contract for Santa Ana Stadium Structural Concrete Repairs January 19, 2016 Page 3 FISCAL IMPACT The estimated total delivery cost of the project is $689,300, which includes construction, contract administration, inspection and testing, and contingencies (Exhibit 3). Funding is available in the Stadium Structural Concrete project (No. 16 -2656) in the FY 2015 -2016 Park Improvements District 2 In -Lieu Development account (No. 31213261- 66220) for the amount of $510,082, and the FY 2015 -2016 Capital Outlay and Cell Tower account (05113263- 66220) in the amount of $179,218. 2 P ed Mousavipour E ecutive Director Public Works Agency Ate'_i s" - - Gerardo Mouet Executive Director Parks, Recreation and Community Services Agency FM /EWG/TC Exhibits: 1. Location Map 2. Construction Contract 3. Cost Analysis APPROVED AS TO FUNDS AND ACCOUNTS: )41 •> Francisco Gutierrez Executive Director Finance & Management Services Agencyj� 23A -3 23A -4 l . w . .. I f r� LEGEND: p$,, ORA,, PROjEC,T AREA EXHIBIT 1 SANTA ANA cmr COUNCL PROJECT 16 -2656 f 7 VV A AGENDA DATE: SANTA ANA STADIUM J ig� 2= STRUCTURAL CONCRETE REPAIRS Y4tY.1C 56E�C PAGE i OF 1 EXHIBIT 1 23A -5 23A -6 CITY OF SANTA ANA EXHIBIT 2 Construction Contract PROJECT N0, 16 -2656 SANTA ANA STADIUM STRUCTURAL. CONCRETE REPAIR This CONSTRUCTION CONTRACT is made and entered into this 19 day of January 2016, by and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California, hereinafter referred to as "CITY" and Metro Builders & Engineers Group, Ltd., hereinafter referred to as "CONTRACTOR ". WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the Santa Ana Stadium Structural Concrete Repair, hereinafter referred to as the "Work of Improvement ", identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Documents," as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Project Plans • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the Work of Improvement the sum total amount not to exceed $448,339.60, as set forth and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A ". The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amomit of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. Page 1 of 23A -7 CITY OF SANTA ANA Construction Contract PROJECT NO. 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR 4. CONTRACTOR agrees to complete the Work of Improvement within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A ") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5, The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the Work of Improvement a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100 %) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100 %) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. CONTRACTOR shall, prior to the release of the perfonnance and payment bonds or the retention payment, furnish a warranty performance and payment bond equal to at least ten (10 %) percent of the final Contract price or $1,000, whichever is greater (Warranty Bond), 7. CONTRACTOR shall, upon project completion as a condition of project acceptance, furnish a Warranty Payment and Performance bond to be approved by the CITY, in the amount of Twenty -Five Percent (25 %) of the Contract price, to warrant the work done under said Contract Agreement against material or quality defects for a period of one year after acceptance by the AGENCY. s. CONTRACTOR shall, after award of this Contract, furnish. Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. // /% Page 2 of 3 23A -8 CITY OF SANTA ANA Construction Contract PROJECT NO, 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: MARIA D. HUIZAR Cleric of the Council APPROVED AS TO FORM: SONIA R. CARVALHO City Att �rne BY s_ Jbs� Sandoval of Assistant City Attorney CITY OF SANTA ANA DAVID CAVAZOS City Manager RECOMMENDED FOR APPROVAL: Trod Mousavipour, P.E. Executive Director, Public Works Agency CONTRACTOR: Metro Builders & -Engineers Group, Ltd. By:_ Title: Page 3 of 3 23A -9 CITY OF SANTA ANA PROPOSAL PROJECT NO. 