HomeMy WebLinkAboutRESO 2017-01_1441 S Village Way (ATC Wireless Monopalm)RESOLUTION NO. 2017-01
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF SANTA ANA APPROVING CONDITIONAL
USE PERMIT NO. 2016-37, AS CONDITIONED, TO
ALLOW CONTINUED USE OF A 60 -FOOT HIGH
WIRELESS FACILITY ON THE PROPERTY LOCATED AT
1441 SOUTH VILLAGE WAY
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF
SANTA ANA AS FOLLOWS:
Section 1. The Planning Commission of the City of Santa Ana hereby finds,
determines and declares as follows:
A. The Derna Group ("Applicant"), representing ATC Sequoia LLC., is
requesting approval of Conditional Use Permit No. 2016-37 to renew the
entitlements of an existing 60 -foot high mono -palm major wireless
communications facility located at 1441 South Village Way.
B. Pursuant to Santa Ana Municipal Code (SAMC) Section 41-198.10, a
conditional use permit (CUP) is required for major wireless communications
facilities established in the City of Santa Ana.
C. SAMC Section 41-198.13 states that major wireless communications
facilities shall be approved for a period not to exceed five (5) years, although
subsequent legislative acts have required that such facilities be approved for
a period of not less than ten (10) years.
D. As the current facility is now over 10 years old, the applicant is required to
apply for a new CUP in order to maintain the entitlements of the facility
current.
E. On January 9, 2017, the Planning Commission held a duly noticed public
hearing on Conditional Use Permit No. 2016-37.
F. Santa Ana Municipal Code Section 41-638 authorizes the Planning
Commission to grant a conditional use permit upon making certain findings:
1. Will the proposed use provide a service or facility which will contribute
to the general well being of the neighborhood or the community?
The existing 60 -foot high wireless communications facility
will continue to provide a service and contribute to the
community. The facility will provide a service to Santa Ana
residents, businesses and motorists who subscribe to
Applicant's providers by providing cellular service and data
coverage for its users.
Resolution No. 2017-01
Page 1 of 5
2. Will the proposed use under the circumstances of the particular
case be detrimental to the health, safety, or general welfare of
persons residing or working in the vicinity?
The issuance of a conditional use permit to re -entitle this
existing wireless communication facility located at 1441
South Village Way will not be detrimental to persons residing
or working in the area as the facility will remain in
compliance with Federal Communications Commission
(FCC) and Federal Aviation Administration (FAA) safety
regulations. Furthermore, Federal law exempts local
jurisdictions from regulating health-related issues as these
issues are covered by Federal laws.
3. Will the proposed use adversely affect the present economic
stability or future economic development of properties surrounding
the area?
The existing wireless facility was designed as a mono -palm
to complement the existing landscape and will not adversely
affect the economic viability of the surrounding area. The
location of the facility to the rear of the property will maintain
the economic stability for this commercial and industrial area
by continuing to provide a service for businesses, owners,
workers, and residents in the area.
4. Will the proposed use comply with the regulations and conditions
specified in Chapter 41 for such use?
The use will continue to comply with all provisions pertaining
to the construction and installation of wireless facilities in
Chapter 41 (Zoning Code) of the SAMC. The existing
wireless communication facility was designed as a mono -
palm that exhibits consistency in tree size, character and
color to that of the surrounding vegetation and it is located
within a gated leased area and the ancillary electrical
equipment cabinets are screened by landscape.
5. Will the proposed use adversely affect the General Plan or any
specific plan of the City?
The wireless facility will not adversely affect the intent of the
General Plan as cellular facilities that are designed to be
compatible with the surrounding environment are consistent
with the goals and objectives of the City's Land Use
Element. Goal 1 promotes a balance of land uses to address
community needs, which includes means of communication
that will be served by the mono -palm. In addition, Goals 3
and 5 require preservation of neighborhood character and
Resolution No. 2017-01
Page 2 of 5
integrity as well as mitigation of development impacts. The
mono -palm's location minimizes visual impact on the area
and assists with the screening of the equipment. Further,
Policy 2.2 encourages land uses that accommodate the
City's needs for services. Enhancing a cell phone provider's
coverage in the area adds to the services that are readily
available for business owners, workers, and residents in the
immediate vicinity.
