HomeMy WebLinkAbout55A - ROAD MAINTENANCE CIPREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
APRIL 17, 2018
TITLE:
ADOPT A RESOLUTION RECOGNIZING
ROAD MAINTENANCE AND
REHABILITATION ACCOUNT FUNDING IN
FISCAL YEAR 2018-19 CAPITAL
IMPROVEMENT PROGRAM
(STRATEGIC PLAN NO. 6, 1G)
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED
❑ As Recommended
❑ As Amended
❑ Ordinance on 151 Reading
❑ Ordinance on 2"d Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Adopt a Resolution (Exhibit 1) which affirms eligible SB -1 Projects and which is required to
submit such projects list to the California Transportation Commission (CTC) for budgeting Fiscal
Year 2018-19 Capital Improvement Program (CIP) and for City eligibility to receive Road
Maintenance and Rehabilitation Account (RMRA) Funding.
DISCUSSION
Senate Bill 1 (SB -1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of
2017), was passed by the Legislature and signed into law by the Governor in April 2017, to
address basic road maintenance, rehabilitation, and critical safety needs on both the state
highway system and the local streets and roads system. The guidelines for this new Road
Maintenance and Rehabilitation Account (RMRA) funding, which was adopted by the California
Transportation Commission (CTC) in August 2017, specify that before eligible local agencies can
receive their apportionment of the RMRA funds in a given fiscal year, they are required to adopt a
list of proposed projects (Exhibit 1).
It is estimated that the City will receive approximately $5,668,325 in FY 2018-19 from RMRA
funding. To be eligible to receive this funding, the City must submit a proposed project list to the
CTC by May 1, 2018, along with a resolution with specific RMRA funding allocations to be
incorporated into the FY 2018-19 CIP Budget. In order to meet SB -1 eligibility and reporting
requirements, RMRA funding must be specifically differentiated from the Highway Users Tax
Account (HUTA) funding. Each RMRA funded project is required to include the following
information: project description, specific location, proposed schedule for its completion, and the
estimated useful life. Consequently, staff prepared FY 2018-19 CIP Project Sheets (Exhibit 2)
accordingly.
55A-1
Resolution — FY 2018-19 S13-1 RMRA Project List
April 17, 2018
Page 2
As part of various accountability and transparency measures pursuant to SB -1, the City will
annually submit a proposed RMRA project list to the CTC and subsequently provide year end
updates on the progress of previously proposed projects. Given the need for these street
improvements and the project eligibility requirements defined by the CTC, staff recommends that
the City Council adopt a resolution recognizing the proposed project list utilizing RMRA 2018-19
funds.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities &
Infrastructure, Objective #1 (Establish and Maintain a Community Investment Plan for All City
Assets), Strategy G (Develop and Implement the City's Capital Improvement Program in
Coordination with the Community Investment and Deferred Maintenance Plans).
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Pursuant to the California Transportation Commission's (CTC) March 2018 Annual Reporting
Guidelines for Local Streets and Roads Funding, staff has identified a total of 9 (nine) CIP
projects to be funded with anticipated FY 2018/19 RMRA revenue in the table shown below. The
FY 2018-19 CIP budget was prepared using the California Department of Finance RMRA
January 2018 estimate of $5,668,325.
Fiscal Year 2018-19 — Potential SB 1 Road Repair and Accountability Act Projects
PROJECT
LOCATION
DESCRIPTION
COST
Raitt Street
McFadden Avenue to Civic Center Drive
Road Rehabilitation
$980,000
Edinger Avenue
Raitt Street to Bristol Street
Road Rehabilitation
$900,000
Bristol Street
MacArthur Boulevard to Railroad (N/O Alton)
Road Rehabilitation
$700,000
Raitt Street
Edinger Avenue to McFadden Avenue
Preventative Maintenance/
Slurry
$300,000
Main Street
Dyer Road to Warner Avenue
Road Rehabilitation
$600,000
Alton Avenue
Raitt Street to Bristol Street
Road Rehabilitation
$1,035,000
Main Street
1st Street to Civic Center Drive
Preventative Maintenance/
Slurry
$376,000
V Street
City Limit to Newhope Street
Preventative Maintenance/
Slurry
$687,000
McFadden
Avenue
Fairview Street to Raitt Street
Road Rehabilitation
$90,325
Grand Total: $5,668,325
55A-2
Resolution — FY 2018-19 SB -1 RMRA Project List
April 17, 2018
Page 3
APPROVED AS TO FUNDS & ACCOUNTS:
Edwin "William" Galvez, . . Francisco Gutierrez
Acting Executive Director Executive Director
Public Works Agency Finance & Management Services Agency
Exhibit: 1. Resolution and Proposed FY 2018-19 List of Projects
2. FY 2018-19 CIP Project Sheets
55A-3
55A-4
jmf 3/19/18
RESOLUTION NO. 2018 -XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA ADOPTING A LIST OF PROJECTS TO BE
FUNDED BY SB 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS
FOLLOWS:
Section 1. The City Council of the City of Santa Ana hereby finds, determines and
declares as follows:
A. Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017, was
passed by the Legislature and signed into law by the Governor in April 2017 in order to
address the significant multi -modal transportation funding shortfalls statewide.
