HomeMy WebLinkAboutASPLUNDH CONSTRUCTION CORP. Recording Requested By, Lc,2
And When Recorded Mail To: Recorded in Official Records, Orange County
Clerk of the Council,City of Santa Ana Hugh Nguyen, Clerk-Recorder
20 Civic Center Plaza,P.O.Box 1988 4�Jllll lI1l}Jllllll1i 11111 J1111 111I�Jlli 11111141�Ip7111111Jill�lll]l NO FEE
Santa Ana,CA 92702 9 3 0 I
* g R Q 0 0 9 8 4
2018000027618 9:05 am 01125118
63 413 N12 1
0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00
�.<z. ivc� vc i�f Y rc r.l Vtillt KS USE ONLY
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a
municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana,
California, 92701, is the owner of the property hereinafter described, that said owner has caused
p construction of HARBOR BOULEVARD CORRIDOR TRAFFIC SIGNAL IMPROVEMENTS
n under contract entered into on APRIL 19, 2016, with ASPLUNDH CONSTRUCTION CORP.
on which contract TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA is
w o surety. The property on which such work improvement was placed is in the City of Santa Ana,
y r r r
c z County of Orange, State of California, and described as Project No. 15-6828 located at:
A HARBOR BOULEVARD. The work improvement on said property was accepted as completed
a
on DECEMBER 22, 2017.
o CITY OF SAN A,A MUNICIPAL CORPORATION
�7
z
a Dated: 4 i I i g Principal Civil Engineer-Tyrone Chesanek
TITLE
-------------------------------------------------------------------------------------------
VERIFICATION
I, the undersigned, say: I am the City Engineer - Edwin "William" Galvez_of the City of Santa
Ana, California; I executed the foregoing Notice of Completion acting on behalf of the owner of
the property therein described; I make this verification on behalf of said corporation by
authorization of the City Council of the City of Santa Ana; I have read said notice and know the
contents thereof; and I declare under penalty of perjury that the facts therein stated are true.
Executed on a 1U l , at Santa Ana,Califo
(Signature of indivic�-�-P,
aring that the
contents of Noticection are true.)
THIS NOTICE OF COMPLETION MUST BE RECORDED WITHIN TEN(10)DAYS AFTER COMPLETION
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
APRIL 19, 2016
TITLE:
AWARD CONTRACT TO ASPLUNDH
CONSTRUCTION CORP. FOR HARBOR
BOULEVARD CORRIDOR TRAFFIC SIGNAL
IMPROVEMENTS (PROJECT NO. 15-6828)
(STRATEGIC PLAN NO. 6, 1G)
G.
GER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVEQ APO 1 9 2018
As Recommended 2 3ft
❑
As Amended
jJ
Ordinance on 1a' Reading
❑
Ordinance on 2 n Reading
C]
Implementing Resolution
0
For
Set Public Hearing
CONTINUED TO
FILE NUMBER
1. Authorize the City Manager and Clerk of the Council to award and execute a construction
contract to Asplundh Construction Corp., the lowest responsible bidder, in accordance with
the base bid plus Alternates I, II, III, IV, and V, in the amount of $1,170,984, for the term
beginning upon execution of the contract and ending upon project completion, for the Harbor
Boulevard Traffic Signal Improvements project, subject to nonsubstantive changes approved
by the City Manager and City Attorney.
2. Approve the Project Cost Analysis for a total estimated project delivery cost of $1,358,200,
which includes the contract base plus additive Alternates I, Il, III, IV and V; administration;
inspection; testing; and an authorized contingency of $116,896.
DISCUSSION
The proposed project supports the City's collaborative efforts with the cities of Garden Grove,
Fountain Valley, and Costa Mesa to implement traffic signal improvements along the Harbor
Boulevard Corridor (Exhibit 1). This project will reduce traffic congestion during peak hours,
while maintaining vehicle platoons at the speed limit at nonpeak hours. The traffic signal
improvements will include communication conduits, fiber optic cables, and hardware; traffic signal
cabinet and controller upgrades; ADA -compliant pedestrian push buttons and countdown
indications; and field monitoring equipment, such as vehicle detectors and CCTV cameras, to
support and maintain the new synchronization plan. Once completed, these improvements will
enhance traffic signal operations, improve traffic signal synchronization, and reduce traffic
congestion.
A Notice Inviting Bids was advertised on February 8 & 15, 2016, and bids were opened on March
1, 2016. The following is a summary of the bid invitations made and the bids received:
Contract Award For Harbor Boulevard Corridor
Traffic Signal Improvements
April 19, 2016
Page 2
Contractor Participation Data
Santa Ana contractors receiving notices
1
Contractors requesting bidding documents
15
Bids received
5
Bids received from Santa Ana contractors
0
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
BASE BID +
ALL
ALTERNATES
1
Asplundh Construction Corp.
Anaheim
$988,727.00
$1,170,984.00
2
Crosstown Electrical & Data, Inc.
Irwindale
$1,070,540.50
$1,282,019.50
3
DBX Inc.
Temecula
$1,192,964.75
$1,423,596.75
4
1 High -Light Electric, Inc.
Riverside
$1,338,480.00
$1,536,200.00
5
1 KDC Inc, dba Dynalectric
Los Alamitos
$1,422,331.00
$1,635,368.00
The advertised bid document was divided into a base bid and several alternates. The base bid
was used to identify the low bidder, and the alternates would be used in any combination to
maximize the use of the available project grant funds. Five bids were received and all five were
considered responsive. Asplundh Construction Corp. submitted the lowest responsive bid, with a
base bid of $988,727, plus a combined bid of $182,257 for all additive Alternates (I, II, III, IV, and
V), for a total project bid of $1,170,984 (Exhibit 2).
Since there are sufficient grants funds to complete the entire project, staff recommends awarding
a contract to Asplundh Construction Corp. in the amount of $1,170,984 (Exhibit 3). The
recommended scope of work and contract amount is comparable to the engineer's estimate. As
indicated in the Project Cost Analysis (Exhibit 4), the total estimated delivery cost of this project,
including construction, contract administration, inspection, testing, and contingencies, is
$1,358,200.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 — Community Facilities &
Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City
assets), and Strategy G (develop and implement the City's Capital Improvement Program in
coordination with the Community Investment Plan (e.g., neighborhood streets, traffic
improvements, park facilities, bike master plan, etc.).
Contract Award For Harbor Boulevard Corridor
Traffic Signal Improvements
April 19, 2016
Page 3
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the proposed project is exempt from
further review. Categorical Exemption ER No. 2014-82 will be filed for this project.
FISCAL IMPACT
The Project Cost Analysis estimates project expenditures of $1,358,200, which include the
construction contract, contract administration, inspection, and contingencies. Funds in the
amount of $124,210 are budgeted in the Measure M2 Street Construction Fund (Account No.
03217662-66220). Funds in the amount of $1,233,990 are budgeted in the Measure M2 Street
Construction Fund (Account No 03217663-66220). The funds will be expended according
budgeted funds in the current fiscal year and next fiscal year as shown in the table below:
Contract Period Fiscal Year Account No Amount
FY 2015/16 03217662-66220 $24,842.00
03217663-66220 $246,798.00
FY 2015/16 $271,640.00
FY 2016/17 03217662-66220 $99,368.00
03217663-66220 $987,192.00
FY 2016/17 $1,086,560.00
TOTAL:
Fred Mousavipou
Executive Director
Public Works Agency
FM/EWG/TC/MO
Exhibits: 1. Location Map
2. Bid
3. Construction Contract
4. Cost Analysis
$1,358,200.00
APPROVED AS TO FUNDS AND ACCOUNTS:
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
I
FOUNTAIN VALLEI. 0
i • i '
O SANTA ANA
1 1 1 I
1 1
0 i
GARXN G V6' •
1
• ' • i
� 1
1 1 1 • 1
1 1 I
O LEGEND i
I
' Agenfy • i
1
1
i O ' •
� 0 i • F�r»enw i • i
1 I 1
Q • C'",Srol COSTAWESAil
Q tyrta Ane
SANTAANA I '
� ' 1 I
1 0
1 1
i PROJECT
1 Q LIMBS ----� i
I I 1
I 1 1 1
1 I I • '
1
� •
It
1
FOUNTAIN VALE E* i
1 • 1
I
[A TAA A
� City Council Project No. 15-6828: Harbor Boulevard Corridor Traffic
P� Agenda Date Signal Improvements
April 19. 2016 las part of Harbor Blvd Traffic Signal Synchronization
Project)
Exhibit 1
CITY OF SANTA ANA EXHIBIT 2
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
The undersigned bidder declares that they have carefully examined the location of the
proposed work, that they have examined the Contract Documents in its entirety and hereby
proposes to furnish all material and do all the work required to complete the said work In
accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set
forth in the following schedule:
Item
Description
City
Unit
Unit Price
Amount
City of
Santa Ana
1
Traffic Signal Modification at Harbor Blvd
1
Li
$ �j
and 5th St
.�
2
Install Type 334 Communication Cabinet
1
L,;
pa
$ .Q,
/i
$ .�I(tJ. 0
Assembly
)
3
Install 2"PVC Conduit
530
LF
$ It
4
install 3" PVC Conduit
3200
LF
$ 3A"t-
$ j * i* "`—,
5
Install 4" PVC Conduit
so
LF
$
6
Install No. 6 Pullbox
16
EA
7
Install No. SE Pullbox
3
EA
$+r,'(),i�
$f Gj 26J
B
Install Type E Loop Detector
26
EA
bo 0,-
V
0
Install Detector Lead-in Cable
16120
LF
$ 1,
$ � �
10
Replace Pedestrian Head Assembly with
Countdown Head
32
EA
$ytJ!�
$ Cry
am
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard CorridarTraffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
City
Unit
Unit Price
Amatint
11
install Audible Pedestrian Signal (APS)
LS
$
$ 10
System
12
Install CCTV System
3
EA
$ A 81 too, 0—
13
Replace Wireless System
2
EA
q0b,
....... . ......
$ 1-3 M
14
Install 48 Strand SMFO Cable
500
LF
00,
15
Install 24 Strand SMFO Cable
5000
LF
$
$ m co
16
install 12 Strand SMPO Cable
700
LF
17
install CATSP (Outdoor Rated) Cable
Soo
LF
$
18
Fusion Splice 1 Strand Single Mode Fiber
336
[A
Optic Cable
19
Install Fiber Optic Splice closure
4
LS
Za
Install IP Communication System at Harbor
I
EA
Blvd and Hazard Ave
21
Install IP Communication Systern at Harbor
1
EA
$
Blvd and 5th St
22
Install IF Communication System at Harbor
I
EA
$
Blvd and 1st St
23
Install IF Communication System at Harbor
I
EA
Blvd and McFadden Ave
24
Install IP Communication System at Harbor
EA
Blvd and Warner Ave
25
Install IP Communication System at Harbor
I
EA
s,-
LID
Blvd and Segerstrom Ave
26
Install IP Communication System at Harbor
I
EA
$ q6b�o;�,
JOU
Blvd and Garry Ave
27
Install IF Communication System at Harbor
I
EALJ
�7tY
Blvd and MacArthur Blvd
28
Remove Wireless System
2
EA
vs
$
CID
9w
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
Qty
Unit
Unit Price
Amount
29
Remove Video Detection System at Harbor
1
L5
$ 0 f
o
$
Blvd and Warner Ave
30 Pothole For Utility Not Shown on plan 10 EA $ "!U 0, $ V�� U� ,ww,
TOTAL SANTA ANA BID $ pjlo I-G�,Ov�
City of Garden Grove
31
Cabinet Upgrade
1
EA
$ qf„(•
$ G(,�W
32
Furnish and Install EVP Unit
17
EA
33 Furnish and Install EVP Phase Selector S EA
34 Furnish and Install EVP Cable 2745 LF
$—f $
35 Furnish and Install Pedestrian Push -Button 50 EA
11j1%f
Assembly
1 ftl
36 Furnish and Install Pedestrian Countdown 10 EA
$ $
Module
Famish and install Video Detecticn Syst.m� 6 EA
37
$ `p�' { C� $
u
TOTAL GARDEN GROVE BID
S
City of Costa Mesa
Remove and salvage existing traffic signal
38 1 EA
$ $ �/ _
1/a
cabinet. Remove foundation complete.
e�tl�.`r�
a?,
38
Remove and salvage existing traffic signal
5
EA
$j�T
cabinet
4Q
Remove and salvage existing UPS cabinet
4
EA
$ �,.
$
and assembly
41
Furnish and install Type P cabinet on new
foundation
1
EA
$
$ '. 90.
Oral
42
Furnish and install Type Pcabinet on
5
EA
It
9 r7 ;ra
__existingfoundation
f
BP -3
B P-4
CITY OF
SANTA ANA
PROPOSAL
PROJECT
NO. IS -6828
Harbor Boulevard Corridor
Traffic Signal
Improvements
(as part of Harbor Blvd Traffic
Signal Synchronization
Project)
Item
Description
Qty
Unit
unit Price
Amount
43
Furnish and install UPS Cabinet and UPS
4
EA
assembly
44
Relocate existing traffic signal controller
6
EA
assembly to new controller ca binat
45
Furnish and Install new CCTV camera
10
EA
01�
system
46
Remove and salvage existing CCTV camera
I
EA
L'o,
47
Furnish and Install new pedestrian push
76
EA
button assembly
48
Furnish and install new pedestrian
58
EA
countdown module
49
Remove existing pull box and Furnish and
I
EA
10Oa
$
Install 46E Pull Box
so
Remove existing pull box and Furnish and
2
EA
00
$ pa
$
Install 95 Pull Box
51
Furnish and Install #6E Poll -Box
5
EA
$
$ IV
52
Furnish and Install HIS Pull -Box
3
EA
53
Furnish and Install new 3" Conduit
I 1175
LF
^'
.... ... ...
I 3A
54
Remove existing SIC Cable
5090
LF
$
55
Furnish and install 12 Strand SMFO Cable
78S
LF
'10
9"
56
Furnish and Install 24 Strand SMFO Cable
4110
LF
$
57
Furnish and Install Splice Enclosure in 46E
pull box. Fusion splice and terminate all
a
EA
$
fibers per fiber schematic.
1.. ... ... ... .... .. .
58
Fusion splice and terminate new fibers in
2
EA
11 so
existing splice canister per fiber schematic
59
Terminate fiber drop cable in fiber patch
3
EA
panel
60
Terminate fiber distribution cable in fiber
I
EA
patch panel
B P-4
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
Jas part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
Qty
Unit
Unit Price
Amount
61
Furnish and install new fiber patch panel,
All fibers are to be terminated per fiber
7
EA
W
o0
1 Furnish and install Video Detection System I EA
schematic.
