Laserfiche WebLink
�4 <br />LA ON-CALL ENGINEERING SERVICES PROPOSAL <br />� <br />RFP NO.:1ras3 <br />City of Santa Anal <br />ROB HIMEB, PE <br />R6b hos mord than 31 years of experience In municipal and tranapdrtatlon anlftnooring. He has worked with <br />municipalities, aganalesand CatbAhsto plan :and design highway, roadway, bddgo, and:ufilliy inftastruchur& <br />Improvements. Rob 19 a Principal of the firm and speciailYas in ail aspects Of transportation pr1�oj�arts ranging <br />fitom feaslbillEy, studies to final PS&E, He has a detailed Caltrans ZSC 'Groan <br />understanding ofthe WDM, HTO <br />Book% Ortel other applicable design guidelines and criteria. His focus Is on client cervico, ensuring, the deliverer <br />0 <br />of accurate work that serves our cjierl s.gggls, while working within budget -and targeted schoduta. <br />€'j <br />REPRESENTATIVE PROJECTS <br />fROCT:Oe <br />tl3t,,;C,PrinpH <br />AsobdateIn Charge f'dncipal to oharga for this IrrSprovemaitt projaot In, Nawpart Beach. Mark <br />`f <br />Thomas is providing engineering,' geometric and frertsportotion design senriods <br />, <br />EDUCATION to complete this. this roadway project that will greatly Improve pedestrian safety, <br />911; In Civil bicycle connedttvittr, and overall vehicular and multimodal operations. Key <br />Englnesting,: services Include Coltrane approval and pertmltting; paverttent rehabilitation,llnilversity.of <br />complete-streetslarban design, and bikelpod Improvements. <br />aliiornla, Berkeley MUL€(PL PAVEMENT RF�iASiLITAT10NS,.FULLERTON, t A <br />RCdiBlftA7lON Mark Thames Is provides can call clvjl ong(noesrinq _services forthe-Clty:of <br />f <br />AC468T : Fuiterion. Senrts tnctwde roadway pavement dssign drainage study; storm <br />drain arn9 sanitary sewer:ystomo, storm water management praeUees and <br />other misceilanaT civil engineering and matntenaneswork; The:foilowing task <br />411 <br />orders rare ourranfly in progresa nr rsoently contpteI I and :are representative of <br />t <br />the sample projects to be completed as part of the on-call corbact: Chapman <br />Avenue, Yorba Linda Boulevard Pavement. Rehemiitation, Commonwealth <br />, <br />Avenue Reconstruction Project, Berkeley Avenue pavement Rehabilitation, and <br />( r <br />Sunny Crest Drive Reconstruction Project <br />US 191 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />`f <br />Principal to chargelproject manager responsible for overseeing the preliminary <br />1 ; <br />design services to evaluate geometries for the $300M, 4.5 -mile HOV widening <br />t <br />and pavement rehabilitation projects. "rheprolect Involves the preparation of <br />c <br />35% "Declston-Point Documents" for highway and Interchange improvements <br />f <br />along US 101 from Cabrillo Boulevard to Padaro Lane. Project elements include <br />reconstruction of two Interchanges with left -lane oft -ramps, replacement of three <br />-I' <br />bridges of FEMA -regulated creeks, retaining wells along the sea cliff; sound <br />r. <br />wells, and pavement rehabiiltation.. <br />8 <br />SR 68 (ROSEDALE HIGHWAY) WIDENING AND IMPROVEMENTS <br />i <br />PROJECT, BAKERSFIELD, GA <br />Principal In charge for final design services for widening approximatoly 5.5 <br />€ <br />miles of SR 581Rosedale Highway from 5R 99 to Allen Road. The project will <br />add one lane in each direction, medlen improvements, and turn lanes at some <br />: 4 <br />Intersections. <br />I.6lKATELLA AVENUE UNDERCROSSiNG; ANAHEIM, CA <br />Principal In charge responsible for development and submittal of project <br />;. <br />approval document, geometric alternatives and final design (with mandatory/ <br />advisory design exception approval), and contract documents. Project includes <br />utility investigation, Identification and coordination with utility owners for facility <br />?: <br />relocation designs and review of traffic analysis, environmental, and water <br />quality documents. <br />j <br />d <br />25E-645 <br />`` <br />