B. SB 1 includes accountability and transparency provisions that will ensure
the residents of the City of Santa Ana are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year.
C. The City must establish a list of all projects to receive funding from the Road
Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include
a description and the location of each proposed project, a proposed schedule for the
project's completion, and the estimated useful life of the improvement.
D. The City of Santa Ana will receive an estimated $5,668,325 in RMRA
funding in Fiscal Year 2018-19 from SB 1.
E. The funding from SB 1 will help the City maintain and rehabilitate local
streets and roads and provide resources for similar projects in the future.
F. Modernizing the local street and road system is critical for interconnectivity,
multimodal needs, and commerce.
G. The SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance, safety, and investing in complete streets
will have significant benefits statewide.
Section 2. The City of Santa Ana adopts the following list of projects planned
to be funded with Road Maintenance and Rehabilitation Account (RMRA) revenues for
Fiscal Year 2018/19,
Resolution No. 2018 -XXX
"99%!
5 Page 1 of 3
jmf 3/19/18
Project Name
Location
Description
Proposed
Project
Completion
Estimated
Useful Life
Road Projects:
Raitt Street
McFadden Avenue to Civic Center
Drive
Road Rehabilitation
12/31/18
20 YR
Edinger Avenue
Raitt Street to Bristol Street
Road Rehabilitation
12/31/18
20 YR
Bristol Street
MacArthur Boulevard to Railroad
(N/O Alton)
Road Rehabilitation
12/31/18
20 YR
Raitt Street
Edinger Avenue to McFadden
Avenue
reventative
Maintenance / Slurry
12/31/18
10 YR
Main Street
Dyer Road to Warner Avenue
Road Rehabilitation
12/31/18
20 YR
Alton Avenue
Raitt Street to Bristol Street
Road Rehabilitation
12/31/18
20 YR
Main Street
1st Street to Civic Center Drive
Preventative
Maintenance / Slurry
12/31/18
10 YR
McFadden Avenue
Fairview Street to Raitt Street
Road Rehabilitation
12/31/19
20 YR
1st Street
City Limit to Newhope Street
Preventative
Maintenance / Slurry
12/31/18
10 YR
Section 3. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote adopting
this Resolution.
ADOPTED this _ day of , 2018.
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:
John M. Funk
Assistant City Attomey
Miguel A. Pulido
Mayor
y
Resolution No. 2018 -XXX
Page 2 of 3
AYES:
NOES:
ABSTAIN:
NOT PRESENT:
Councilmembers
Councilmembers
Councilmembers
Councilmembers
CERTIFICATE OF ATTESTATION AND ORIGINALITY
jmf 3/19/18
I, Maria D. Huizar, Clerk of the Council, do hereby certify the attached Resolution No.
2018- to be the original resolution adopted by the City Council of the City of Santa
Ana on
Date:
2018.
Clerk of the Council
City of Santa Ana
Resolution No. 2018 -XXX
Page 3 of 3
55A-7
y •
EXHIBIT 2
S131 Road Repair and Accountability Act Projects Worksheets
55A-9
Raitt Street Rehabilitation: McFadden Avenue to I
Civic Center Drive
Street Improvements
Artenal Street Rehabihfahon
LOCATION MAP
(.STY OF SANT FY 1&19, - -a"`
CawriRLIMPRovE wOAKbHEET .