TOTAL ALTERNATE BID#2
$ 0?o
Alternate Bid #3 — Merrimac Way at Harbor Blvd Traffic Signal Upgrade — City of Costa Mesa
Item Description Qty Unit
62
Furnish and Install #10 tracewre
5505
LF
�O
00
63
Re-pull distribution cable from controller
5
I 1
EA
90, !:s
�wo
cabinet to #6E Pull Box
TOTAL COSTA MESA BID
$ 411 q " I
TOTAL BASE BID
7-
(SANTA ANA+GARDEN GROVE+COSTA MESA)
Alternate Bid Items
Alternate Bid #1— Harbor Place at Harbor Blvd Video Detection — City of Garden Grove
Item Description City Unit Unit
In Price Amount
Detection Furnish and Install Video wet ctionSirilem 1 FA
$
TOTAL ALTERNATE BID#1
$
Alternate Bid #2 — Cardinal Circle at Harbor Blvd Video Detection — City of Garden Grove
Item Description Qty Unit
Unit Price Amount
1 Furnish and install Video Detection System I EA
TOTAL ALTERNATE BID#2
$ 0?o
Alternate Bid #3 — Merrimac Way at Harbor Blvd Traffic Signal Upgrade — City of Costa Mesa
Item Description Qty Unit
Unit Price Amount
Remove and salvage existing traffic signal I EA
cabinet. Remove !R!u�121ete.
$J qjq.
Remove and salvage existing UPS cabinet I EA
--=l --
$ W
assembly
Furnish and install Type P cabinet on new 1 EA
boo $ Z �60' u-0
foundation
BP -S
CITY OF SANTA ANA
PROPOSAL
PROJECT' NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
4
5
Furnish and Install UPS Cabinet and UPS
assembly
Relocate existing traffic signal controller
assembly to new controller cabinet
Description
EA00
EA
Unit
Unit Price
6
Rewire Intersection
1
Ls
00
1 00
7
Remove existing pull box
I
EA
$
8
Furnish and Install No, 6E Pull Box
2
EA
$
Furnish and Install new 2" conduit
20
LF
$ J;
$
I a-
Furnish and Install new 3' conduit
220
LF
$
11
Furnish and Install new 4" conduit
40
LF
oto, 1-6
12
Terminate fiber drop cable in Aber patch
I
EA
$ /0
carrel
Furnish and Install 410'rrace Wire
260
LF
ffII13
$
14
Re-pull distribution cable from controller
I
EA
cabinet to 06E Pull -Brox
TOTAL
ALTERNATE
Blit#3
$
Alt, -mat,, Bid 44 - Wilson Strcet at Harbor Blvd Cabinet Upgradas - City of Costa M2Sa
Item Description MY Unit Unit Price Amount
Remove and salvage existing traffic signal I EA $ 500 ,.9,0 $500.40,
cabinet.
Furnish and Install Type P cabinet on A J
2 1 EA , q5D,
existing foundation
3 Relocate existing traffic signal controller I EA $ gw. 60 $ I SA 00
assembly to new controller cabinet
TOTAL ALTERNATE BID#4 $ `v. 0
Alternate Bid #5 - Hamilton Street at Harbor Blvd Cabinet Upgrades - City of Costa Mesa
Item
Description
CRY
Unit
Unit Price
Amount
Remove and salvage existing traffic signal
I
EA.
cabinet. Remove foundation complele,—
BP -6
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Z
Furnish and Install Type P cabinet on new
1
EA
''
$ 1 ��,
9/ 00
$ r•
foundation.
n ,
3
Furnish and Install UPS cabinet and UPS
1
EA$
$ C
' D} D --
Assembly
4
Relocate existing traffic signal controller
1
EA
$ r+OQ
J
assembly to new controller cabinet
TOTAL ALTERNATE BREI#5
-0
S ai" - • 0
TOTAL Base Bid plus Alternate 1,2,3,4 & 5
plus all Alternate Bid items.
The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves
the right to Increase or decrease the quantity of this item accordingly.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total contract base bid
amount shown above, within eighty (80) working days after the commencement date stated in
the Notice to Proceed.
If Alternate Bid#1 is awarded, five (S) working days will be added to the working days assigned
to complete the contract base bid items,
If Alternate Bid#2 is awarded, five (5) working days will be added to the working days assigned
to complete the contract base bid items.
If Alternate Bid#3 is awarded, twenty (20) working days will be added to the working days
assigned to complete the contract base bid items.
If Alternate Bid#4 Is awarded, ten (10) working days will be added to the working days assigned
to complete the contract base bid items.
lam
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic. Signal Synchronization Project)
if Alternate Bid#5 is awarded, twenty (20) working days will be added to the working days
assigned to complete the contract base bid items.
The liquidated damages amount in lieu of the amount specified in Subsection 6-9 of the
Standard Specificatt ns shall be 5,000 per calendar day,
NameafFirm 2i�LlJ.dl(il sr aC.T'71ij eLC:_ --
Signature of BIDDER
Title Grego W. Holman, Vice President
(if an individual, so state)
MM.
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
M-MANW.114
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and
the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the
Council with her signature and official seal noting hereon the action of approval of the Council,
signed by the Public Works Agency Executive Director or his/her duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its
execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited
with the United States Postal Service properly addressed to the BIDDER with the correct
postage affixed thereto,
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
darnages actually suffered Is difficult to ascertain; otherwise said funds, check, drafts, or
BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set
forth In the bid schedule are solely for the purpose of comparing bids, and that final
compensation under the contract will be based upon the actual quantities of work satisfactorily
completed. The: BIDDER also certifies that the bid is a balanced bid.
in accordance with Section 7028.15 of the California Business and Professions Code, the
.. _._ _... _. undersigned certifies under penalty of perjury that the foregoing Is true and correct.
Name of Firm
Signature of BIRDER
K -P
Title Gxegor'y VW. Holman, Vice President
(if an individual, so state)
(if a firm or co -partnership, state the firm name and give the names of all individual co-partners
composing the firm. If a corporation, state legal name of corporation, and names of President,
Secretary, Treasurer and Manager, thereof.)
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synch ran ization Project)
CONTRAC'TOR'S LICENSING and REGISTRATION 51"A f, 7 .IVIENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she
and all his/her subcontractors are registered with the State of California Department of
Industrial Relations (DIR), and that the following Is true and correct.
Contractor's Name:
Business Address:
Business E -Mail
Address:
Telephone: / ,%z (;�`i to /
State Contractor's License No, and Class: rlMl LL 0
License
Expiration Date: f 6a j
State Dept. of Industrial Relations (DIR)
Registration No..
State Dept, of Industrial Relations (DIR)
Registration Expiratiop Date:
Signed:
Title:
W, Holman, Vice President
RP -10
11
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor Is aware of the requirements of California Labor Code Section 1720, at seq., as well
as California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"),
which require the payment of prevailing wage rates and the performance of other
requirements on "public works" and "maintenance" projects, since the services are being
performed as part of an applicable "public works" or "maintenance" project, as defined by the
Prevailing Wage Laws, and since the total compensation Is $1,000 or more, Contractor agrees
to fully comply with such Prevailing Wage Laws,
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at
the commencement of this Agreement. Contractor shall make copies of the prevailing rates of
per diem wages for each craft, classification or type of worker needed to execute the services
available to interested parties upon request, and shall post copies at the Contractor's principal
place of business and at the project site.
Contractor shall defend, indemnify and hold the City, Its elected officials, officers, employees
and agents free and harmless from any claim or liability arising out of any failure or alleged
failure to comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing Is true and correct.
Name of Firm
Signature of BIC
Title
'- -
(if an individual, so state)
BP -1l
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
OWNERSHIP AFFIDAVIT
STATEOF9,At1d=IRiA Pennsylvania
COUNTY OF 5tRtIAW Montgome}t5¢
CITY OF SANTA ANA j
Gregory W. Holman , being duly sworn, deposes and says:
CJ INDIVIDUAL That he/she Is the party making the foregoing proposal:
Q PARTNERSHIP That he/she Is a member of the eo•partnership Firm designated as
and who has been and is duly vested with the authority to make and execute
instruments for the co -partnership by:
``y�� /// who constitute the other members of the copartnership,
(4fORP� ORATION That he is of: J
J Vice President
a corporation which is making the foregoing proposal:
E]JOINTVENTURE That he is of:
one of the parties making the foregoing proposal as a joint venture, and the he/she has
been and is duly vested with the authority to execute Instruments for an on behalf of
the parties making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by
collusion to secure any advantage against the City of Santa Ana or any person interested in the
proposed ontract, for himse or any other person.
Signature Of BI Gregory H0 Vice President
Subscribd and sworn to before me this day ofT o 20.LP
Signature o Icer Adm' is ering Oat a blic)
=W1,
OF PES„ NIt�$®VANIa
IAL SEAT.
LEY, Notary Public
, Montgomery CountyExpires igg 9j d01g
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
l i1y7I� '�
KNOW ALL PRESENT that,
6gplundh Construction Coro as BIDDER, and
Travelers Casualty and Surety CQmnany of America as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of
Ten Percent (10%) of Amount Bid Dollars ($ - ----.---10%---------), which is ten percent (10%)
of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a
bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is accepted and
a contract is awarded and entered into by BIDDER in the manner and time specified, then this
obligation shall be null and void, otherwise it shall remain in full force and effect in favor of
AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
22nd day of Febru__-,__,_ D1_, 2016,
VGV LF'jp 1). L11:C1 Aatl L. JCI:LCLQiy
SURETY*
Travelers Casualty and Surety Company of America
Myisha
Subscribed ands rn to before me Nlanmi HnrriG this 22nd day of
February 20 16,
Signature:
Notary Public in and for the County of Harris State of Texas
*Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address,
and telephone number of authorized representative.
e
NAOMI HARRIS BP -13
Notary Public STATE OF TEXASy commission Expires July 30, 2019
POWER OF ATTORNEY
T' `1 /�•"°VELE'(� "S J Farmington Casualty Company St, Paul Mercury Insurance Company
Fidelity and Guaranty Laurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, lite. Travelers Casualty and Surety Company of America
St, Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
St. Paul Guardian Insurance Company
Attorney -In Fact No. 230387 Certificate No. 006436949
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Patti Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company are corporations duly organized under the taws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a
corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the
laws of the Suite of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint
Michael J. Herrod, Wendy W. Stuckey, Lisa A. Ward, Donna L. Williams, Anoop Chawla Adlakha, Lupe Tyler, Nancy Thomas, Vanessa Dominguez,
and Myisha Jefferson
of the City of HOU5iOtl _, State of Texas , their true and lawful Attorney(s)-in-Fact,
each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recoguizances, conditional undertakings and
other writings obligatory in the nature thereof nn behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of
contracts and execudns or guaranteeing bonds and undertakings required Or permitted in any ¢moons nr proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 21st
day of January _.__ 2016
Farmington Casualty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc,
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
Travelers Casualty and Suety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
G4 pal ` o-yy Y�R£dkv. PO`Y,N I.YSG9 f1Jpy: 6VA"q'4a'. W1YPH Q 4" x^..AAY 4yC
A PO `� pORg1 Cid.
1977 wcaaFoasrto e .a. +�° •>'r+' I`°0 ._ ' i a HARTFORD. g
Yin° t•�$ a' 1951 4" ,,� 35cm,tlaf SRL zt ye coxa. e�, t
State of Connecticut
City of Hurford ss.
By:
*Rbe/1 Ran¢ -y, . enior Vice President
Gnr this the 21st day of Janna 2016 , before me personally appeared Robert L. Raney, who acknowledged himself to
be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul
Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers
Casualty and Surety Company of America, and United States Fidelity mill Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing
instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
�.T�T
In Witness VVlrereof, I hereunto set my hand and official seal y' W�01 -
My Commission expires the 30th day of June, 2016. # pGBI�� ylr Mane C. Tevcauh, Notary Public
Ct � A�,�.,4�'
58440-8-12 Printed in U.S.A.
OF ATTORNEY IS
TRAVELERS CASUALTY AND SURETY COMPANY OF AMWCA
HARTFORD, CONNECTICUT 06183
FINANCIAL. STATEMENT AS OF DECEMBER 31, 2014
CAPITAL STOCK$ 040,000
'ASH AND INVESTED CASH
$ 127,167,2$3
UNEARNED PREMIUMS
$ 866,349,712
IONDS
3,411,430,037
LOSSES
660,189,443
ITOCKS
326,951,879
LOSSADJUSTMENT EXPENSES
356,911,823
NVESTMENT INCOME DUE AND ACCRUED
45,277,108
COMMISSIONS
34,142,046
ITHER INVESTED ASSETS
4,010,416
TAKES, LICENSES AND FEES
11,834,868
'REMIUM BALANCE$
200,9$2,904
OTHER EXPENSES
40,097,405
IET DEFERRED TAXASSE{"
62,639,644
CURRENT FEDERAL AND FOREIGN INCOMETAXES
24,933,660
tEINSURANCE RECOVERABLE
17,397,751
REMITTANCE$AND 11 EMS NQTALLOCATED
11,062,692
MOURITIES LENDING REINVESTED COLLATERALASSETB
0,224,8011
AMOUNTS WITHHELD I RETAINED BY COMPANY FOR OTHERS
49,744,886
IECEIVABLES FROM PARENT, SUBSIDIARIES AND AFFILIATES
9,057,199
RETROACTIVE REINSURANCE RESERVE ASSUMED
853,430
ITHER ASSETS
3,078,655
POLICYHOLDER DIVIDENDS
7,376,688
PROVISION FOR REINSURANCE
3,418,805
ADVANCE PREMIUM
1,327,118
PAYABLE FOR SECURITIES
4,590,700
PAYABLE FOR SECURITIES LENDING
8,224,694
CEDED REINSURANCE NET PREMIUMS PAYABLE
28,084,142
ESCHEAT LIABILITY
1,'136,046
OTHER ACCRUED EXPENSES AND LIABILITIES
421,157
TOTAL LIABILITIES
_ $ 2.1 0,576,190
CAPITALSTOCK
$ 91480,000
PAID IN SURPLUS
433,803,760
OTHER SURPLUS
1,674,378.716
TOTAL SURPLUS TO POLICYHOLDERS
$ 2,114.657475
OTALASSETS
$ 4,225,233,605
TOTAL. LIABILITIES & SURPLUS
4$.4,226.2316(55
iTATE OF CONNECTICUT )
AUNTY OF HARTFORD 155,
ATY OF HARTPORD
61CRAEL J. DOODY, BEING DULY SWORN, SAYS THAT HE IS SECOND VICE PRESIDENT, OF TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA,
LND THAT TO THE BEST OF HIS KNOWLEDGE AND BELIEF, THE FOREGOING IS ATRUE AND CORRECT $TAI EMENT OF l'HE FINANCIAL CONDITION OF SAID
JOMPANY AS OP THE 31ST DAY OF DECEMBER, 2014,
1USSCRIBED AND SWORN TO BEFORE ME THIS
9T,I DAY OF MARCH, 2015
-
SECOND VICE PRESIDE l/` ^ � _
MOTAR7P6RL
SUSAN M.