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: Metro Builders & Engineers Group, Ltd. REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Item Description Qty Unit Unit Prire Amount 1 Mobilization (Not to —Exceed 10 %of Total Contract) 1 LS $NP90 $ 2,0 000 2 Temporary Supportt* 20 EA $ p9 0 I1 $ LID/ aoo 3 Parapet Wall Replacement 4 EA 9-0 1 4 Degraded Beam Replacement (6" avg. length) 4 EA $ 6� 0 V , 4 / �7Qa $ b 5 Extensive Beam Replacement (4' avg, length) EA $ �, �„q 0 ! $ 0 i] 8�/ 6 Concrete Spell Re pair w/ Exposed Reber (3" avg. depth) F2,400 SF $! 09 $� 5 b p D� ) Concrete Spalling (P' avg, depth)* SF $ �) $ L) �. ',V,0 J II Cracks Epoxy Injection* 360 LF $ 27,7t $ 9 I Galvanized Plate at Post (Complete -in- place) 120 EA $ r, I �' P —1 0 $ 7S f 10 Joint Seal with Backer Rod* 1,000 LF $ S DID $ y D 11 Temporary Construction Signs 4 EA El of 17 23A -10 CITY OF SANTA ANA PROPOSAL PROJECT NO. 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR Item Description Qty Unit Unit Price Amount 12 18 "- #3 Dowels w/ epoxy* 50 EA $ $ 1 13 Galvanized Post (1-I= 4' -31? 5 EA $�po $� r TOTAL BASE BID ADD ALTERNATIVE ONE; Item Description Qty Unit Unit Price Amount 14 Continuous U- Shaped Galvanized Plate 620 LF $ ��, $ ��/ (. DD j TOTAL BID ALTERNATIVE ONE ADD ALTERNATIVE TWO; Item Description Qty Unit Unit Price Amount 15 Complete Galvanized Chain Link Fence System 2,800 SF $ 1 ,L r J $ L-0 J� V ) TOTAL BID ALTERNATIVE TWO TOTAL BASE BID + ADD ALTERNATE ONE BID------------------------ - - - - -- $ TOTAL BASE BID + ADD ALTERNATE TWO BID----------------------- ------ $ TOTAL BASE BID + ADD ALTERNATE ONE + ADD ALTERNATE $ TWOBID----------------------------------------------------- ---------- ---- ----------- -- - --- The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add - alternate bid items. * The quantity for this bid item is shown for bid comparison only. This bid Item shall not be subject to the "25 %" limit as stated In Section 3 -2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to Increase or decrease the quantity of this item accordingly. BP -2 of 17 23A -11 CITY OF SANTA ANA PROPOSAL PROJECT NO. 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR t This bid item is considered a Specialty Item per Section 2 -3.2 of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within Sixty (60) working days for Phase I and Phase II after issuance of the Notice to Proceed. Immediately after contract award, contractor must be prepared to submit all required documents, structural calcs, and fabrication submittals. Preconstruction meeting shall tape place one week after Council award on January 19, 2016. The contractor shall commence construction on or before February 8, 2016. Phase I: Contractor shall complete all work on the west side of the stadium within the first 30 working days. Liquidated damages shall be $1,000 each day if not completed after the first 30 working days. Phase II: Contractor shall complete work on the east side of the stadium within 30 workings days after Phase I has been completed or sooner if Phase I has been completed before its 30 working days requirement. Liquidated damages shall be $1,000 each day if not completed after the last 30 working days. Deadline for completing all work shall be May 20, 2016. The liquidated damages amount in lieu of the amount specified in Subsection 6 -9 of the Standard Specifications shall be $1,000 per calendar day after the Final Completion of the 60 working days, including Bid Alternative(s) if awarded, as specified herein for contractor to achieve Final Completion of the entire work. Name of Firm Metro Builders & Engineers Group, Ltd. Signature of BIDDER Title President (if an individual, so state) BP -3 of 17 23A -12 1 'LIM -Irklili -MAH1l PROPOSAL PROJECT NO, 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR BIDDER'S STATEMENT BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent Construction Contract Agreement shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency Executive Director or his /her duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto. BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he /she will furnish AGENCY all required bonds and certificate of liability insurance within ten (10) business days or the funds, check, draft, or BIDDERS bond substituted In