DESCRIPTION:
Hon/resurfacing orenshng pavement and
Onstallaaon of missing "damaged,
!rs. sidewalk& dnveway approaches. and
ramps within this segment ormadway.
)JECT NEED:
segment or Reid Street from McFadden to Ovic
ter has been identified as a high
ily by The City's Pavement Management System.
pavement is detenora0ng due to weather age. and
ry usage. Some of the adjacent curbs. gutters.
Tway approaches, curb ramps, and sdewalks are
in vanous states of disrepair and require
PROJECT COSTS FY /819 FY 1920 FY 7021 FY 2122 FY 2223 FY 2124 FY 24125
Conslrugian 890],000
Engewen g 973.000
TOTAL 99e0,000
s., d
PROJECT FUNDS FY 18119 FY 1920 FY 2021 FY 2122 FY 2223 FY 2324 FY 7425
RMRF 8990,000
TOTAL $9e0,000
Public Works Agency Design Engweenng
Jason Gabriel, Principal Civil Engineer 12 -Mar -2018
EXHIBIT 2
-1-
55A-10
_I
(.STY OF SANT FY 1&19, - -a"`
CawriRLIMPRovE wOAKbHEET .
DESCRIPTION:
Hon/resurfacing orenshng pavement and
Onstallaaon of missing "damaged,
!rs. sidewalk& dnveway approaches. and
ramps within this segment ormadway.
)JECT NEED:
segment or Reid Street from McFadden to Ovic
ter has been identified as a high
ily by The City's Pavement Management System.
pavement is detenora0ng due to weather age. and
ry usage. Some of the adjacent curbs. gutters.
Tway approaches, curb ramps, and sdewalks are
in vanous states of disrepair and require
PROJECT COSTS FY /819 FY 1920 FY 7021 FY 2122 FY 2223 FY 2124 FY 24125
Conslrugian 890],000
Engewen g 973.000
TOTAL 99e0,000
s., d
PROJECT FUNDS FY 18119 FY 1920 FY 2021 FY 2122 FY 2223 FY 2324 FY 7425
RMRF 8990,000
TOTAL $9e0,000
Public Works Agency Design Engweenng
Jason Gabriel, Principal Civil Engineer 12 -Mar -2018
EXHIBIT 2
-1-
55A-10
ROJECT TITLE.
Edinger Avenue Rehabilitation: Raitt Street to
Bristol Street
4OJECT CATEGORY*
street Improvements
Arsenal Street Rehabilitation
LOCATION MAP
CITY OF SANTA ANA FY 18/19
CAPITAL IMPROVEMENT PROJECT WORKSHEET
CT DESCRIPTION.
Imctionrresurfacing or existing pavement and
rkmOnstalla0on of missing or damaged, curbs.
sidewalks. driveway approaches. and
,air ramps within this segment of roadway.
PROJECT NEED.
The City's Pavement Management Program has been
developed to identify total petered maintenance
requirements for the City's anginal network and to move
toward preventative maintenance. As one of the City's
artenal streets. Edinger Avenue pavement rehabilitation
is idenbhed as a high pnonty in the Pavement
Management Program.
PROJECT COSTS FY 79119 FY 1920 FY 2021 FY 2122 FY 2229 FY 2324 FY 2425
Conshucuon $633000
Engmeenn0 $67 DOC
TOTAL $900,000
PROJECT FUNDS FY 19/19 FY 1920 FY 2021 FY 2122 FY 2223 FY 2324 FY 24125
RMRA 6900000
TOTAL $900,000
Public Works Agency Design Engineenng
Jason Gabriel, Principal Civil Engineer 12 -Mar -2018
_1_
55A-11
Bristol Street Rehabilitation: MacArthur
Boulevard to Railroad I O Alton)
30JECT CATEGORY:
Street Improvements
Arterial Sheet Rehabilitation
LOCATION MAP
CT DESCRIPTION:
ructlonhesudacing of existing pavement and
r eriMnstallahon of missing or damaged, curbs.
sidewalks, driveway epimiaches. and
Pair ramps within this segment of madway.