.VTEISS�,EI)L+IL
Notary Pu67ic
MyCom+tllulon ExpiresNovem6er3P, 2017
STATE OF PENNSYLVANIA
COUNTY OF MONTGOMERY
On this 23rd day of February, 2016, before me came George D. Licci to me
known, who, being by me duly sworn, did depose and say that he resides in Jamison, PA
that he is Asst. Secretary of Asphutdh Construction Corp. The corporation described in
and which executed the forgoing instrument as principal; that he knows the seal of said
corporation; that the seal affixed to said instrument is such corporate seal; that it was so
affixed by order of the Board of Directors of said corporation and the he signed his name
thereto by like order
Subscribed and sworn to me before this 23rd day of February, 2016 A.D.
L
Notary Publi : regory K. Fuller
My commission expires: 1/29/17
i
STATE OF CALIFORNIA
SAN FRANCISCO
Amended
Certificate of Authority
THIS IS TO CERTIFY, Thal, pursuant to the Irrsmruure Cole of the Pate of California.
Travelers Castialty mnl Surety Company of'llmerlca
aj'fhartlor<l. Comfecricut, organised under tha lams of Connecticut, subieer to its Articles of'htcnrporcuiai or
athar firudoutcrrkt/
organizational elorwoanis, is herckv atuhorized to woosetet within this State, subject Io all
pro visions of this C'artlf7eate, the follorrirtg classes of 6esurmreer
Fire, Marine, Surety, Disability, Plate Glass, Liability, Yorkers' Compensation,
Common Carrier Liability, Boiler and Machinery, Burgiarv, Credit, Sprinkler,
Team and Vehicle, Automobile, Aircraft, and Miscellaneous
as surly masses are naw or amv hereafter be defined in the Insurance Lars oftheoCColiiorniu-
THIS CERTIFiCATr, is evresslp conditioned upon the hooter hereof now and here(jer being w jdl
roopltance with all, and not in ciotation of arpt of the applicable laws and lawful roqulrements made nutter
mithorim of the tans 0,0110 Stare of C'ahforufa as long as such laws or requG•eurenrs are in effect and apntirahle,
and as wish hn, s and r equiremenm now are, or rump hereafter be chau,,g,ed or anantlad.
IN WITNESS WHEREOF, effective cis of the ist (lay of Su1v, 1997, 1 have
haraunro set n{v /rand and caused nm gfjictal sero to be gjfrsed rho 16th
dqv of hale, 1997.
Fee 592,00 Chuck Quackenbush
Inivnocc Gnmrixsineur
Ree. No,
Filed 5:38197 hr Victoria S s'idhow
(3epu}v
Certi ftcariat
1. the undersignad htsura ce Commissioner of the State of Cal ybruia, to hervim Bern , that I ham
cwnpared rhe above cohv of Certlf`trate ofdrahoriry n with tha duplicate of o•igmal now on fie in niv ojflccr, arta
that rite stone is a frit, arms, (nal correct transcript thereof. and ewf'the whole of said dupli(¢ae, and sedd
(ordtirate ofAurhtoriry) Is now m.irtf(farce and efj vr.
IN w ITINIISS 1YHHREOF, I have hefratato ret ntr hand wid cunsed my o/tidal
seal to be eyed this 31v daP ql Disvember, 2007.
Steve Poizner
tnmr+m:rc (oourssloutr
It,D4a
Pauline W. Ittdrea
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15-6828
Harbor Boulevard Corridor TrafflcSignal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
PRT OF SUB-CONTRA(;TORS
Section 4100 r t. seq. of the Public Contract Code requires listing of all subcontractors with the laid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: MYS of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: "f,°ru of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below.
{///I �I
Name 1. 42e i—rilw—fl.1 a U� i o�
LSA t d3 Name
License #/Exp•
'731.5oq
_
_ Lic nse#/Exp.
DIR Reg.#/Exp.
.�-Q-QakgG
DIR g.#/Exp.
Location
saes �aaa� sr.ktuea
L Ie Looatio
Phone
�
Phone
Type Of Work
LvR c72t uul
Type Of W k
Amount $
(3, 000)
Amount $
Name SLr eCnwul�-I t �uvw7 Name
License #JExp. 2�445� Licens
DIR Sieg. #/Exp. DIR Re
Location Jap ar4.,o,a f r JJ OaAD ea Locatl
Phone ryl 0^1a5_5T6t�Pfsonu
Type Of Work ilg V1 o ra w Type d
Amount $ -S.I.UDp�',_•.•..• .•._•_.® Amou
Name Name
License
DIR Reg.
Location
Phone
e #/Exp.
g. #/Exp.
on
Of Work
nt $
Type Of Wo
License 4/Exp.
DIR Reg. #/Exp.
Location
Phone
Type Of Work
Amounf ,,,' y Amount S
Signa ure of idder
13P- 14
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which BIDDER has performed similar work within the past three years.
e and Address of Owner,
Name an fa ephone Numbe
Contract Amount
z.
Name and Address of owner.
of person familiar with project,
Name and Telephone Number of person
Contract Amount
3.
Name and Address of owner.
of Work
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work
Date Completed
Date Completed
Hate Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties
from whom BIDDER Intends to procure insurance and bonds.
1. acta; it
BP -15
p
� N
S
r
ro
Erho a
a
Qq
d
j' .�v
=�
=
F
cr
(nD
Lh
x
a
�
R
00co
n
p
0
NJ
w
o
0
o
cu
o
o
c
o
g
o
�
_
N
'O
21
W
=rry
Vt
v
Cl QO
n
r O
m
i.n Oa @
fD
iD
fp
)
� � Q
m
N m
b
a S2a
-
b °-i' a
N
®
O
n
G
G
N
at
(D
ry
^
n
D
a
o�ti' rt
^ri
O N
n
a
v
at
n
a
_
o_
a•a
'O'^
n
N
n
rt
7
O
�
n
�
kJ:) -n
0
Q
u@+ f7
(D
a! Ty b
tNn -1 c
O fl
n
�
W
N
IT
@
m
ro J
n'
n
v
RZ (D
a.
m
sUl�
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
The following are the names, addresses, and telephone numbers for IUBU public agencies for
which the BIRD R r b ntrac r has performed Traffic Signal and Intelligent Transportation
System (ITS) Installation and/or modification in the past 5 years,
1.
Name
Name and Teleph
Contract Amount
2.
Name and Addres
Owner.
of owner.
of person familiar with project.
Type of Work
Name and Telephone Number of person
Contract Amount
3. _
Name and Address of owner.
Type of Work
Name and Telephone Number of person famillar with project.
Contract Amount
Type of Work
Date Completed
Date Completed
Gate Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties
from whom BIDDER intends to procure Insurance and bonds. �s nn
r (? sur+L� d,v,,Q rZ�t V l'S • n � Fre e
L sysexY J�,�L
I
ASPJLT.. NDH 'TREE EXPERT CO.
708 Blair Mill Road
Willow Grove, PA 10090-1784
The above corporate headquarters address should nod be used for billing purposes, All tnvolues andlor sialements Mould be forwarded to
the individuul regional officos who conductad business with the vendor.
ORIGINATED: August, 1928 FEDERAL ID NUMBER: 23-1277550
INCORPORATED: Deoember 26, 1945 DUNS NUMBER: 00-791-1753
OFFICERS: George E. Graham, Jr., President
Joseph P. Dwyer, Secrotaryrrreasurer
TYPE OF BUSINESS: Vegetation management and right-of-way clearing for utility companies
BANK REFERENCE:
PNC Bank
Credit Reference Department
MS F6 -F166 -D4-9
4th Floor
8600 Tinicum Boulevard
Philadelphia, PA 19153
TRADE REFERENCES:
Southco Industries Inc.
Atin.: Credit Dept. / Carolyn Grant
1840 East Dixon Boulevard
Shelby, NO 28152
voice (800)331-7655
fax (704) 482-1460
Astec Industries, Inc,
........ ........
210 Inverness Center Drive
Birmingham, AL 3524.2
contact: Scott Reed
voice (205) 980-6978
fax (205) 406-6063
W.W, Grainger Inc.
phone (847)647-2060
account# 865856645
MISCELLANEOUS:
FAX NUMBER: (215) 749-8191
EMAIL: pnc_credit investigations@pnc.com
ACCOUNT MANAGER: Eric Hersom
I-lusgvnrna Forest 8 Garden Co,
9335 Harris Comers Parkway
Charlotte, NC 28269
voice (704) 597-5000
fax (704)599-4307
Terex South Dakota Inc.
Alin.: Sarah Corey
500 Oakwood Road
Watertown, SD 57201
voice (505) 884-3830 (Sarah C,)
fax (605)882-5579
Relationship Manager
Corporate Banking
Dow AgroSciences LLC.
Indianapolis, IN
httos: //creditrefaf enpgz4ow.coroI
Customer Code: 00029267
Standard Register
Arlene Avers, Supervisor
Credit Services Team
600 Albany Street
Dayton, 01-1, 45417
voice (937) 221-1000
TOTAL EMPLOYEES: 33,000+ 41 Years at Blair Mill Road location
=12015
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
NONCOLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
in accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine
and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any
other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired,
connived or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall
refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any
BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other
BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or Indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: The above Non -collusion Affidavit is part of the Proposal. Signing this Proposal on
the signature portion thereof shall also cnastitute signature of this Non -collusion Affidavit.
BIDDERS are cautioned that making a false certification may subject the certifier to criminal
prosecution. ' 7 ,
M
W. Holman, Vice
State of CaUjazRiaK Per.
County of Montgomery
5 bscribed answorn to (or affirmed) before me on thisday o€ 20)by
C7WACAN6 ( Sr`e proved to me on the basis of satisfactory evidence to be the
per5anis)—wimo appeared before me
�2ici
' n .ure Notary Public Seal
aim
raat: Mrasnv,aaRfALSEAIBP-i 7 14EY, Notary Publicp, Mantgomen! CountyExpires May 4, 2Q18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract,
certifies as follows;
1. The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such
action shall include, but not be limited to, the following: employment, upgrading,
demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates
of pay or other forms of compensation; and selection for training, including apprenticeship.
The Contractor agrees to post In conspicuous places, available to employees and applicants
for employment, notices to be provided setting forth the provisions of this
nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, or national origin,
3. The Contractor shall send to each labor union or representative of workers with which
he/she has a collective bargaining agreement or other contract or understanding, a notice
to be provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment,
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
S. The Contractor shall furnish all information and reports required by Executive Order 11246
of September 24, 1965, and by rules, regulations, and orders of the Secretary of labor, or
pursuant thereto, and will permit access to his/her books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation, to ascertain
compliance: with such rules, regulations, and orders.
6, In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared Ineligible
for further Government contracts or federally assisted construction contracts in accordance
with procedures authorized In Execution Order 11246 of September 24, 1965, and such
BP -18
CITE` OF SANTA ANA
PROPOSAL
PROJECT NO, 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
other sanctions may be imposed and remedies invoked as provided in Executive Order
11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or
as otherwise provided by law.
7. The Contractor shall Include the portion of the sentence immediately preceding paragraph
(1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant
to Section 204 of Executive order 11246 of September 24, 2965, so that such provisions will
be binding upon each subcontract or purchase order as the administering agency may direct
as means of enforcing such provisions, including sanctions for noncompliance; provided,
however, that in the event the Contractor becomes involved in, or Is threatened with,
litigation with a subcontractor or vendor as a result of such direction by the administering
agency, the Contractor may request that the United States enter into such litigation to
protect the Interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 9.939, and
as amended,
No discrimination shall be made in the employment of persons upon public works because of
race, religious creed, color, national origin, ancestry, Physical handicaps, mental condition,
marital status, or sex of such persons, except as provided in Section 1420, and any contractor of
public works violating this Section is subject to all the penalties imposed for a violation of tine
Chapter.
Signed:
Gre or Ho lman�-
Title: Vice ident
Firm: Asplundh Construction Corp.
Date: February 22., 2016
RM
CITY OF SANTA ANA
PROPOSAL,
PROJECT NO, 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
STATEMENT REC)fflING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 7.777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards
of the craft or trade in the area of the site of the public: work for a certificate approving the
contractor under the apprenticeship standards for the employment and training of apprentices
in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated
in the apprenticeship standards.
3. Contribute to the fund or funds In each craft or trade in which he/she employs
journeyman or apprentices on the public work, in the same amount or upon the same basis and
in the same manner as the other contractors, except contractors not signatory to the trust
agreement shall pay a like amount to the California Apprenticeship Council.
Signed:
Grego y FIolman
Title; Vice esident
Firm: Asplundh Construction Corp.
Date; February 22, 2016
CITY OF SANTA ANA
PROPOSAL
PROJECT NC'. 15»0828
Harbor boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
STATEMENT REGARDING "ANTI -KICKBACK" RE2,U(REMENTS
The undersigned is submitting this proposal for performing by contract the work required by
these bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation
to which he/she is otherwise entitled.
Signed:
G ego o man
Title: Vice sident
Firm: Asglundh Construction Corp
Date: Fe ruary 2.2, 2016
HP -21
CITY Of SANTA ANA
PROPOSAL
PROJECT NO, 15-6828
Harbor Boulevard Corridor Traffic Signa; Improvements
(as part of Harbor Blvd Traffic Signal Synchronization project)
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONAIRE
In conformance with public Contract Code Section 10162, the BIDDER shall complete, under
penalty of perjury, the following questionnaire,
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary Interest in the BIDDER, ever been disqualified, removed, or otherwise prevented
from bidding on, or completing a federal, state, or local government project because of a
violation of law or a safety regulation?