lieu thereof accompanying this proposal shall become the property of the AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond substituted In lieu thereof shall be returned to the undersigned. BIDDER understands that a bid is required for the entire work, the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. The BIDDER also certifies that the bid is a balanced bid. In accordance with Section 7028.15 of the California Btisiness and Professions Code, the undersigned certifies under penalty of perjury that thef regoing is true and correct. Name of Firm Metro Builders &E mers Group, Ltd . s'/ Signature of BIDDER Title President (if an individual, so state) (If a firm or co- partnership, state the firm name and give the names of all individual co- partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) 13P -4 or 17 23A -13 CITY OF SANTA ANA PROPOSAL PROJECT NO. 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR CONTRACTOR'S LICENSING and REGISTRATION STATEMENT The undersigned contractor, or corporate officer, declares under penalty of perjury that he /she and all his /her subcontractors are registered with the State of California Department of Industrial Relations (DIR), and that the following is true and correct. Contractor's Name: Metro Builders& Engineers Group, Ltd, Business Address: 2610 Avon Street Newport Beach CA 92663 Business E -Mall Fouad @metrobuilders.com; Shelly @melrobuilders.com; Estimating @metrobuilders.com Address: Telephone: 949 -515 -4350 X:23 State Contractor's License No. and Class: 597589 License Expiration Date: 0712016 State Dept. of Industrial Relations (DIR) Registration No.: ,/ State Dept. of Industrial Relatio sr(DIR) Registration Expiation Date: 0612016 Signed: Title: President BP-5 of 17 23A -14 CITY OF SANTA ANA PROPOSAL PROJECT NO. 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as California Code of Regulations, Title 8, Section 16,000, et seq., ( "Prevailing Wage Laws "), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. The undersigned certifies that the foregoing is true a Name of Firm Metro Builders &Eligineers Group, Lld. Signature of BIDDER Title President (if an individual, so BP -6 of 17 23A -15 CITY OF SANTA ANA PROPOSAL PROJECT NO. 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR OWNERSHIP AFFIDAVIT STATE OF CALIFORNIA ) COUNTY OF ORANGE i SS: CITY OF SANTA ANA ) Fouad Houalla , being duly sworn, deposes and says: ❑ INDIVIDUAL That he /she is the party making the foregoing proposal: ❑ PARTNERSHIP That he /she is a member of the co- partnership firm designated as: and who has been and Is duly vested with the authority to make and execute Instruments for the co- partnership by: who constitute the other members of the co- partnership. INCORPORATION That he is of: president a corporation which is making the foregoing proposal: ❑JOINT VENTURE That he is of: one of the parties making the foregoing proposal as a joint venture, and the he /she has been and is duly vested with the authority to execute Instruments for an on behalf of the parties making said bid who are: that such a bid is genuine and not collpsNe or sham, and has not in any manner sought by collusion to secure l advantage a nst the City of Santa Ana or any person interested in the proposed cbnjr�t, fo imself or ny other person. :.•- Subscribe and s orn to bef To me this 3oth day of November 20 16 Sign of le dministering Oath (Notary Public) z °r art BP -7 of 17 23A -16 SHELLY JEAN IRVINE Commission # 2016404 Notary Public - California n Grange County p My Comm. Expires Apr /. 