G. In accordance with the California Environmental Quality Act (CEQA) the
recommended action is exempt from CEQA per Section 15061(b)(3). This
exemption applies to projects where it can be seen with certainty that there
is no possibility that the activity in question may have a significant effect on
the environment. The project proposes to renew an existing major wireless
facility through the issuance of a new CUP. No expansion of square footage
or physical land disturbances are proposed as part of the project.
Categorical Exemption Environmental Review No. 2016-101 will be filed for
this project.
H. In accordance with the California Building Code Section 3108, the subject
telecommunication facility shall be designed, constructed, and/or maintained
in accordance with the provisions of TIA-222, which is a set of nationally
recognized standards for the constructions of telecommunication and
broadcast towers.
Section 2. The applicant agrees to indemnify, hold harmless, and defend the
City of Santa Ana, its officials, officers, agents, and employees, from any and all liability,
claims, actions or proceedings that may be brought arising out of its approval of this
project, and any approvals associated with the project, including, without limitation, any
environmental review or approval, except to the extent caused by the sole negligence of
the City of Santa Ana.
Section 3. The Planning Commission of the City of Santa Ana after conducting
the public hearing hereby approves Conditional Use Permit No. 2016-37 as conditioned
in Exhibit A, attached hereto and incorporated herein, for the project located at 1441
South Village Way. This decision is based upon the evidence submitted at the above
said hearing, which includes, but is not limited to: the Request for Planning Commission
Action dated January 9, 2017, and exhibits attached thereto; and, the public testimony,
written and oral, all of which are incorporated herein by this reference.
Resolution No. 2017-01
Page 3 of 5
ADOPTED this 9th day of January, 2017.
AYES: Commissioners: Alderete, Bacerra, Contreras -Leo, McLoughlin, Mendoza,
Nguyen, Verino (7)
NOES: Commissioners: None (0)
ABSENT: Commissioners: None (0)
ABSTENTIONS: Commissioners: None (0)
V�
L nette Verino
Chairperson
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By..
Lisa Storck
Assistant City Attorney
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, ROSA BARELA, Acting Recording Secretary, do hereby attest to and certify the
attached Resolution No. 2017-01 to be the original resolution adopted by the Planning
Commission of the City of Santa Ana on January 9, 2017.
Date: / / � I /
Acting Recording Secretary
City of Santa Ana
j
Resolution No. 2017-01
Page 4 of 5
Conditions of Approval for Conditional Use Permit No. 2016-37
Conditional Use Permit No. 2016-37 is approved subject to compliance, to the
reasonable satisfaction of the Planning Manager, with all applicable sections of the
Santa Ana Municipal Code, the California Administrative Code, the California Building
Standards Code and all other applicable regulations.
The applicant must comply in full with each and every condition listed below prior to
exercising the rights conferred by this conditional use permit.
The applicant must remain in compliance with all conditions listed below throughout the
life of the conditional use permit. Failure to comply with each and every condition may
result in the revocation of the conditional use permit.
Planning Division
1. Any amendment to this conditional use permit must be submitted to the Planning
Division for review. At that time, staff will determine if administrative relief is
available or the conditional use permit must be amended.
2. The proposed facility shall be maintained as per approved plans and any existing
landscaping shall be protected in place while any required improvements are
installed for the 60 -foot wireless facility.
3. The permit applicant shall provide a 24-hour phone number to which interference
problems may be reported. This condition will also apply to all existing facilities in
the City of Santa Ana.
4. The permit applicant will provide a "single point of contact" in its Engineering and
Maintenance Departments to insure continuity on all interference issues. The name,
telephone number, fax number and e-mail address of that person shall be provided
to the City's designated representative upon activation of the facility.
5. The permit applicant shall insure that lessee or other user(s) shall comply with the
terms and conditions of this permit, and shall be responsible for the failure of any
lessee or other users under the control of permit applicant to comply.
6. All deteriorating and/or faded stealth fronds shall be replaced and all antennas shall
be painted a darker green to match the frond color of the surrounding palm trees.
7. Replant drought tolerant vines on wrought iron fence and groundcover along the
edges of the facility.
8. Applicant acknowledges and agrees that the permit is expressly conditioned on the
applicant maintaining the subject property in a well-maintained condition, including
the surrounding landscape.
9. Conditional Use Permit No. 2016-37 expires 10 years from the date of City Council
approval.
Resolution No. 2017-01
Page 5 of 5