Yes No
If the answer Is yes, explain the circumstances in the following space.
tap -22
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
INSTRU TIONSTO BIDDERS FOR PROPOSAL SUBMISSION
INTENT OF PROPOSAL
The purpose of this Proposal is to Identify a Prime: Contractor to enter into a contract with the
City of Santa Ana, referred to as AGENCY, to complete the work shown on the Contract
Documents,
PROPOSAL
The Proposal shall be submitted in accordance with the Notice Inviting Bids and shall be
accompanied by the following documents:
1. Bid Proposal
2. Bidder's Statement
3. Contractor's Licensings and Registration Statement
4. Prevailing Wage Compliance and monitoring Statement
5. Ownership "davit
6. Old Frond
7. List of Subcontractors
8, References
.y. Additional References
10. Non -Collusion Affidavit
11, Alun -Discrimination Certificate
12. Statement Regarding Apprenticeship Requirements
13, 5taternentRegardIng "Anti-Kickback"Requirements
14, Public Contract Cade Section 10152 Questionnaire
The Proposal may be considered non responsive if any of these documents or forms is not
Included, The bid package shall be submitted as instructed in the Notice Inviting Bids, it is the
BIDDER'S responsibllity, to ensure delivery of the Proposal to the location and prior to the bid
opening hour stipulated in the Notice Inviting Bids, Late Proposals will not be considered.
CALIFORNIA STATE LABOR CODE
As outlined In the Notice inviting Bids, this project is subject to compliance monitoring and
enforcement by the State of California Department of Industrial Relations, per Section
1771.4.a.1. BIDDERS are required to inform themselves fully of the conditions relating to
construction and labor under which the work will be performed, Any contract entered Into
pursuant to this notice will incorporate the provisions of the California State Labor Code. Per
Section 171.4.x,2, Contractors are required to post job site notices, as prescribed by regulation.
iv
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
EXAMINATION OF CONTRACT DOCUMENTS AND PROJECT SITE
BIDDERS shall satisfy themselves by personal examination of the work site, Contract Documents
Including the Plans and Specifications (and by any other means as they believe necessary) as to
the actual physical conditions, requirements, and difficulties under which work must be
performed.
DISCREPANCIES AND MISUNDERSTANDINGS
No BIDDER shall at any time after submission of a proposal make any claim or assertion that
there was any misunderstanding or lack of information regarding the nature or amount of work
necessary for the satisfactory completion of the Job. Any errors, omissions, or discrepancies
found in the Contract Documents including the Plans and Specifications shall be called to the
attention of the AGENCY as a Request for Clarificatlon and addressed prior to the submission of
bid proposals,
REQUESTS FOR INTERPRETATION OF CONTRACT DOCUMENTS
Requests for interpretation must be received at least five (5) working days prior to the bid
opening date, 'rhe person submitting the request will be responsible for its prompt delivery.
Any interpretation or correction of the documents will be made only by an Addendum.
ADDENDA
All addenda issued during open bid advertisement period will be posted on the City of Santa
Ana website and shall become part of the Contract Documents. Before submitting a proposal,
each BIDDER is responsible to become self -informed as to whether or not addenda have been
issued. It is the BIDDER's responsibility to notify the AGENCY regarding receipt of addenda.
WITHDRAWAL OF PROPOSAL
A Proposal may be withdrawn by submitting a written request signed by the BIDDER. Such
requests must be delivered to the AGENCY'S Public Works Agency Executive Director prior to
the bid -opening hour stipulated in the Notice Inviting Bids.
Proposals may not be withdrawn after said hour without forfeiture of the proposal guarantee
which shall remain in effect for BO days after opening bids. The withdrawal of the bid proposal
will not prejudice the right of the BIDDER to submit a new bid proposal, providing there is time
to do so, or to submit a new bid proposal if the is a rebidding of the same project.
BID PROTEST
Any bid protest must be submitted in writing to Executive Director of Public Works Agency, City
of Santa Ana, 20 Civic Center Plaza M-21, Santa Ana, CA 92701 before 5;00 p.m. of the 5th
business day following bid opening.. Bid protests sent via mail or overnight carrier must be
received by the AGENCY by 5:00 pm of the 5th business day following bid opening in order to
v
CITE" OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15.582E
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic signal Synchronization Project)
be deemed timely, Hand delivered protests must be provided to the receptionist in the City
Hall Annex/Public Works Counter on the first floor of the City Hail Annex,
a. The initial protest document shall contain a complete statement of the basis for the
protest.
b. The protest shall refer to the specific portion of the Contract Document which forms the
basis for the protest.
C. The protest shall include the name, address, and telephone number of the person
representing the protesting party.
d, The party filing the protest shall concurrently transmit a copy of the initial protest
document and any attached documentation to all other parties with a direct financial
Interest, which may be adversely affected by the outcome of the protest, Such parties
shall include all other BIDDERS or proposers who appear to have a reasonable prospect
of receiving an award depending upon the outcome of the protest. If staff is aware a
protest has been filed prior to the opening of bids, the AGENCY shall announce at bid
opening who such parties shall be,
e. Should a written bid protest be filed in a timely fashion, a protest hearing shall be held
before the Executive Director of Public. Works or designee by the 10th business day from
receipt of protest. All interested parties may appear and offer testimony at this bid
protest hearing. Formal rules of evidence shall not apply at this hearing, nor shall
testimony under oath be required, The burden of proof shall be on the party submitting
the protest to demonstrate that the staff's determination of proposed low BIDDER is
arbitrary and capricious, or unsupported by substantial evidence in the record.
f. All BIDDERS are advised that if you challenge the AGENCY's award of contract in court,
you may be limited to raising only those issues you or someone else raised at the public
hearing described above, or in written correspondence delivered to the Executive
Director of public Works at or prior to the public hearing,
g. The Executive Director of public Works or designee will issue a written decision to the
City Council on the protest, which shall also be promptly provided to all interested
parties. if the Executive Director of Public Works or designee determines that a protest
is frivolous, the party originating the protest may be determined to be irresponsible and
that party may be determined to be Ineligible for future contract awards,
h. The procedure and time limits set forth in this paragraph are mandatory and are the
BIDDER's sole and exclusive remedy in the event of Bid protest, and failure to comply
with these procedures shall constitute a waiver of any right to further pursue the bid
protest, including filing a Government Code Claim or legal proceedings,
V!
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15.6825
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
BID PROPOSAL
The definitions for Bid Items that are identified in the Bid Proposal form are provided in
Appendix A.
The AGENCY will check each bid Item unit price and amount for all the blds submitted. In case
of a discrepancy between the correct product of the quantity multiplied by the unit price and
the subtotal amount entered by the BIDDER, the correct unit price shall prevail and the product
will be correctly accordingly.
In case of a discrepancy between the correct sum of the individual subtotal amounts and the
total bid amount entered by the BIDDER, the correct sum shall prevail. If a unit price is not
legible or is missing, the amount for that contract bid Item shall be divided by the quantity to
arrive at the unit price. The bid total shall be corrected and the results shall be considered as
representing the bidder's intention. Proposals In which the prices are obviously unbalanced
may be rejected.
If a Bid contains discrepancies that make It difficult or impossible to determine the bidder's
intention, then such Bid may be considered unresponsive, in which case the bid may be
rejected,
rime far Cgmoletinn Of Improverrserrtsond Liquidated Ciam,;P5
The time for completion of this project, and the liquidated damages amount when/if the time
for completion is exceeded, is Included in the Bid Proposal Section of these Contract
Documents,
BI D D ERS STATE M EMI:
In accordance with Section 7028.15(e) of the Business and Professions Code, a licensed
contractor shall not submit a bid to the public agency unless his or her contractor's license
number appears clearly on the bid, the license expiration date is stated, and the bid contains a
statement that representations made therein are made under penalty of perjury. Any bid not
containing this Information or a bid containing information, which is subsequently false, shall be
considered non-responsive and shall be rejected by the public agency. Format for these
statements are included In the Bid Proposal section of these Contract Documents,
In accordance with the Section 3300 of the California Public contract Code, the Agency has
determined that the BIDDER shall possess a license In the classlfication specified In the Notice
Inviting Bids.
Vii
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
OWNERSHIP AFFIDAVIT
An Ownership Affidavit is required to be completed and submitted with the Bid Proposal, A
form is provided in the Bid Proposal section of these Contract Documents.
PROPOSAL GUARANTY 1BID BONDi
Each bid shall be accompanied by a Proposal Guaranty as instructed in the Notice Inviting Bids.
A sample Bid Bond is Included in the Bid Proposal Section of these Contract Documents,
LIST OF 5UB-CONTRACTORS
The State of California Public Contract Code requires listing of all subcontractors who intend to
perform work which is Y, %p of the bid or $10,000 (streets, highways and bridge projects),
whichever is greater, or Y2 % of the bid (buildings, parks, or other projects), A form for this
Information Is provided in the Bid Proposal section of these Contract Documents,
REFERENCESfADDITIONALREF RENCES
BIDDER shall include a list of three public agencies for which BIDDER has performed similar
work within past three (3) years, and three public agencies for which BIDDER and/or his
Subcontractor has performed similar work within the past five (5) years. A form for this
information is provider,! in the Did Proposal section of these Contract Documents.
MJN COLLUSION AFFIDAVIT
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106, the
AGENCY shall require all bidders to execute and submit a non -collusion affidavit with the Bid
Proposal. A copy of the Non•Colluslon Affidavit is provided in the Bid Proposal section of these
Contract Documents,
NON-DISCRIMINATION �,ERTIFiCATE,
Attention is directed to Section 1735 of the California Labor Code, as added by Chapter 643,
Statutes of 1935, which reads as follows:
"No discrimination shall be made In the employment of persons upon public works because of
the race, religious creed, color, national origin, ancestry, physical handicap, medical condition,
marital status, or sex of such persons except as provided in Section 1420, and every contractor
for Public Works violating this Section is subject to all penalties imposed for a violation of the
Chapter."
A copy of the Certification of Nondiscrimination by Contractors Is provided in the Bid Proposal
section of these Contract Documents.
Vib
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO, 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
Bidders shall be familiar with the requirements of Section 1777,5 of the California State Labor
Code regarding employment of apprentices and shall submit a Statement Regarding
Apprenticeship Requirements with the Bid Proposal. A copy of the Statement is provided in the
Bid Proposal section of these Contract Documents.
STATEMENT REG DING "ANTI -KICK -BACK" REQUIREMENTS
Bidders shall be familiar with, and shall agree to comply with, the Copeland "Anti -Kickback" Act
(18 USC 74) as supplemented In the Department of Labor regulations (29 CFR, Part 3), and shall
submit a Statement Regarding "Anti -Kickback" Requirements with the Bid Proposal. A copy of
the Statement is provided in the Bid Proposal section of these Contract Documents.
CONTfRUCTiON CONTA (i AGREEMENT, BONDS & INSURANCE
The Construction Contract Agreement is included in the project Contract Documents as
Appendix B, Sample Bonds are included as Appendix C, and Insurance Requirements are
included as Appendix D,
Following authorization by City Council to award a Construction Contract, written notification
will be given by the AGENCY to the successful BIDDER who will, within ten (10) business days,
submit to the Agency the completed and signed Construction Contract Agreement, a Faithful
Performance Bond, a Materials and Labor Bond, and evidence of Worker's Compensation
Insurance,
Failure to execute a contract and submission of acceptable bonds and Insurance as provided
herein within the time limit above may be just cause for the annulment of contract award and
the forfeiture of the bid proposal guarantee.
No contract shall be binding upon the AGENCY until it has been completely executed by the
Contractor, approved by the City Attorney, and executed by the AGENCY.
After the AGENCY executes the Contract and approves the bonds and certificates of liability
insurance, the AGENCY will send the successful BIDDER a copy of the fully executed
Construction Contract Agreement.
RETURN OF PRQPOSAL,GUA,�
Within ten (10) days after the award of the contract, the AGENCY will return the proposal
guaranties, other than Bid Bonds, except any guaranties that have been forfeited,
to
CITY OF SANTA ANA EXHIBIT 3
APPENDIX B: Construction Contract
PROJECT NO, 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd, Traffic Signal Synchronization Project)
This CONSTRUCTION CONTRACT is made and entered into this 19'h day of April, 2016,
by and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and
municipal corporation organized and. existing tinder the Constitution and laws of the State of
California, hereinafter referred to as "CITY" and Asplundh Construction Corp., hereinafter
referred to as "CONTRACTOR".
WITNESSETH;
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree
as follows:
CONTRACTOR agrees to perform all the work and furnish all the materials at its own
cost and expense necessary to construct and complete in a good and workmanlike manner
and to the satisfaction of the City Engineer of the CITY, the Project No.15-6828, Harbor
Boulevard Corridor Traffic Signal Improvements (as part of Harbor Blvd Traffic Signal
Synchronization Project), hereinafter referred to as the "Work of Improvement", identified
in and in accordance with the Contract Documents prepared by the City's Public Works
Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents," as defined by
the Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid. Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Project Plans
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be
as established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in Lill payment to complete
the Work of Improvement the sum total amount not to exceed $1,170,984, as set forth
and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as
Exhibit "A". The BID PROPOSAL contains a schedule of unit price(s) or lump
sum(s) based on approximate quantities only, and the City does not expressly or by
implication agree that the actual amount of work will correspond therewith, but reserves the
right to increase or decrease the amount of any class or portion of the work or to omit
portions of the work as may be deemed necessary or advisable.
Page 1 of
CITY OF SANTA ANA
APPENDIX B: Construction Contract
PROJECT NO, 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
4. CONTRACTOR agrees to complete the Work of Improvement within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A")
including commencing construction within the timeframe therein specified after issuance of a
Notice to Proceed,
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on
the Work of Improvement a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance
with applicable State and Federal law.
6. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the
CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee
the faithful performance of the work (Performance Bond), and one in the amount of One
Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and
materials furnished (Payment Bond). This Contract shall not become effective until such
bonds are supplied to and approved by the CITY. .
7. CONTRACTOR shall, prior to the release of the performance and payment bonds or the
retention payment, furnish a warranty performance and payment bond (Warranty :Bond).
Said Warranty Bond shall also be required as a condition of project acceptance, For projects
up to $500,000, the Warranty Bond amount shall be the greater of $10,000 or 20% of the
final contract price, For project above $500,000, the Warranty Bond amount shall be the
greater of $100,000 or 10% of the final contract price. .
s. CONTRACTOR. shall, after award of this Contract, famish Certificates of Liability
Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be
approved by the CITY. H
FIA
Page 2 of 3
CITY OF SANTA ANA
APPENDIX B: Construction Contract
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal hnprovements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the
day and year first above written.
ATTEST:
MARIA D. HUIZAR
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Atto ey
BY
se� Sandoval
2elf Assistant Ctty Attorney
CITY OF SANTA ANA:
DAVID CAVAZOS Clerk of the Council
City Manager
RECOMMENDED FOR APPROVAL:
Fred Mousavipour
Executive Director, Public Works Agency
CONTRACTOR:
Asplundh Construction Corp.