)JECT NEED:
City's Pavement Management Program has been
doped to identify total deferred mamlenimm
hements for the City's arterial network and to move
vd preventative maintenance. As one of the City's
ial streets. MacArthur Boulevard pavement
bilitation is idenhhed as a high priority in the
PROJECT COSTS FY 1819 FY 1920 FY 2021 FY 2122 FY 2223 FY M4 FV 2425
ConsOunion 5640,000
Engimenn9 $52.000
TOTAL 9100,000
PROJECT FUNDS FY 18/19 FY 1920 FY 20,121 FY 21,22 FY2223 FY 2324 FY 2425
RMRA S100p0)
TOTAL 9100,000
Public Works Agency Design Engineering
Jason Gabriel, Principal Civil Engineer 12 -Mar -2018
55A-12
PROJECT TITLE:
Raiff Street Slurry Resurfacing: Edinger Avenue
to McFadden Avenue
oROJECT CATEGORY:
Stmt Improvements
Adana) Street Rehabiitalion
LOCATION MAP
CITY OF SANTA ANA FY 18119
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION.
AppFcefron of slurry seal to roadway and
replacementMstallakon of missing or damaged curbs
gutters. sidewalks, driveway approaches. and
wheelchair ramps within the segment
PROJECT NEED.
The City's Pavement Management Program has been
developed to identify the preventahve maintenance
requirements for the City's street network The
application of a surface seal to sheets with
improvements constructed in the last 10 years will
ensure a high level of service for years to come
PROJECT COSTS FY 18019 FY 19120 FY 2021 FY 21/22 FY 22/29 FY 2324 FY 24125
conakudan ans.aao
Ergaieenrp E25.000
TOTAL E000•o00
PROJECT FUNDS FY 18/19 FY Iwo FY 2021 FY 2122 FY 2223 FY 2324 FY 2425
RMRA E'00,g00
TOTAL E300,o00
Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 12 -Mar -2018
-1-
55A-13
PROJECT TITLE:
Main Street Rehabilitation. Dyer Road to
Avenue
PROJECT CATEGORY:
Stmet improvements
Arteria/ Street Rehabilitation
Ll AI IUN MAY
FY 18119 FY 1920 FY 20121 FY 21fn FY 2223 FY 23x24 FY 2425
Concvu,twn
$556,000
,`
N
$ao 000
TOTAL
77o,00o
PROJECT FUNDS
FY 19/19 FY 1920 FY 2021 FY 2122 FY 2223 FY 2324 FY 2425
RMRn
s500.000
TOTAL
$600,000
MF
wxw.r.w.
Wm a..
k,v
CITY OF SANTA ANA FY 18t19
CAPITAL IMPROVEMENT PROJECT WORKSHEET
Reconstruchonlresurfacing of existing pavement and
mplacemenNnstallalon of missing or damaged, curbs,
gutters. sidewalks driveway appmachesand
wheelchair ramps within this segment of madway
PROJECT NEED.
The City"s Pavement Management Program has been
devebpad to ldentity total defend maintenance
requirements for the City's animal network and to move
toward Irmentahve maintenance. As one of the City's
artenal sheets. Main Street pavement rehahi6tation a
identified as a high priority in the Pavement
PROJECT COSTS
FY 18119 FY 1920 FY 20121 FY 21fn FY 2223 FY 23x24 FY 2425
Concvu,twn
$556,000
En9mee ng
$ao 000
TOTAL
77o,00o
PROJECT FUNDS
FY 19/19 FY 1920 FY 2021 FY 2122 FY 2223 FY 2324 FY 2425
RMRn
s500.000
TOTAL
$600,000
Public Works Agency Design Engineering Jason Gabriel Principal Civil Engineer 12 -Mar -2018
-1-
55A-14
Alton Avenue Rehabilitation. Raiff Street to
Bristol Street
Street Improvements
Adenal Street Rehabilitation
LOCATION MAP
AGENCY:
Public Works Agency
CITY OF SANTA ANA FY 18/19
CAPITAL IMPROVEMENT PROJECT WORKSHEET
DESCRIPTION.
nentanstallab'on of missing or damaged. curbs.
sidewalks. driveway approaches. and
or amps within this segment of roadway
PROJECT NEED.
The Gty's Pavement Management Program has been
developed to denfify total deferred maintenance
requirements Por, the City's arfenal network and b move
toward prevemlbhve maintenance. As one of the City's
adenal streets. Afton Avenue pavement mhadgtabon is
identified as a togh pdonty in the Pavement
Management Program.