20' g CITY OF SANTA ANA PROPOSAL PROJECT N0, 16 -2656 SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR KNOW ALL PRESENT that, Metro Builders & Englneers Ltd. American Contractors Indemnity company , as BIDDER, and , as SURETY, are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of Tan Percent of the total amount bid Dollars ($ 10"x° ), which is ten percent (10 %) of the total amount bid by BIDDER to AGENCY for the above - stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents, THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above - stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this 25th day of November ZD 15 BIDDER* Metro Builders &Tngineers Group, SURETY* Jose Hamilton, Attorney -in -Fact ` (�n`5ubscribed and sworn to before me see attached , 20._ Signature: Notary Public in and for the County of ,State of this -day of *Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address, and telephone number of authorized representative. BP -8 of 17 23A -17 FZFiVC120FATT , 111 �'. k I� VIIII tl, ll �l,�ln AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY ICNDIX? ALL N jFW BY TPIESE PRESF� assumed n�l `=�ooni�tute od}}�' TS l 11i tericanContractors lndemn yomp�iiy, a California corpplattoey,=C ras i 1' „odors Indemnt PCCC ru`at LIlitt t €ates Surety ColSpecia(tyTny� Ire. corporation >olLty,J Iff C�sm- pnias "), do bysr�ntn and appoint: Jeffrey W. Cavignac, James P. Schabarwn II, Jase Hamilton or Theresa Lau of San Diego California tls f;uejt d awfN Attomey(s) -in factt gagb in lt sepf°ate capacity if in tl7anl onle Igill 6 l � bove, with full power anti a41nna }� heronf�f wts name, laccgttltlexecuTe �knowled e a I dl, A Ianf, �I Bids recogmzauerunzlerFaldu °`° oe a�ssl'rurner is or co trac Lgllij ynh�tr irfade riders, ar l i YWt ®I�ti IslGyl r) l,nser� s of surety, Ilxooldhaw&h M — * ** *fifteen Million * * * *' &h, III III', Dollars =-�j erl�lty does not exceed - — — ( This Power of Attorney shall expire without further action on December 20, 2017. This Power of Attorney is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: _ Be it ResaFxar/ thatlhe President, any Vice President, an tstan -president, any Secretary or any Assrstant:S,eeretnry, shall be and is Hereby vested with full �pn�ei a�uthTnty-ttttpmnt any one or Igui} a s'b'lil s P �t� �l ey(s) -in -Fact to repmaem ii3a�L�lialf of the Company subtlRt.to theSollawrng li ll 'III J l loll ��''' ii V ill. 11111 - — " it °- W rtert]cyTfY7�COr may 5 -given full power r� i!tlYttttr♦ilir�ly t an n b r aY'he of and bn bohat [� nny �xtieule, ucicnowledge and d et�ati d aCl'bonds; recognizanecs, contracts, agreements or ul el uiTy and other, conditional or obligatory undekmgs, mcluding.any and all consents for the release of retained percentages and /or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability therounder, and any such instruments so executed by any such Attorney- in-Pact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. - Be n Resu]pdd,that=Eks signature of any authrr��,d- afficencL�eale Company heretoforell rhq�l e power e (IIII fl I &eI I'I IIII dI IIaI' I,'l�l �r t I 4 .. c power wer of attorney or ausim l��ny o €atto cdcfbaari �rte signature or ry)s n r_ W ce' ' — fF ca�— a- n-n— g binding upon the � spiel Which it t IN WLTNESS WHEREOF, TheCompanies have caused this instrument to besigned and their corp orate seals to be hereto affixed, this Ist day of December, .2014. - - AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY or eats UNITED SII AT SU' , C yI'1PANY U S- SPECIALTjIINSI —M NCLFCOMPANY — Y�� 1l W�vim' Y'rs q*' lil}KWyt �' _ n y . — ; IX �, 3 0l_ By. =t ” a If Daniel P. Aguilar, Vice President 1 �Aouwmenf to whie�i ¢hui coriticate is ati ��- .- 3taf"a -1i' !nty of Los Angeles- -SS: On this tat day of December, 2014 befe tut @u �l1111111111'�',I °,�uo-uuluu'r' a G Rbdriunez -Wone a notary ptiblio, personally., apps, the basis. efsatstaetery evidence to be the person who urns i a bscnbed to the w �i thF and that b 19s e��i�� ehl tl eII� �� t IleI person, or the at .Zc tfft17�FJAi PY OF PER7UR'SI II I l'P �111� 4' �h tat df California thai "— P✓LTNESS my hand and official seal. - Signahue � (Seal) z Mahae hatekson ,Assistant Seers /Wencaonnractors Indemnity Ca and U.S. Specialty Insurance Company, do hereby certify that the above and foreg said Companies, which is still in full force and effect; furthermorp,1I resolutions fill force and effect; . a -1 the — Dan P. Aguilaq Vice President of American nsorance- Company who proved to me on ,lodged to me that he executed the same in & erson acted exe _ t e and correct . ­77Z7 Commission i 2049771 t Notary public- California _ IAn9aI 0 un - �l� ul iiij Ill !