Loading...
HomeMy WebLinkAboutPOWERPOINT - 65A_CALIFORNIA WATER FIX California WaterFix 65A April 3, 2018 Recent Developments DWRapproved CA WaterFixin July 2017 • 9000 cfs, two tunnels, and three intakes – October 2017 MWDBoard approved financing • options February 2018 DWRannounced two-stage • construction option Stage 1: two intake structures, one tunnel, 6000 • cfspumps station Stage 2: one intake structure, one tunnel, 3,000 • cfspump station Stage 1 Two intake stucture • Single tunnel • 6,000 cfs • MWDshare will be 47% of SWP • MWDshare of total project 31.6% equals to • $5.3Billion Monthly Household cost is $2.40 • Questions Thank you