PROJECT COSTS FY 111119 Fv 1920 FY 20(21 FY 21/12 FY 22123 FY 23/14 FY 2425
Cmslructan $9m=
Erq,neenrg ET7,coo
TOTAL $1,035,MO
PROJECT FUNDS V'r 11119 FY 1920 FY tom FY 21422 FY 22123 FY 23424 FV 2425
RMRA 41,935,909
TOTAL $1,035,009
Design Engineering
Jason Gabriel. Principal Civil Engineer 12 -Mar -2018
55A-15
PRUJEC I HILL:
LE:
Main Street Slurry Resurfacing. tat Street to
Civic Center Drive
Street Improvements
Arsenal Street Rehabilitation
CITY OF SANTA ANA FY 18119
CAPITAL IMPROVEMENT PROJECT WORKSHEET
DESCRIPTION:
of slurry seal to maNvay antl
Onsta/Wtion of missing or damaged curbs.
.walks, dnveway approaches. and
remps within the segment.
PROJECT NEED.
The Gty's Pavement Management Program has been
developed to identify the preventative maintenance
requirements for the Gtya street network. The
appitcalion of a surface seal to sheets with
improvements constructed in the last 10 years will
ensure a high level of service for years to come.
PROJECT COSTS
FY 18/19 FY 1920 FY 20121 FY 21M FY 2223 FY 2324 FY 2425
confit u m
5348.000
Enyneenrg
$28.000
TOTAL
$376,000
PROJECT FUNDS
FY 18119 FY 1920 FY 2021 FY 2182 FY 2223 FY 2324 FY 2425
RMRA
6346000
TOTAL
$376,000
AGENCY, DIVISION. CONTACT: DAT :
Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 12 -Mar -2018
-1-
55A-16
-ROJECT TITLE:
1st Street Slurry Resurfacing: City Limit to
Newhope Street
oROJECT CATEGORY:
Street improvements
Arterial Sheet RehatA6tahon
CT DESCRIPTION:
bn of slurry seal to madway and
nent/installalion of missing ordamaged curbs,
Sidewalks. driveway approaches, and
air ramps within the segment
PROJECT NEED.
The City's Pavement Management Program has been
developed to identify the preventative maintenance
requirements for the City's street network The
application of a surface seal to straefs with
improvements constructed in the last 10 years will
ensure a high level of service for years to come
PROJECT COSTS FY 18/19 FY 1920 FY 2021 FY 2122 FY 2223 FY 23/24 FY 2x25
Construction i536,00C
En,ncr,. 0 $51,000 _
TOTAL $687,000
PROJECT FUNDS FY 18/19 FY 19/20 FY 2021 FY 2122 FV 2223 FY 2324 FY 24/25
RMRA $687.000
TOTAL $887,000
AGENCY: DIVISION: CONTACT'. DATE:
Public Works Agency Design Engineenng Jason Gabriel, Principal Civil Engineer 12 -Mar -2018
55A-17
'ROJECT TITLE:
McFadden Avenue Rehabilitation Fairview
Street to Raitt Street
aROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
w
.
CITY OF SANTA ANA FY 18119
CAPITAL IMPROVEMENT PROJECT WORKSHEET
CT DESCRIPTION:
ouctionhesudacing or existing pavement and
nent6nstallation ot missing or damaged. curbs.
sidewalks, dnveway approaches. and
'air ramps within this segment of roadway
PROJECT COSTS FY 16119 FY 1920
cWst dwn 61140615
En9meenrg 599.325
TOTAL 990,325 $1.140,675
)JECT NEED.
City's Pavement Management Pmgram has been
ibped m identify total defamed maintenance
irements for the City's adenal network and to move
nd preventative maintenance.
FY 2021 FY 2122 FY 2223 FY 2320 FY 2025
PROJECT FUNDS R 1819 FY 1920 FY 2021 FY 2122 FY 22123 FY 2324 FY 2485
RMRa 690,325 61,140.fi]5
TOTAL 690,326 11,140,8]6
Public Works Agency Design Engineenng Jason Gabriel, Principal Civil Engineer 12 -Mar -2018
E
55A-18