By
Title
Page 3 of 3
COST ANALYSIS
PROJECT NO. 15-6828: HARBOR BOULEVARD CORRIDOR TRAFFIC SIGNAL
IMPROVEMENTS (AS PART OF HARBOR BLVD TRAFFIC SIGNAL SYNCHRONIZATION
PROJECT)
Construction Contract
$1,170,984
Contract Administration
$25,378
Inspection and Testing
$44,942
Contingencies
$116,896
TOTAL ESTIMATED CONSTRUCTION COSTS
$1,358,200
Exhibit 4
THE REGISTER
625 N GRAND AVE, SANTA ANA, CA 92701
Telephone (714) 796-7000 / Fax (714) 796-6059
PROOF OF PUBLICATION
(2015.5 C.C.P.)
State of California )
County of ORANGE ) ss
Notice Type: BID - NOTICE INVITING BIDS
Ad Description:
Harbor Blvd Corridor Traffic Signal Synch
I am a citizen of the United States and a resident of the State of California; I am
over the age of eighteen years, and not a party to or interested in the above
entitled matter. I am the principal clerk of the printer and publisher of the THE
REGISTER, a newspaper published in the English language In the city of
SANTA ANA, county of ORANGE, and adjudged a newspaper of general
circulation as defined by the laws of the State of California by the Superior
Court of the County of ORANGE, State of California, under date 11/19/1905,
Case No. A21046, That the notice, of which the annexed is a printed copy, has
been published in each regular and entire issue of said newspaper and not in
any supplement thereof on the following dates, to -wit:
02/08/2016, 02/15/2016
Executed on: 02/15/2016
At SANTA ANA ,CA
I certify (or declare) under penalty of perjury that the foregoing Is true and
correct.
III I II II II II II I I II II II I III I I II
* A 0 0 0 0 0 4 0 0 0 2 6 6
CNS#: 2842953
This project includes work In
the Cltles of Santa Ana,
Garden Grove and Cost.
Mesa. City of Santa Ana Is
the lead agency and will
provide all construction
management. Iteds, ae
provided by the
corresponding agency.
Scope of work Includes
replacing traffic signal
controller cabinets, installing
communication condult and
fiber optic cable, CCTV
cameras, video and loop
detection, emergency vehicle
preemption, uninterruptible
power source and pedestrian
upgrades.
Prior to bid opening, Bidders
must possess or obtain a
valid California Class "C-10"
Contractor's license.
submission is Included In the
Contract Documents, which
are available Wdf format) at
the Public arks Acencv
at
This project Is subject to
compliance monitoring and
enforcement by the State of
California Department of
Industrial Relations, per
Section 1771.4e.l. A
Contractor or subcontractor
must be registered with the
Deppadment of Industrial
Relations prior to submitting
a bid.
This space for filing stamp only
In accordance with the
penvisions of the California
Labor CCode, prevailing wage
2/8,rat's2/15/11
CNS-2842953#
THE REGISTER
Recorded In Official Records, Orange County
Hugh Nguyen, Clerk -Recorder
II l l II II II 111111 IIS III�II I II NO FEE
*$ 8 0 0 0 7 0 3 4 7 2 9$
2014850009471:29 pm 10/16/14
292 OR02 Z01
0.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00
1
NOTICE OF EXEMPTION
From the Requirements of the California Environmental Quality Act (CEQA)
To: COUNTY CLERK
County of Orange
P.O. Box 238
Santa Ana, CA 92702
Project Title: Harbor Blvd Corridor Traffic S
Project Number(s):
Project Location:
City: Santa Ana
Project Description:
Applicant Name:
PWA -2014 -1065 -CITY
1 Citywide (Partial)
From: City of Santa Ana
Planning & Building Agency
20 Civic Center Plaza M-20
Santa Ana, CA 92702
Date of Approval: 06/17/2014
County: Orange ER Number: ER -2014-82
Replace traffic signal controller cabinets, foundation, conduit and installing fiber optic cable, CCTV
cameras and associated equipment at the TMC.
City of Santa Ana
Applicant Address: 20 Civic Center Plaza M-43
SANTA ANA, CA 92702
Name of Public Agency Approving Project: City Council
Name of Person or Agency Carrying Out Project: Nguyen, Vinh
Exempt Status:
❑ Ministerial (Sec. 15268)
❑ Declared Emergency (Sec, 15269 (a))
❑ Emergency Project (Sec. 15269 (b through e))
❑ General Rule (Sec. 15061(b)(3)/(5))
OCT 16 2014
HUGH NGUYEN, ERK-RECORDER
BY. DEPUTY
❑ Statutory Exemption: OCT 16 2014
CRI Categorical Exemption: 15301(b)
Reason(S) Why Project is Exempt From CEQA: pRANGE CpI/NTY Ct RK -RECORDER DEPARTMENT
1530(b) consists of repair/maintenance of existing public facilities. BY:
DEPUTY
City Contact: Vinh Nguyen Telephone: (714) 647-5612
Signature: r Title: r l` r-`cr1 Date: cl III 4 l
SANTA ANA CITY COUNCIL l
Miguel A. Pulido Sal Tinapro - Vincent F. Sarmieme Michele Martinez Angelica Amezcua P. David Benavides Roman Reyna
Mayor Mayor Pro Tem, Ward 6 Ward Ward Ward - Ward Ward
PU uld_Q, t - n c'. 4T'mlerc oasanta-ana om-�j$a®jynjq(�,,;;anta ana ord MMatt ng3Qeanta-ana orrtAAmezcua(olsenta-ana om; Dee a desgsa [ - aom -RRe ra sa to-ana oro
MAYOR
s a
CITY MANAGER
Miguel A. Pulido
p
*a
David Cavazos
MAYOR PRO TEM
CITY ATTORNEY
Sal Tinajero
8
Sonia R. Carvalho
COUNCIL MEMBERS
CLERK OF THE COUNCIL
Angelica Amezcua
Maria D. Hulzar
P. David Benavides
Michele Martinez
Roman A. Reyna
Vincent F. Sarmiento
CITY OF SANTA ANA
PLANNING & BUILDING AGENCY
20 Civic Center Plaza (M-20)
P.O. BOX 1986 . Santa Ana, California 92702
(714) 667.2700 • Fax (714) 973.1461
"-
www.santa-ana.org
1
NOTICE OF EXEMPTION
From the Requirements of the California Environmental Quality Act (CEQA)
To: COUNTY CLERK
County of Orange
P.O. Box 238
Santa Ana, CA 92702
Project Title: Harbor Blvd Corridor Traffic S
Project Number(s):
Project Location:
City: Santa Ana
Project Description:
Applicant Name:
PWA -2014 -1065 -CITY
1 Citywide (Partial)
From: City of Santa Ana
Planning & Building Agency
20 Civic Center Plaza M-20
Santa Ana, CA 92702
Date of Approval: 06/17/2014
County: Orange ER Number: ER -2014-82
Replace traffic signal controller cabinets, foundation, conduit and installing fiber optic cable, CCTV
cameras and associated equipment at the TMC.
City of Santa Ana
Applicant Address: 20 Civic Center Plaza M-43
SANTA ANA, CA 92702
Name of Public Agency Approving Project: City Council
Name of Person or Agency Carrying Out Project: Nguyen, Vinh
Exempt Status:
❑ Ministerial (Sec. 15268)
❑ Declared Emergency (Sec, 15269 (a))
❑ Emergency Project (Sec. 15269 (b through e))
❑ General Rule (Sec. 15061(b)(3)/(5))
OCT 16 2014
HUGH NGUYEN, ERK-RECORDER
BY. DEPUTY
❑ Statutory Exemption: OCT 16 2014
CRI Categorical Exemption: 15301(b)
Reason(S) Why Project is Exempt From CEQA: pRANGE CpI/NTY Ct RK -RECORDER DEPARTMENT
1530(b) consists of repair/maintenance of existing public facilities. BY:
DEPUTY
City Contact: Vinh Nguyen Telephone: (714) 647-5612
Signature: r Title: r l` r-`cr1 Date: cl III 4 l
SANTA ANA CITY COUNCIL l
Miguel A. Pulido Sal Tinapro - Vincent F. Sarmieme Michele Martinez Angelica Amezcua P. David Benavides Roman Reyna
Mayor Mayor Pro Tem, Ward 6 Ward Ward Ward - Ward Ward
PU uld_Q, t - n c'. 4T'mlerc oasanta-ana om-�j$a®jynjq(�,,;;anta ana ord MMatt ng3Qeanta-ana orrtAAmezcua(olsenta-ana om; Dee a desgsa [ - aom -RRe ra sa to-ana oro
0' �C2� CITY OF SANTA ANA
1 2p 2111
APPENDIX B: Construction Contract
w- PROJECT NO, 15-6828
Harbor Boulevard, Corridor Traffic Signal Improvements
(as part of Harbor Blvd. Traffic Signal Synchronization Project)
This CONSTRUCTION CONTRACT is made and entered into this 19"' day of April, 2016,
by and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and
municipal corporation organized and existing under the Constitution and, laws of the State of
California, hereinafter referred to as "CITY" and Asplundh Construction Corp., hereinafter
referred to as "CONTRACTOR".
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree
as follows:
1. CONTRACTOR agrees to perform all the work and famish all the materials at its own
cost and expense necessary to construct and complete in a good and workmanlike manner
and to the satisfaction of the City Engineer of the CITY, the Project No.15-6828, Harbor
Boulevard Corridor Traffic Signal Improvements (as part of Harbor Blvd Traffic Signal
Synchronization Project), hereinafter referred to as the "Work of Improvement", identified
in and in accordance with the Contract Documents prepared by the City's Public Works
Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents," as defined by
the Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Project Plans
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be
as established in the Standard Specifications for Public Works Construction,
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete
the Work of Improvement the sum total amount not to exceed $1,170,984, as set forth
and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as
Exhibit "A". The BID PROPOSAL contains a schedule of unit price(s) or hemp
sum(s) based on approximate quantities only, and the City does not expressly or by
implication agree that the actual amount of work will correspond therewith, but reserves the
right to increase or decrease the amount of any class or portion of the work or to omit
portions of the work as may be deemed necessary or advisable.
Page 1 of
CITY OF SANTA ANA
APPENDIX B: Construction Contract
PROJECT N0, 15-6828
Harbor Boulevard Corridor Traffic Signal hnprovements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
4. CONTRACTOR agrees to complete the Work of Improvement within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A")
including commencing construction within the timeframe therein specified, after issuance of a
Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on
the Work of Improvement a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance
with applicable State and Federal law.
6. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the
CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee
the faithful perfonmance of the work (Performance Bond), and one in the amount of One
Hundred Percent (100%) of tike Contract price to guarantee payment of all claims for labor and
materials furnished (Payment Bond). This Contract shall not become effective until such
bonds are supplied to and approved by the CITY. .
8
CONTRACTOR shall, prior to the release of the performance and payment bonds or the
retention payment, firmish a warranty performance and payment bond (Warranty Bond).
Said Warranty Bond shall also be required as a condition of project acceptance. For projects
Lip to $500,000, the Warranty Bond amount shall be the greater of $10,000 or 20% of the
final contract price. For project above $500,000, the Warranty Bond amount shall be the
greater of $100,000 or 10% of the final contract price. .
CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability
Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be
approved by the CITY. //
Page 2 of 3
APPENDIX B: Construction Contract
PROTECT NO, 15-6823
Harbor Boulevard Corridor. Traffic Signal hnprovements
(as part of Harbor Blvd Traffic Signal Synchronization tion Project)
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the
day and year first above written.
ATTEST: CITY OF SANTA ANA:
MARIA D. HUIZAR DAVID CAVAZOS Cleric the Council
City Manager
APPROVED AS TO FORM: RF,COMMENDED FOR APPROVAL:
SONIA R. CARVALHO
CityAtto •ney _.__.,
BY 4 Ili)
f se Sandoval d Mou avip ur
of Assistant City Attorney ^xecutive Director, Public Works Agency
CONTRACTOR:
Asplundh Construction Corp,
By 'moi,
Title Gr 'y W. olman
Vice UPresident
Page 3 of 3
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the
proposed work, that they have examined the Contract Documents in its entirety and hereby
proposes to furnish all material and do all the work required to complete the said work in
accordance with said plans (if any) and the specifications far the unit price(s) or lump sum(s) set
forth in the following schedule:
itean
Description
t
City of
Santa Ana
Traffic Signal Modification at Harbor Blvd
I
Ls
and 5th St
L
Install Type 334 Communication Cabinet
I
LS
$
Assembly
3
Install 2" PVC Conduit
530
LF
$
4
Install 3" PVC Conduit
3200
LF
$ 3
s)
5
install 4" PVC Conduit
to
LF
6
Install No. 6 Pullbox
16
EA
14
7
Install No. ISE Pullbox
3
EA
B
Install Type E Loop Detector
28
EA
bo
9
Install Detector Lead-in Cable
16120
LF
10
Replace Pedestrian Head Assembly with
Countdown Head
32
EA
ME
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. IS -6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
City
Unit
Unit Price
Amount
11
Install Audible Pedestrian Signa! (APS)
1
LS
$ I �7V ,
$
System
12
Install CCTV System
3
EA
$'`,��
13
Replace Wireless System
2
EA
$ d 10b�
$ is MLr
14
Install 48 Strand SMFO Cable
500
LF
$
15
Install 24 Strand SMPO Cable
5000
LF
$ �'
$ J�` Ji' LO
16
Install 12 Strand SMFt7 Cable
700
LF
0�
$ � •�'"
$ / ✓� .—
17
install CATSe (Outdoor Rated) Cable
500
LF
$ �, �i
$ /� 6DO,
t8
Fusion Splice.1 Strand Single Mode Fiber
335
CA
$ +y,l� tp�i
Jb
$ g
Optic Cable
19
Install Fiber Optic Splice Closure
4
LS
20
Install IP Communication System at Harbor
1
EA
$ ) ,,,P
$ iLo
Blvd and Hazard Ave
I ,'
f
21
Install IP Communication System at Harbor
1
EA
Blvd and SthSt
22
Install IF Communication System at Harbor
1
EA
Blvd and 1st St
23
Install IP Communication System at HarborW
1
EA
e�
�N�Wo
$ p/ 2,40,rA
!O
Blvd and McFadden Ave
u/ WW
W i
z4
Install IF Communication System at Harbor
1
EA
$ G�/�,.
$
Blvd and Warner Ave
25
Install !P System at Systeat Harbor
1
EA
�. (p
$ �II
LI?
$ ®off
Blvd and Segerstrom Ave
Ot��
25
install IP Communication System at Harbor
1
EA
S (� �` l�j
$
Blvd and Garry Ave
27
Install IP Communication System at Harbor
1
EA
IvJ
$
�j-o
$®�.
