|
�4
<br />LA ON-CALL ENGINEERING SERVICES PROPOSAL
<br />�
<br />RFP NO.:1ras3
<br />City of Santa Anal
<br />ROB HIMEB, PE
<br />R6b hos mord than 31 years of experience In municipal and tranapdrtatlon anlftnooring. He has worked with
<br />municipalities, aganalesand CatbAhsto plan :and design highway, roadway, bddgo, and:ufilliy inftastruchur&
<br />Improvements. Rob 19 a Principal of the firm and speciailYas in ail aspects Of transportation pr1�oj�arts ranging
<br />fitom feaslbillEy, studies to final PS&E, He has a detailed Caltrans ZSC 'Groan
<br />understanding ofthe WDM, HTO
<br />Book% Ortel other applicable design guidelines and criteria. His focus Is on client cervico, ensuring, the deliverer
<br />0
<br />of accurate work that serves our cjierl s.gggls, while working within budget -and targeted schoduta.
<br />€'j
<br />REPRESENTATIVE PROJECTS
<br />fROCT:Oe
<br />tl3t,,;C,PrinpH
<br />AsobdateIn Charge f'dncipal to oharga for this IrrSprovemaitt projaot In, Nawpart Beach. Mark
<br />`f
<br />Thomas is providing engineering,' geometric and frertsportotion design senriods
<br />,
<br />EDUCATION to complete this. this roadway project that will greatly Improve pedestrian safety,
<br />911; In Civil bicycle connedttvittr, and overall vehicular and multimodal operations. Key
<br />Englnesting,: services Include Coltrane approval and pertmltting; paverttent rehabilitation,llnilversity.of
<br />complete-streetslarban design, and bikelpod Improvements.
<br />aliiornla, Berkeley MUL€(PL PAVEMENT RF�iASiLITAT10NS,.FULLERTON, t A
<br />RCdiBlftA7lON Mark Thames Is provides can call clvjl ong(noesrinq _services forthe-Clty:of
<br />f
<br />AC468T : Fuiterion. Senrts tnctwde roadway pavement dssign drainage study; storm
<br />drain arn9 sanitary sewer:ystomo, storm water management praeUees and
<br />other misceilanaT civil engineering and matntenaneswork; The:foilowing task
<br />411
<br />orders rare ourranfly in progresa nr rsoently contpteI I and :are representative of
<br />t
<br />the sample projects to be completed as part of the on-call corbact: Chapman
<br />Avenue, Yorba Linda Boulevard Pavement. Rehemiitation, Commonwealth
<br />,
<br />Avenue Reconstruction Project, Berkeley Avenue pavement Rehabilitation, and
<br />( r
<br />Sunny Crest Drive Reconstruction Project
<br />US 191 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA
<br />`f
<br />Principal to chargelproject manager responsible for overseeing the preliminary
<br />1 ;
<br />design services to evaluate geometries for the $300M, 4.5 -mile HOV widening
<br />t
<br />and pavement rehabilitation projects. "rheprolect Involves the preparation of
<br />c
<br />35% "Declston-Point Documents" for highway and Interchange improvements
<br />f
<br />along US 101 from Cabrillo Boulevard to Padaro Lane. Project elements include
<br />reconstruction of two Interchanges with left -lane oft -ramps, replacement of three
<br />-I'
<br />bridges of FEMA -regulated creeks, retaining wells along the sea cliff; sound
<br />r.
<br />wells, and pavement rehabiiltation..
<br />8
<br />SR 68 (ROSEDALE HIGHWAY) WIDENING AND IMPROVEMENTS
<br />i
<br />PROJECT, BAKERSFIELD, GA
<br />Principal In charge for final design services for widening approximatoly 5.5
<br />€
<br />miles of SR 581Rosedale Highway from 5R 99 to Allen Road. The project will
<br />add one lane in each direction, medlen improvements, and turn lanes at some
<br />: 4
<br />Intersections.
<br />I.6lKATELLA AVENUE UNDERCROSSiNG; ANAHEIM, CA
<br />Principal In charge responsible for development and submittal of project
<br />;.
<br />approval document, geometric alternatives and final design (with mandatory/
<br />advisory design exception approval), and contract documents. Project includes
<br />utility investigation, Identification and coordination with utility owners for facility
<br />?:
<br />relocation designs and review of traffic analysis, environmental, and water
<br />quality documents.
<br />j
<br />d
<br />25E-645
<br />``
<br />
|