15/16 CAPITAL IMPROVEMENT
PROGRAM (CIP)
$68,074,534
Utility /
Drainage /
Street City Facility
Traffic
Lighting
Improvements
Improvements Improvements
$32,219,849
$15,979,653
$11,663,000$8,212,032
Street Improvements
12%
24%
Traffic Improvements
Utility / Drainage /
17%
Lighting Improvements
47%
City Facilities
2
MID-YEAR
FUNDING ALLOCATIONS
$36,747,900
ATP/HSIP GrantsCivic Center JPASurplusPending Grants
$16,130,900$590,000$2,162,000$17,865,000
Active Transportation/ Active Transportation/
Civic Center Joint Civic Center Joint Surplus ProjectsSurplus ProjectsGrants Pending Grants Pending
Highway Safety Highway Safety
Powers AgreementPowers AgreementSecurity LightingSecurity LightingApproval for 16/17Approval for 16/17
••
ProgramProgram
Storm Water Lift Station Storm Water Lift Station Synthetic TurfSynthetic TurfWarner Improvements Warner Improvements ––
••••••
Citywide Safe Routes to Citywide Safe Routes to
••
EvaluationEvaluationBike Trail ResurfacingBike Trail ResurfacingMain St to Oak St ROWMain St to Oak St ROW
••
School PlanSchool Plan
ReRe--caulking caulking the Plaza’s the Plaza’s of of Riverview/Windsor/Cabrillo Riverview/Windsor/Cabrillo Warner Ave / Flower St Warner Ave / Flower St
••••••
Edinger, Santa Ana, and Edinger, Santa Ana, and
••
Fountains and FlagsFountains and FlagsImprovementsImprovementsIntersection ImprovementsIntersection Improvements
Fifth Protected Bike LanesFifth Protected Bike Lanes
ADA improvements by City ADA improvements by City GIS DevelopmentGIS DevelopmentBristol St / Memory Ln Bristol St / Memory Ln
••••••
Lincoln Pedestrian TrailLincoln Pedestrian Trail
••
Hall Council ChambersHall Council ChambersAsset ManagementAsset ManagementIntersection ImprovementsIntersection Improvements
••
Flower Street Safety Flower Street Safety
••
Civic Center Sidewalk Civic Center Sidewalk Calle Cuatro SignageCalle Cuatro Signage
••••
EnhancementsEnhancements
RepairRepair
Euclid at Hazard Euclid at Hazard
••
Intersection Intersection
Cross Walk UpgradesCross Walk Upgrades
••
3
Traffic Signal Traffic Signal HardwareHardware
••
CIP PROJECT
SCHEDULE
4
CIP PROJECT
SCHEDULE
5
CIP PROJECT
SCHEDULE
6
CIP PROJECT
SCHEDULE
7
16/17 CIP PROCESS
FUNDING DATA
PUBLIC CIP BOOK
RECOGNITIONGATHERING
OUTREACHPREPARATION
Determine Available Determine Available Gather Project Data From Gather Project Data From Hold Several Public Hold Several Public Prepare 1Prepare 1--yr CIPyr CIP
••••••••
Funding for FY 16/17Funding for FY 16/17Various DepartmentsVarious DepartmentsOutreach Meetings Outreach Meetings Prepare 7Prepare 7--yr CIPyr CIP
••
Measure M Fairshare Measure M Fairshare Recognize Unfunded Recognize Unfunded
••••
Anticipated AllocationAnticipated AllocationProjectsProjects
Gas Tax Anticipated Gas Tax Anticipated
••
AllocationAllocation
8
16/17 FEATURED
PROJECTS
Street Light LED Water/Sewer
IP3Fiber Optics
ConversionBond
$80,000,000$TBD
$10,000,000$37,500,000
Pavement Management Pavement Management Study the Implementation Study the Implementation Purchase Street Lights Purchase Street Lights Water and Sewer Water and Sewer
••••••••
ProgramProgramof a Citywide Fiber Optics of a Citywide Fiber Optics from SCEfrom SCEInfrastructure Infrastructure
SMSASMSANetworkNetworkFinance Through Finance Through ImprovementsImprovements
••••
Bus Stop ImprovementsBus Stop ImprovementsReduced Rate SavingsReduced Rate Savings
••
Citywide Bicycle Master Citywide Bicycle Master Replace with LEDReplace with LED
••••
PlanPlanLower Energy Lower Energy
••
Sidewalk/ADASidewalk/ADAConsumption and CostConsumption and Cost
••
More Responsive More Responsive
••
MaintenanceMaintenance
9
CIP OUTREACH
PLAN
CIP Update and Outreach Presentation
City Council one-on-one meetings
February 16, 2016
May 2 –16, 2016
Sunshine Ordinance Budget Outreach
City Manager’s Proposed 16/17 Budget
Meeting
Work-Study Session
May 17, 2016
March 29, 2016
City Council Meeting Trial Budget &
Tentative Budget/CIP Ordinance
CIP
Adoption
June 7, 2016
April 19, 2016
Community Budget Hearings
Final Budget/CIP Ordinance Adoption
April 2016June 21, 2016
Preliminary Planning Commission
Start of the New Fiscal Year
Presentation
July 1, 2016
April 11 or 25, 2016