Blvd and MacArthur Blvd
28
Remove Wireless System
7
EA
$ fj bo"
$ �DU, t�
IE
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
item
Description
Qty
Unit
Unit Price
Amount
29
Remove Video Detection System at Harbor
1
LS
$ �•�`
W
$
Blvd and Warner Ave
30
Pothole For Utility Not Shown on plan
10
EA
$ b 90 r-
$ /� U ,LO wl�
TOTAL SANTA ANA BID
$ lo I T 5 ve
City of Garden Grove
31
Cabinet Upgrade
1
EA
$ �(/il' •
$
32
Furnish and install EVP Unit
17
EA
33
Furnish and Install EVP Phase Selector
a
EA
$J{
$ � �,I A•�
34
Furnish and Install EVP Cable
2745
LF
35
Furnish and Install Pedestrian Push -Button
so
EA
$
w_
Assembly
36
Furnish and Install Pedestrian Countdown
Module
10
EA
$Aso—,
37
Furnish and Install Video Detection System
6
EA
�fq �
$O6J,
_ 0r)
$ 1T7jD�.
(VDS)
TOTAL GARDEN GROVE BID $ ��� I � F'�, .�� _
City of Costa Mesa
38
Remove and salvage existing traffic signal
cabinet. Remove foundation complete.
1
EA
hh u Oo
G'�
39
Remove and salvage existing traffic signai
5�EA
$ I `
$ 600
cabinet
f:
if .
40
Remove and salvage existing UPS cabinet
and assembly
4
EA
$ /Sv o
$
fBf/
4i
Furnish and install Type P cabinet on new
foundation
1
EA
ry4/
4t
Furnishand Install Type P cabinet on
foundation
5
EA
''
existing
IBM
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. IS -6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
Qty
unit
Unit Price
Amount
43
Furnish and install UPS Cabinet and UPS
R
EA
#r /]
aZS
$ 2
assembly
]
o
44
Relocate existing traffic signal controller
6
EA
/% /r o
$ fo
pU0 �J �/�/j
$
assembly 4a new controller rahinet
e Tf°'�•00
45
Furnish and Install new CCTV camera
YO
EA
in
$'aY 00.
/ ®„
$ -41 pOD.
system
45
Remove and salvage existing CCTV camera
i
EA
$ 6 �• �.-
$
47
Furnish and Install new pedestrian push
76
EA
$ g/
$
button assembly
48
Furnish and Install new pedestrian
58
EA
$ vd
I,pt�ygfg, dt3
countdown module
49
Remove existing pull box and Fundsh and
Y
EA
$ I
v �•
$
install NGE Full Box
,�00.''
i��0,
5U
Remove existing pull bort and Furnish and
2
EA
$ �
Install 45 Pull Box
.
r
f�
51
Furnish and Install ME Pull -Box
5
EA
$ -1 '7✓, �
$ /4I S7 S,
52
Furnish and Install 45 pull -Box
3
EA
$ � , w�`
o
$
53
Furnish and Install new 3" Conduit
1175
LF
'0,tl�
54
Remove existing SIC Cable
SUN
Lf
$
55
Furnish and Instal[ ai Strand SMFC7 Cable
795
LF
$J0
$
56
Furnish and Install 24 Strand SMFO Cable
4110
LF
$ � ,�i'
0
$ I D,
57
Furnish and Install Splice Enclosure In 46C
pull box. Fusion splice and terminate all
8
EA
a�
$ 1� 3v(7,'
$
fibers erfiberschemavc.
58
Fusion splice and terminate new fibers in
2 _
EA
rp
g r}u
existing splice canister per fiber schematic
59
Terminate hoar drop cable in fiber patch
3
EA
$�f�l��.ti
panel
6U
Terminate fiber c istriirutian cable In fiber
1
EA
$'
patch penal
BP -4
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
qty
Unit
Unit Price
Amount
I Furnish and Install Video Detection System 1 EA
Furnish and Install new fiber patch panel.
TOTAL ALTERNATE BID#1
Alternate Bid #2— Cardinal Circle at Harbor Blvd Video Detection — City of Garden Grove
0
61
All fibers are to be terminated per fiber
7
EA
$ / 3
$
r v
schematic.
l
62
Furnish and Install #id trace wire
5505
LF
$
63
Re-pull distribution cable fromcontroller
5
EA
cabinet to #6E Pull Box
TOTAL COSTA MESA BID
$ I , q C-�,
TOTAL BASE BID
DO
z
SANTA ANA+GARDEN GROVE+COSTA MESA)
Alternate Bid Items
Alternate Bid #1— Harbor Place at Harbor Blvd Video Detection — City of Garden Grove
Item
Description
qty
Unit
I Unit Price
Amount
I Furnish and Install Video Detection System 1 EA
$DB $
TOTAL ALTERNATE BID#1
Alternate Bid #2— Cardinal Circle at Harbor Blvd Video Detection — City of Garden Grove
Item Description Qty Unit
Unit Price Amount
1 Furnish and Install Videx Detection System i EA
0
TOTAL ALTERNATE BiD#2
$ p2o ')_001.11
RP -5
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
4
Furnish and Install UPS Cabinet and UPS
1
EA
00
SS%)�i�.'
$ �b osn
Amount
assembly
Remove and salvage existing traffic signal
1
EA
$,500.124, 7
5
Relocate existing traffic signal controller
1
EA
N
$
co
,g-oo
assembly to new controller cabinet
Furnish and Install Type P cabinet on
1
EA
6
Rewhe Intersection
1
LS
e0
a 00
7
Remove existing pull box
1
EA
$ ,Q(J,�^
$ i0a, 00_
8
Furnish and Install No. 6E Pull Box
2
EA
a
9
Furnish and Install new 2" conduit
20
LF
,y �°
$
10
Furnish and install new 3" conduit
220
LF
$ �� .
y 9 /vl7"6 0�
11
Furnish and install new 4" conduit
40
LF
$
$ 'J 12t`O "
'aAr
12
germinate fiber drop cable in fiber patch
1
EA
$;r17�
$ �,^,Wr,
anel
/ 0[/
13
Furnish and Install 410 Tracw Wire
260
LF
$ ,
$
14
Re-pull' distribution cable from controller
1
EA
$ %
$ 0'
cabinet to 46E Pull -Box
✓ �6
J ,
TOTAL ALTERNATE BID#3
$°
Alternate Bid #4— Wilson Street at Harbor Blvd Cabinet Upgrades — City of Costa Mesa
Item
Description
Qty
Unit
Unit Price
Amount
1
Remove and salvage existing traffic signal
1
EA
$,500.124, 7
$ • �
cabinet.
1
,g-oo
2
Furnish and Install Type P cabinet on
1
EA
existing foundation
3
Relocate existing traffic signal controller
1
EA
$ 506-1$
UO
Spa
��
assembl to new controller cabinet
I
1
TOTAL ALTERNATE BID#4
^
$
Alternate Bid #5 — Hamilton Street at Harbor Blvd Cabinet Upgrades — City of Costa Mesa
Item
Description
City
Unit
Unit Price
Amount
1
Remove and salvage existing traffic signal
1
EA
$ ii & jy d�00
vVV
U"0
�'
cabinet. Remove foundation complete.
1
O�D•
I
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
z
Furnish and Install Type P cabinet an new
1
EA
s3)
foundation.
'�®®°
3
Furnish and Install OPS cabinet and UPS
g
EA
J do® ��"
Db O
Assembly
I
I
4
Relocate existing traffic signal controller
1
EA
oo
$ 1 �®®, ")
u�
�® `
assembly to new controller cabinet
t'S
TOTAL ALTERNATE SIM
$00 00
TOTAL Base Bid plus Alternate 1,2,3,4 & 5 $ J. q0;
The lowest responsible bidder shall be selected based on the Tatal Base Bid. The City reserves
the right to award the Base Bid only, Base Bid plus any Alternate Bid Items (if any) or Base Bid
plus all Alternate Bid items.
The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves
the right to Increase or decrease the quantity of this Item accordingly.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total contract base bid
amount shown above, within eighty (80) working days after the commencement date stated in
the Notice to Proceed.
If Alternate Bid#1 is awarded, five (S) working days will be added to the working days assigned
to complete the contract base bid items.
If Alternate Bid#2 is awarded, five (5) working days will be added to the working days assigned
to complete the contract base bid items.
If Alternate Bid#3 is awarded, twenty (20) working days will be added to the working days
assigned to complete the contract base bid items.
If Alternate Bid#4 is awarded, ten (10) working days will be added to the working days assigned
to complete the contract base bid items.
am
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
gas part of Harbor Blvd Traffic Signal Synchronization Project)
If Alternate Bid#5 is awarded, twenty (20) working days will be added to the working days
assigned to complete the contract base bid items.
The liquidated damages amount in lieu of the amount specified in Subsection 6-5 of the
Standard Specificat' ns shall be $ ,000 per calendar day. j
Name of Firm Y-tMt�(1}1�1()lt MVlSrV1fJ0—r7()1*J
MrAMMEMEM
Title
(if an individual, so state)
W. Holman, Vice President
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15.5828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and
the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the
Council with her signature and official seal noting hereon the action of approval of the Council,
signed by the Public Works Agency Executive Director or his/her duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its
execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited
with the United States Postai Service properly addressed to the BIDDER with the correct
postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or
BIDDER'S bond substituted in lieu thereof shall he returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set
forth in the bid schedule are solely for the purpose of comparing bids, and that final
compensation under the contract will be based upon the actual quantities of work satisfactorily
completed. The BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm { S k` LU U0 A A..1�J L4Cl !l�' . II.0 L}
Signature of BIDDER
Title
(if an individual, so
Holman, Vice President
(If a firm or co -partnership, state the firm name and give the names of all individual co-partners
composing the firm, if a corporation, state legal name of corporation, and names of President,
Secretary, Treasurer and Manager, thereof.)
EIP-9
CITY OF SANTA ANA
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
CONTRACTOR'S LICENSING and REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she
and all his/tier subcontractors are registered with the State of California Department of
industrial Relations (DIR), and that the following is true and correct.
Contractor's Name:
Business Address:
Business E -Mail
Address:
Telephone: ')I q f }z -- (S,q („� /
State Contractor's License No. and Class: k' l LL a -t0 / A
License
Expiration Date:
State Dept. of Industrial Relations (DIR)
Registration No.: � O000 1 j
State Dept. of Industrial Relations (DIR)
Registration Expiratiop Date: ,
Signed:
Title: GregMV W. Holman, Vice President
I
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well
as California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"),
which require the payment of prevailing wage rates and the performance of other
requirements on "public works" and "maintenance" projects. Since the services are being
performed as part of an applicable "public works" or "maintenance" project, as defined by the
Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees
to fully comply with such Prevailing Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at
the commencement of this Agreement. Contractor shall make copies of the prevailing rates of
per diem wages for each craft, classification or type of worker needed to execute the services
available to Interested parties upon request, and shall post copies at the Contractor's principal
place of business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees
and agents free and harmless from any claim or liability arising out of any failure or alleged
failure to comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm
Signature of BI[
Title
(if an individual, so state)
€ m
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, IS -6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
OWNERSHIP AFFIDAVIT
STATEOF &AA#f=KM Pennsylvania
COUNTY OP 0&0,UK Montgomd25§¢
CITY of SANTA ANA
Gregory W. Holman , being duly sworn, deposes and says:
ClINDIVIDUAL That he/she Is the party making the foregoing proposal:
[] PARTNERSHIP That he/she Is a member of the co -partnership firm designated as:
and who has been and Is duly vested with the authority to make
instruments for the co -partnership by:
who constitute the other members of the co -partnership,
ORPORATION That he is of:
Vice President
a corporation which is making the foregoing proposal:
[]JOINT VENTURE That he is of:
execute
one of the parties making the foregoing proposal as a joint venture, and the he/she has
been and is duly vested with the authority to execute instruments for an an behalf of
the parties making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by
collusion to secure any advantage against the City of Santa Ana or any person interested in the
proposedonlract, for hi se ' or a y other person.
Signature
ignator of Bt Gregory W. Hol " Vice President
Subscrib d and sworn to before me this �"Z day of� 20 jjf
signature o Icer Adm is Bring oat h jNa' a blit)
COMMONWEALTH OF PENNSYLVANIA
N07AIRALSEAL
KIMBERLY S. WILEy, Notary Public
Horsham Township, Montgomery County
My Commission Expires f V41 Ji018
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
KNOW ALL PRESENT that,
Asolundh Construction Coro as BIDDER, and
_Travelers Casualty and Surety Company of America as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of
Ten Percent (10%) of Amount Bid Dollars ($ -----------10%----------), which Is ten percent (10%)
of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a
bid to AGENCY for the above -stated project, if said bid Is rejected, or if said bid is accepted and
a contract is awarded and entered into by BIDDER in the manner and time specified, then this
obligation shall be null and void, otherwise it shall remain in full force and effect in favor of
AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
22nd day of February , 2016.
+.sc 1a11�
SURETY*
Travelers Casualty and Surety Company of America
Subscribed ands rn to before me Naomi L{arric this 22nd day of
February 20 16.
Signature: W�u
Notary Public in and for the County of Harris , State of Texas
"Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address,
and telephone number of authorized representative.
&m
. s� aug� NAOMI HARRIS )3 P-13
Notary Public
` STATE OF TEXAS
5
r9fEOF'�'P MY Commission Expires July x.2019
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
HARTFORD, CONNECTICUT 06183
FINANCIAL STATEMENT AS OF DECEMBER 31, 2014
CAPITAL STOCK$ 6,480,000 '
:ASH AND INVESTED CASH
$ 127,187,283
UNEARNED PREMIUMS
$ 855,349,712
IONDS
3,411,436,937
LOSSES
680,168,443
ITOCKS
3261931,879
LOSS ADJUSTMENT EXPENSES
356,911,923
VVESTMENT INCOME DUE AND ACCRUED
45,277,103
COMMISSIONS
34,142,046
)THER INVESTED ASSETS
4,019,410
TAXES, LICENSES AND FEES
11,534,866
'REMIUM BALANCES
209,962,904
OTHER EXPENSES
46,097,408
IET DEFERRED TAXASSET
62,639,844
CURRENT FEDERAL AND FOREIGN INCOME TAXES
24,133,560
tEINSURANCE RECOVERABLE
17,397,751
REMITTANCES AND ITEMS NOTALLOCATED
11,062,602
IECURITIES LENDING REINVESTED COLLATERAL ASSETS
8,224,694
AMOUNTS WITHHELD I RETAINED BY COMPANY FOR OTHERS
41,744,996
:ECEIVABLES FROM PARENT, SUBSIDIARIES AND AFFILIATES
9,057,199
RETROACTIVE REINSURANCE RESERVE ASSUMED
853,430
)THER ASSETS
3,076,655
POLICYHOLDER DIVIDENDS
7,376,699
PROVISION FOR REINSURANCE
3,416,505
ADVANCE PREMIUM
1,327,118
PAYABLE FOR SECURITIES
4,590,766
PAYABLE FOR SECURITIES LENDING -
8,224,694
CEDED REINSURANCE NET PREMIUMS PAYABLE
28,084,142
ESCHEAT LIABILITY
1,136,046
OTHER ACCRUED EXPENSES AND LIABILITIES
421,157
TOTALLIABILITIES
—f--2.1%570,190
CAPITAL STOCK
$ 6,480,000
PAID IN SURPLUS
433,803,760
OTHER SURPLUS
1,674 373 715
TOTAL SURPLUS TO POLICYHOLDERS
$ 2J14.657.475
"OTALA$SETS
$ 4.225,233,665
TOTAL LIABILITIES&SURPLUS
$ 4,226,233,665
>TATE OF CONNECTICUT i
;OUNTY OF HARTFORD ) SS.