� 20,2017 I�I II O ail l as tltlih' Company, United Sn,I& re�Company a true and .correct copy of a Power of Attorney, executed by Boards of Directors, set out in the Power of Attorney are in - Califomiif,this aye" Chalehson, Assistant Secretary .a A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San Diego �Sc � - V-i(AMI k- 1V0\'"1 Subscribed and sworn to (or affirmed) before me on this 25 _ day of November 2015 by Arnie Edstrom Notary Public _ proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. AMIE EDSTROM Commission S 1998094 a San Notary Public - California Diego County Signature (Sean Comm. Ex Tres Oct 29, 2018 OPTIONAL INFORMATION DESCRIPTION OF THE ATTACHED DOCUMENT (file or description of attached document) (Tllle or description of attached document continued) Number of Pages Document Date Additional information INSTRUCTIONS The warding of all Jumis completed in California after January 1, 2015 must be in the form as set Inch within this Juraf. Tham are no exceptions. If a Juraf to he completed does not follow this form, the notary must correct the verbiage by using a jurat stamp containing Ilia correct warding or attaching a separate juraf loan such as this one with does contain the proper wording: In addition, the notary must require an oath or affirmation from the document signer regarding the buffdulnoss of the contents of the document. The document must be signed AFTER the oath or affirmation. If Ilia document was proviousfy signed, R must be re- slgned In front of the notary public during the jurat process. • State and county Information must be the state and county where the document signers) personally appeared before the notary public. • Date of notarization must be the date the slgnons) personally appeared which must also be the same date the jurat process is completed. • Print the name(s) of the document signer(s) who personally appear at the time of notarization. • Signature of the notary public must match the signature on file with the office of the county clerk. • The notary seal impression must be clear and photographically reproducible. Impression must not cover text or lines. If seal Impression smudges, re -seal If a sufficient area permits, otherwise complete a different jurat form. Additional information Is not required but could help to ensure this jurat is not misused or attached to a different document. Indicate title or type of attached document, number of pages and date. • Securely attach this document to the signed document with a staple. 23A -19 CALIFORNIA JURAT WITH AFFIANT STATEMENT —i See Attached Document (Notary to cross out lines 1 -6 below) See Statement Below (Lines 1 -5 to be completed only by document signerfs], not Notary) Signature of Docwrlent Signer No. I Signature of Document Signer No, 2 (If any) State of California County of Subscribed and swOrr \to (of, affirmed) before me on this „A 6 _day of yU�i4G� 20M�,by Dale Month yea( Mr SH +per ELLY JEAN IRVINE Nerve signer m t.. ., Commission # 2018404 [ proved to me on the basis of satisfactory evidence I� "s� � y Notary Public - California A to be the person who appeared before me r Orange County 9 My Gnash txpires Apr 7, 2017 (and proved to me on the basis of satisfactory evidence to be the perso who appeared b e me.) Signature _ Si ue of Notary Public Place Notary Goal Above �q g pygg O TPt7N AL Though the Information below is not mquG'ad by larv, It may prove valuable to persons relying on the document and could prevent traudulont romoval and reattachment of this forof to another document Further Description of Any Attached Document 1Itle or Type of Document:,. Document Dan: __ ..... _ ....... _ --- .. .. _— ------ - Number of Pages: Signei(s) Othor Than Named Above: lop of thumb here Top of thumb here 02007 N.l.o.1 Notary Assndalinn• 93,90 Do Soto Ave., R.O. Box 2402• Chatsworth, CA 913132402• w Nationaftbryorg Item45910 Reorder Cell "Ioil Free 1.000- 8766627 23A -20 COST ANALYSIS PROJECT NO. 16 -2656: SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR Construction Contract $ 468,639.60 Contract Administration $ 38,133.00 Inspection and Testing $ 51,535.40 Survey $ 0.00 Contingencies $ 130,992.00 TOTAL ESTIMATED CONSTRUCTION COSTS $ 689,300.00 EXHIBIT 3 23A -21 23A -22