:ITY OF HARTFORD )
AICHAEL J. DOODY, BEING DULY SWORN, SAYS THAT HE IS SECOND VICE PRESIDENT, OF TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA,
4ND THAT TO THE BEST OF HIS KNOWLEDGE AND BELIEF, THE FOREGOING IS A TRUE AND CORRECT STATEMENT OF THE FINANCIAL CONDITION OF SAID
:OMPANY AS OF THE 31 ST DAY OF DECEMBER, 2014.
SUBSCRIBED AND SWORN TO BEFORE ME THIS
19TH DAY OF MARCH, 2015
SECOND VICE PRESIDEIy/j�1-
a (::)
y _.x �S
NOTAR PURL
SUSAN M. WEISSLEAER
Notary PuNlo
My Commission ExpiresNovember30, 2017
Corporate Acknowledgement
STATE OF PENNSYLVANIA
COUNTY OF MONTGOMERY
On this 23rd day of February, 2016, before me came George D. Licci to me
known, who, being by me duly sworn, did depose and say that he resides in Jamison, PA
that he is Asst. Secretary of Asplundh Construction Corp. The corporation described in
and which executed the forgoing instrument as principal; that he knows the seal of said
corporation; that the seal affixed to said instrument is such corporate seal; that it was so
affixed by order of the Board of Directors of said corporation and the he signed his name
thereto by like order
Subscribed and sworn to me before this 23rd day of February, 2016 A.D.
Notary Publi : 61regory K. Fuller
My commission expires: 1/29/17
COMMONWEALTH OP PENNIbYLVANIA
NOTARIAL R, No
GREGORY K. FULLER, Nofary Public
Whit * Twp., Montgomery Counttyy
MY Commissbn res Janua .0 7
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 25.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: YM of the bid or $10,000, whichever is greater
a Buildings, parks, or other projects: fa% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name (�,bssnn 9h( i`Lf '. N me
License #/Exp. °13t.'6aq Lic nse#/Exp.
DIR Reg. #/Exp. Jit ,0oc 15G DIR g. #/Exp.
Location ELL�'a n raz sr. : Wu,aa Locatiols
Phone �� �iJ21 Phone
Type Of Work i,Rr 12 Z;L6 vuA Type Of N
Amount $--I,QQO'00D " Amount $
Name SSS Z)in.ecno,uJL "t� 1, uv4
License #/Exp. -r te '7g4LL5 ( License#/Exp.
DIR Reg.#/Exp. DIR Reg.#/Exp.
Location 'oat) 4.0L,a j{L L NO"D Ca Location
Phone +Zf� acl �55q�40 Phone
R
Type Of Work ° vkcik� &'LWC4 Type Of Work
Amount $ ,.Q/'000. 1 Amount $
License N/1115-.
DIR Reg. #/Exp.
Location
Phone �®
Type Of Work
Amount.
SignaTure of Bidder
BP -I4
License #/Exp.
DIR Reg.#/Exp.
Location _
Phone _
Type Of Work
Amount $
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which BIDDER has performed similar work within the past three years.
2.
0
and Address of Owner.
Name and"TaLephone Number of person familiar with project.
Contract Amount
Name and Address of owner.
Name and Telephone Number of person fa
Contract Amount
Name and Address of owner.
of Work
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work
Date Completed
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties
from whom BIDDER intends to procure insurance and bonds.
—1 LNT(,LAL�Y wjo -)LJQ,4V Lb, 91 /6�&ta
BP -15
_
\\
/
\
Q
\
\
}CD
V
:
~
cm
`
\
\
\
}
0
`
fƒ9
/(/
ƒ
\
m
)
}0
}
»
_
:
,
Q
2
,
,
�
)
�
\
>
--
~
Li
n
f\/
\g\
n
-
»2c
M
-/__
/
-
:>>
/--
}
}
`
)
�
}
\/
}
\
\
�
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
�;117g1�C�li!II�:iTf��Clxi [y+f:'1
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed Traffic Signal and Intelligent Transportation
System (ITS) installation and/or modification in the past 5 years,
1.
Name qd Addres,=. of Owner.
Name andd Teleph n Nu_mbe
Contract Amount
2.
Name and Address of owner.
471
person familiarwith project.
Type of Work
Name and Telephone Number of person
Contract Amount
Name and Address of owner.
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount
Type of Work
Date Completed
Date Completed
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties
from whom BIDDER intends to procure insurance and bonds.
SP -i6
ASPLUNDH TREE EXPERT CO.
708 Blair Mill Road
Willow Grove PA 10000-1784
nre uuuvu curparau, neaaquaners auoress award not be used for billing purposes. All involoes and/or statements should be fonvanded to
me individual regional offices who conducted business with the vandor.
ORIGINATED: August, 1928 FEDERAL ID NUMBER: 23-1277550
INCORPORATED: December 26, 1945 DUNS NUMBER: 00-791-1753
OFFICERS: George E. Graham, Jr., President
Joseph P. Dwyer, Secretary/Treasurer
TYPE OF BUSINESS: Vegetation management and right-of-way clearing for utility companies
BANK REFERENCE:
PNC Bank
Credit Reference Department
MS 176-F166-04.9
4th Floor
8800 Tinicum Boulevard
Philadelphia, PA 19153
TRADE REFERENCES:
ikyllwela
Southco Industries Inc.
Altn.: Credit Dept. / Carolyn Grant
1840 East Dixon Boulevard
Shelby, NC 28152
voice (800) 331-7655
fax (704) 482-1460
Altec Industries, Inc.
210 Inverness Center Drive
Birmingham, AL 35242
contact: Scott Reed
voice (205) 960-6978
fax (205) 408-8063
W.W. Grainger Inc.
phone (847)647-2060
account# 865856645
TOTAL EMPLOYEES: 33,000+
FAX NUMBER; (215) 749-6191
EMAIL: pnc_credit_investigations@pnc.com
ACCOUNT MANAGER: Eric Hersom
Husqvarna Forest & Garden Co.
9335 Harris Comers Parkway
Charlotte, NC 28269
voice (704) 597-5000
fax (704) 599-4307
Terex South Dakota Inc.
Attn.: Sarah Corey
500 Oakwood Road
Watertown, SD 57201
voice (605) 884-3830 (Sarah C.)
fax (605)882-5573
Relationship Manager
Corporate Banking
Dow AgroSciences LLC
Indianapolis, IN
httpS:/IcMditreLarence.dow.com/
Customer Code: W029267
Standard Register
Arlene Avers, Supervisor
Credit Services Team
600 Albany Street
Dayton, OH, 45417
voice (937) 221-1000
41 Years at Blair Mill Road location
7/27/2015
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
In accordance with Title 23 United States Code Section 112 and Public Contract Code 71015 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine
and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any
other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired,
connived or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall
refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any
BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other
BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid,
Note: The above Non -collusion Affidavit is part of the Proposal. Signing this Proposal on
the signature portion thereof shall also constitute signature of this Non -collusion Affidavit.
BIDDERS are cautioned that making a false certification may subject the certifier to criminal
prosecution. , I
I
Pres
State of S #Mniec Pen
County of Montgomery
Spbscribed and sworn to (or affirmed) before me on this _�Z 2- day of 200 by
1 ,Amar, proved to me on the basis of satisfactory evidence to be the
persons) who appeared before me
tart' lic i n ore Notary Public Seal
agBP-17
IP o
IAI. SEABP-17 LEY, No, Montgxpires
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract,
certifies as follows:
1. The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such
action shall include, but not be limited to, the following: employment, upgrading,
demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates
of pay or other forms of compensation; and selection for training, including apprenticeship.
The Contractor agrees to post in conspicuous places, available to employees and applicants
for employment, notices to be provided setting forth the provisions of this
nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which
he/she has a collective bargaining agreement or other contract or understanding, a notice
to be provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
S. The Contractor shall furnish all information and reports required by Executive Order 11246
of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto, and will permit access to his/her books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation, to ascertain
compliance with such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible
for further Government contracts or federally assisted construction contracts in accordance
with procedures authorized in Execution Order 11246 of September 24, 1965, and such
IM
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
other sanctions may be imposed and remedies invoked as provided in Executive Order
11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or
as otherwise provided by law.
7. The Contractor shall include the portion of the sentence immediately preceding paragraph
(1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant
to Section 204 of Executive Order 11246 of September 24, 1565, so that such provisions will
be binding upon each subcontract or purchase order as the administering agency may direct
as means of enforcing such provisions, including sanctions for noncompliance; provided,
however, that in the event the Contractor becomes involved in, or is threatened with,
litigation with a subcontractor or vendor as a result of such direction by the administering
agency, the Contractor may request that the United States enter into such litigation to
protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and
as amended,
No discrimination shall be made in the employment of persons upon public works because of
race, religious creed, color, national origin, ancestry, physical handicaps, mental condition,
marital status, or sex of such persons, except as provided in Section 1420, and any contractor of
public works violating this Section is subject to all the penalties imposed for a violation of the
Chapter.
Signed:
Gre nidnt Holman
Title: vice
Firm: Asplundh Construction Corp.
Bate: February 22, 2016
I
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
STATEMENT REGARDING APPFRENTiCESHIP REtOI,IIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777,5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall.
1. Apply to thejoint apprenticeship committee administering the apprenticeship standards
of the craft or trade in the area of the site of the public work for a certificate approving the
contractor under the apprenticeship standards for the employment and training of apprentices
in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated
in the apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs
journeymen or apprentices on the public work, in the same amount or upon the same basis and
in the same manner as the other contractors, except contractors not signatory to the trust
agreement shall pay a like amount to the California Apprenticeship Council,
Signed:
GregoHolman
Title: Vice PZident
Firm: Asplundh Construction Corp.
Date: February 22, 2016
MW
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by
these bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (25 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation
to which he/she is otherwise entitled.
Signed:
Grego Oman
Title: Vice sident
Firm: Asplundh Construction Corp.
Date: February 22, 2016
BP -21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
PUBLIC CONTRACT CODE SECTION 10162 QUESTiONAIRE
In conformance with Public Contract Code Section 10182, the BIDDER shall complete, under
penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented
from bidding on, or completing a federal, state, or local government project because of a
violation of law or a safety regulation?
Yes No
If the answer is yes, explain the circumstances in the following space.
BP -22
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
M2011119r r:rWin 411MU21
INTENT OF PROPOSAL.
The purpose of this Proposal is to identify a Prime Contractor to enter into a contract with the
City of Santa Ana, referred to as AGENCY, to complete the Work shown on the Contract
Documents.
PROPOSAL
The Proposal shall be submitted in accordance with the Notice Inviting Bids and shall be
accompanied by the following documents:
1. Bid Proposal
2. Bidder's Statement
3. Contractor's Licensing and Registration Statement
4. Prevailing Wage Compliance and Monitoring Statement
S. Ownership Affidavit
6. Bid Bond
i. List of Subcontractors
S. References
9. Additional References
10, Non -Collusion Affidavit
11. Non -Discrimination Certificate
12. Statement Regarding Apprenticeship Requirements
13. Statement Regarding 'Anti-Kickback"Requirements
14. Public Contract Cade Section 10162 Questionnaire
The Proposal may be considered non-responsive if any of these documents or forms isnot
included. The bid package shall be submitted as instructed in the Notice Inviting Bids. It is the
BIDDER'S responsibility to ensure delivery of the Proposal to the location and prior to the bid
opening hour stipulated in the Notice Inviting Bids, Late Proposals will not be considered.
CALIFORNIA STATE LABOR CODE
As outlined in the Notice inviting Bids, this project is subject to compliance monitoring and
enforcement by the State of California Department of Industrial Relations, per Section
1771.4.a.1. BIDDERS are required to inform themselves fully of the conditions relating to
construction and labor under which the work will he performed. Any contract entered into
pursuant to this notice will incorporate the provisions of the California State Labor Code. Per
Section 171.4.a,2, Contractors are required to post job site notices, as prescribed by regulation.
M
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
EXAMINATION OF CONTRACT DOCUMENTS ANO PROJECT SITE
BIDDERS shall satisfy themselves by personal examination of the work site, Contract Documents
including the Plans and Specifications (and by any other means as they believe necessary) as to
the actual physical conditions, requirements, and difficulties under which work must be
performed.
DISCREPANCIES AND MISUNDERSTANDINGS
No BIDDER shall at any time after submission of a proposal make any claim or assertion that
there was any misunderstanding or lack of information regarding the nature or amount of work
necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies
found in the Contract Documents including the Plans and Specifications shall be called to the
attention of the AGENCY as a Request for Clarification and addressed prior to the submission of
bid proposals.
REQUESTS FOR INTERPRETATION OF CONTRACT DOCUMENTS
Requests for interpretation must be received at least five (5) working days prior to the bid
opening date. The person submitting the request will be responsible for its prompt delivery.
Any interpretation or correction of the documents will be made only by an Addendum.
ADDENDA
All addenda issued during open bid advertisement period will be posted on the City of Santa
Ana website and shall become part of the Contract Documents. Before submitting a Proposal,
each BIDDER is responsible to become self -informed as to whether or not addenda have been
issued. It is the BIDDER's responsibility to notify the AGENCY regarding receipt of addenda.
WITHDRAWAL OF PROPOSAL
A Proposal may be withdrawn by submitting a written request signed by the BIDDER. Such
requests must be delivered to the AGENCY'S Public Works Agency Executive Director prior to
the bid -opening hour stipulated In the Notice Inviting Bids.
Proposals may not be withdrawn after said hour without forfeiture of the proposal guarantee
which shall remain in effect for 60 days after opening bids. The withdrawal of the bid proposal
will not prejudice the right of the BIDDER to submit a new bid proposal, providing there is time
to do so, or to submit a new bid proposal if the is a rebidding of the same project.
BID PROTEST
Any bid protest must be submitted in writing to Executive Director of Public Works Agency, City
of Santa Ana, 20 Civic Center Plaza M-21, Santa Ana, CA 92701 before 5:00 p.m. of the 5th
business day following bid opening. Bid protests sent via mail or overnight carrier must be
received by the AGENCY by 5:00 pm of the 5th business day following bid opening in order to
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15.6$28
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
be deemed timely. Hand delivered protests must be provided to the receptionist in the City
Hall Annex/Public Works Counter on the first floor of the City Hall Annex.
a. The initial protest document shall contain a complete statement of the basis for the
protest.
b. The protest shall refer to the specific portion of the Contract Document which forms the
basis for the protest,
c. The protest shall include the name, address, and telephone number of the person
representing the protesting party.
d. The party filing the protest shall concurrently transmit a copy of the initial protest
document and any attached documentation to all other parties with a direct financial
interest, which may be adversely affected by the outcome of the protest. Such parties
shall include all other BIDDERS or proposers who appear to have a reasonable prospect
of receiving an award depending upon the outcome of the protest, If staff is aware a
protest has been filed prior to the opening of bids, the AGENCY shall announce at bid
opening who such parties shall be,
e. Should a written bid protest be filed in a timely fashion, a protest hearing shall be held
before the Executive Director of Public Works or designee by the 10th business day from
receipt of protest. All interested parties may appear and offer testimony at this bid
protest hearing. Formal rules of evidence shall not apply at this hearing, nor shall
testimony under oath be required. The burden of proof shall be on the party submitting
the protest to demonstrate that the staff's determination of proposed low BIDDER is
arbitrary and capricious, or unsupported by substantial evidence in the record.
f, All BIDDERS are advised that if you challenge the AGENCY"s award of contract in court,
you may be limited to raising only those issues you or someone else raised at the public
hearing described above, or in written correspondence delivered to the Executive
Director of Public Works at or prior to the public hearing.
g. The Executive Director of Public Works or designee will issue a written decision to the
City Council on the protest, which shall also be promptly provided to all interested
parties, If the Executive Director of Public Works or designee determines that a protest
Is frivolous, the party originating the protest may be determined to be irresponsible and
that party may be determined to be ineligible for future contract awards,
h. The procedure and time limits set forth in this paragraph are mandatory and are the
BIDDER's sole and exclusive remedy in the event of Bid protest, and failure to comply
with these procedures shall constitute a waiver of any right to further pursue the bid
protest, including filing a Government Code Claim or legal proceedings.
Vi
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
BID PROPOSAL
The definitions for Bid Items that are identified in the Bid Proposal form are provided in
Appendix A.
The AGENCY will check each bid item unit price and amount for all the bids submitted. In case
of a discrepancy between the correct product of the quantity multiplied by the unit price and
the subtotal amount entered by the BIDDER, the correct unit price shall prevail and the product
will be correctly accordingly.
In case of a discrepancy between the correct sum of the individual subtotal amounts and the
total bid amount entered by the BIDDER, the correct sum shall prevail. If a unit price is not
legible or is missing, the amount for that contract bid item shall be divided by the quantity to
arrive at the unit price. The bid total shall be corrected and the results shall be considered as
representing the bidder's Intention. Proposals in which the prices are obviously unbalanced
may be rejected.
If a Bid contains discrepancies that make it difficult or impossible to determine the bidder's
intention, then such Bid may he considered unresponsive, in which case the bid may be
rejected.
Time for Completion
The time for completion of this project, and the liquidated damages amount when/if the time
for completion is exceeded, is included in the Bid Proposal Section of these Contract
Documents.
BIDDERS STATEMENT
In accordance with Section 7028.15(e) of the Business and Professions Code, a licensed
contractor shall not submit a bid to the public agency unless his or her contractor's license
number appears clearly on the bid, the license expiration date is stated, and the bid contains a
statement that representations made therein are made under penalty of perjury. Any bid not
containing this Information or a bid containing information, which IS Subsequently false, shall be
considered non-responsive and shall be rejected by the public agency. Format for these
statements are included in the Bid Proposal section of these Contract Documents.
In accordance with the Section 3300 of the California Public Contract Code, the Agency has
determined that the BIDDER shall possess a license in the classification specified in the Notice
Inviting Bids.
Vii
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
OWNERSHIP AFFIDAVIT
An Ownership Affidavit is required to be completed and submitted with the Bid Proposal, A
form is provided in the Bid Proposal section of these Contract Documents.
PROPOSAL GUARANTY (810 BOND)
Each bid shall be accompanied by a Proposal Guaranty as instructed in the Notice Inviting Bids.
A sample Bid Bond is Included in the Bid Proposal Section of these Contract Documents,
LIST OF SUB -CONTRACTORS
The State of California Public Contract Code requires listing of all subcontractors who intend to
perform work which is Yz % of the bid or $10,000 (streets, highways and bridge projects),
whichever is greater, or % % of the bid (buildings, parks, or other projects). A form for this
information is provided in the Bid Proposal section of these Contract Documents.
{REFERENCES/ADDITIONAL REFERENCES
BIDDER shall include a list of three public agencies for which BIDDER has performed similar
work within past three (3) years, and three public agencies for which BIDDER and/or his
Subcontractor has performed similar work within the past five (5) years. A form for this
information is provided In the Bid Proposal section of these Contract Documents.
NON -COLLUSION AFFIDAVIT
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106, the
AGENCY shall require all bidders to execute and submit a non -collusion affidavit with the Bid
Proposal. A copy of the Non -Collusion Affidavit Is provided in the Bid Proposal section of these
Contract Documents.
NON-DISCRIMINATION CERTIFICATE
Attention is directed to Section 1735 of the California Labor Code, as added by Chapter 643,
Statutes of 1939, which reads as follows:
"No discrimination shall be made in the employment of persons upon public works because of
the race, religious creed, color, national origin, ancestry, physical handicap, medical condition,
marital status, or sex of such persons except as provided in Section 1420, and every contractor
for Public Works violating this Section is subject to all penalties imposed for a violation of the
Chapter."
A copy of the Certification of Nondiscrimination by Contractors is provided in the Bid Proposal
section of these Contract Documents,
Viii
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
Bidders shall be familiar with the requirements of Section 1777.5 of the California State Labor
Code regarding employment of apprentices and shall submit a Statement Regarding
Apprenticeship Requirements with the Bid Proposal. A copy of the Statement is provided in the
Bid Proposal section of these Contract Documents,
STATEMENT REGARDING "ANTI -KICK -BACK" REQUIREMENTS
Bidders shall be familiar with, and shall agree to comply with, the Copeland "Anti -Kickback" Act
(18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3), and shall
submit a Statement Regarding "Anti -Kickback" Requirements with the Bid Proposal. A copy of
the Statement is provided in the Bid Proposal section of these Contract Documents.
CONSTRUCTION CONTRACT AGREEMENT BONDS & INSURANCE
The Construction Contract Agreement is included in the project Contract Documents as
Appendix B, Sample Bonds are included as Appendix C, and Insurance Requirements are
included as Appendix D.
Following authorization by City Council to award a Construction Contract, written notification
will be given by the AGENCY to the successful BIDDER who will, within ten (10) business days,
submit to the Agency the completed and signed Construction Contract Agreement, a Faithful
Performance Bond, a Materials and Labor Bond, and evidence of Worker's Compensation
Insurance.
Failure to execute a contract and submission of acceptable bonds and insurance as provided
herein within the time limit above may be just cause for the annulment of contract award and
the forfeiture of the bid proposal guarantee.
No contract shall be binding upon the AGENCY until it has been completely executed by the
Contractor, approved by the City Attorney, and executed by the AGENCY.
After the AGENCY executes the Contract and approves the bonds and certificates of liability
insurance, the AGENCY will send the successful BIDDER a copy of the fully executed
Construction Contract Agreement.
RETURN OF PROPOSAL GUARANTIES
Within ten (10) days after the award of the contract, the AGENCY will return the proposal
guaranties, other than Bid Bonds, except any guaranties that have been forfeited.
ix
TRAVELERS POWER OF ATTORNEY
St. Paul Mercury Insurance Company
Farmington Casualty Company
St. Paul Mercury Insurance Company
Fidelity and Guaranty Insurance Company
Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, Inc,
Travelers Casualty and Surety Company of America
St. Paul Fire and Marine Insurance Company
United States Fidelity and Guaranty Company
St. Paul Guardian Insurance Company
Attorney -In Fact No. Certificate No. 006436949
230387
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurauce
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company are corporations duly organized corder the laws of the State of Connecticut, that Fidelity and Guaranty hrsurance Company is a
corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the
laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint
Michael .J. Herrod, Wendy W. Stuckey, Lisa A. Ward, Donna L. Williams, Anoop Chawla Adlakha, Lupe Tyler, Nancy Thomas, Vanessa Dominguez,
and Myisha Jefferson
of the City of Houston , State of Texas , their true and lawful Attorney(s)-iii-Fact,
each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted: in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signedand their corporate seals to be hereto affixed, this
day of January , 2016
21st
Farmington Casualty Company
St. Paul Mercury Insurance Company
Fidelity and Guarantydnsuxance-Company ;.
Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, Inc.
Travelers Casualty and Surety Company of America
St. Paul Fire and Marine Insurance Company
United States Fidelity and Guaranty Company
St. Paul Guardian Insurance Company
ensue Y pn[^¢bra,..® pN INS0�4 a„Jj',rvsoq y, ,up6v axoe W46unne r'e/0
o ^r*e 2S_ �4 797INCCfla1R4rEf1 G Ami �oxaonnin'csi\l, `w°:'oneoanre:,m4-
_ ITj '£!° —.� i HAfliFOPD, tn4 6
�b a Oy 1951 a �) SEAb4W S&AL;rr° caxx, c x q w 1696
State of Connecticut
City of Hartford ss.
By
Robert L. Raney, rotor Vice President
On this the 21st day of January 2016 , before me personally appeared Robert L. Raney, who aclnowledged himself to
be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul
Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers
Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing
instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
p,Tl7
In Witness Whereof, I hereunto set my hand and official seal. T/Ui
My Commission expires the 30th day of June, 2016. Ct AlIBLIG
58440-8-12 Printed in U.S.A.
`('f� ani, C . tdra
Marie C. Tctreaolo, Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity
and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paull Fire and Marine Insurance Company, St. Paul Guardian Insurance .
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice
President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Pact and Agents to act for and on behalf
of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the
Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any
of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may
delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy
thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking
shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the
Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Pace and Agents pursuant to the power
prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President. any Executive Vice President, any Senior Vice President, any Vice President,
any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any
certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secreraries or Attorneys -in -Fact for purposes only of executing and attesting bonds
and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal
shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on
the Company in the future with respect to any bond or understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance
Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and
Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing
is a true and correct copy of the Power of Attorney executed by said Companies, which is in Hill force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this s vA/'day of , 20
Kevin E. Hughes, Assistant Sect tary
rn6V.rf
9177 1951
.+`c?e5�9n,$,v,...Xom.R.Sa✓auL�oreg".d!ti:rowi, F. �f6ysni n a"Cm' aVru4e6�a/. vOo� , ary, �+�/\,,.C.•a�.9.•V.M.•.ve.� vsn
, a �Wi4fp
'J1niA94
YM89
A6 MCGa0 rvo ti
d,O
To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact its at www.travdl rsbond.com. Please refer to the Attorney -In -Fact number, the
above-named individuals and the details of the bond to which the power is attached.
STATI OF CALIFORNIA
DEPARTMENT OF INSURANCE
SAN FRANCISCO
Amended
Certificate of Authority
THIS IS To (,'r.RTIFY, i'Fsal, pursumoIto aha Ills lrratre Code of IIIc Stale q1' C'alrfornia,
Travelar:v Casualty and Suretp Company ofAnierlea
of ldarrloret, Caanecticut, wgani_ed aider the lata gf"C'onnectirul, sniiieer to its Ardeles oflucorporwinrt or•
otltoar fiurotrunatttu! organixtionnf tlorrrrnents, is herehy mahorimi to transact within this State, suhJec to all
prwdsions of this Cert{ficate, thefollowing eahtsa`es ofhlslowil ;
Fire, Murine, Surety, ❑Isubfilly, Plate Class, Liability, Workers' Compensation,
Common Carrier Liability, Bailer and Machluery, Burglary, Credit, Sprinkler,
Team and Vehicle, Automobile, Aircraft, and Misecllutwous
as vwh c•lussea are now or rngy hereafter be dt?findd hi the Insurance Lathy ofthe Sane of (.".alifru•uiu,
THIS C RTIFiC;ATF is twwessl'v condidoried upon the holder hereof now and hereaAer bel'rrq In�dl
comp hanee with all, wttl not it, violation of any, grdw applicable laws and lawfid rerptirau:eltra made ander
n ithorito of the kn, s gfd,e State of C: lh'forala as long as such (arors or I.Fgvireanews are bt affect and apptlicohle,
ail as such dm s and refuiramenes now are, or m n, hereafter he chrrn (?d oe amended.
IN WITNESS WHEREOF, effective cis of the I.st cltty af,tsly, 1997, 1 have
herearnlo s41 sty hanrt curd rorztsed n9}> gj%icinl seal tai+e caf fixes{ this i6th
dqv cfJnne, 1997.
Fee SQ.00 Chuck Qunkenbush
Ins,�mncc O'mm�ds'saanad
Rae, No.
Filed 5/18197
I1,1+ Yielarin .S. S'idhnry
Aipu(r
Cet•tifrcetlou
1, the wic"Losigued lnsarunce Commissioner of the .Slate of California, do hereby ("erti(, clues 1 have
eompared the above copv ofC'eriiyicate af�l uthorlly rrilh aha duppe[ara oforigmed now on file in my ufflcu, and
that ilre same: is a,hdl, true, and corr".v transcript thereef,' mid of the whole of"said'hiplicate, and said
Certitirum of.4whorill is naw infiliflare emd glrcct.
IN WITNESS N✓Hrnor, [have hareunto .vet aN official
seal io beaffixed fixed this 31sr day ofDecentber, 2007.
Steve Pointer
{�bi9wivnCu' C4n[l➢iwYlJHdv
e, I nt-Ww �i V�tr-�te
1'aruline i)1,ndraa
JASP
CONSTRUCTION CORP.
AIMEE ELIZONDO
REGION MANAGER
ANAHEIM WAV
am, CA 92805 CELL: 714-822-9964
aelizondo@asplundh.com FAX: 714-276-0520
ICry
"Ross
1A&tC>o2 t`SLifl
. C�oZi2i l7£� IZ
® L) rtit.
a
T��LrI 4� fS<
201.6 MAR I Pml . 4°f :08