Laserfiche WebLink
PROPOSAL ON-CALL ENGINEERING SERVICES w <br />RFP NO.: 17-083 <br />City of Santa Aria <br />RAVI SHAM, PE, QSD/P <br />Ravi has -,Moro than 1:0 years of experience providing project Mahagement.experow in the design of higlwiay <br />and lortal infraspVciure improvements, Mana ing ounterous simut neeua projects,. Wading teams and building <br />consensus are a few of the many strengths avi has developed as a project engineer. Ravi is well versed at <br />managing fast -paced, multi agency/discipline projects. <br />REPRESENTATIVE PROJECTS <br />Pttd.IgCT ROLE <br />CKf Roadway I:edd <br />�DUCATIEiN <br />13S 0'i iChig . <br />Irrgermg, Oai Polys . <br />i -raona <br />ftE�i37`RA1'tCN <br />t:AC7t)1it3 . <br />DRIVE? IMPROVEMENTS PROJECT, NEWPORT BEA H$ <br />Irainagtl deplgn erlgineor for this improvement projectin Newp <br />*k Thomas Is providing enalneefi g. geomatdr- nd1ransgortat <br />and overall vehidular and b ultimodal <br />Ahs approval end pefnififing, pavement <br />design, and bikerped improvements. <br />WARNER AVENUE WIDENING AND <br />Projectenglneerfor the final PSUto w <br />Avenue from Main Street ter Oak Street' <br />from a four fans undivided atieriat #et as <br />the City and County arterials master pia <br />separated. Typo IV bfkatanewhich will a <br />faculties including the Paoliic.Eiactric,Bit <br />development of crosss sedtionaiterriii0t <br />improvements. <br />ROVBMENTS, SANTA ANA, CA <br />overl,800 flnewfeat4of Warner <br />prafeot will convertthe roadway <br />to divided arterial to contornr to <br />a six Fane arterial includes curb <br />to connect two TVoe l bike lane <br />and drainage <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Project engineer responsible for preliminary design services to evaluate <br />geometries for $300M, 4.5-mlfe H(° VV widening and pavement rehabilitation <br />projects. Project dements also include reconstruction of-twq Interchanges with <br />left Layne off -ramps, replacement of three bridges of FEMA-reguiated creeks, <br />retaining waits along the sea olHf, sound wafts, and pavement rehabilitation. <br />SR 68 (ROSEDALE HIGHWAY) WIDENING AND IMPROVEMENTS <br />PROJECT, BAKERSFIELD, CA <br />Project engineer responsible for overseeing the coordination and relocation of <br />Impacted utilities and the design of stage construction plan sheets for widening <br />approximately 5.5 miles of SR 58/Rosedale Highway from SR 99 to Allen Road. <br />The project will add. one lane in each direction, median. Improvements, and tum <br />lanes at certain Intersections. <br />STATE COLLEGE BOULEVA <br />PROJECT, FULLERTON,GA <br />Construction support for the dal <br />preparation of final PS&E for cc <br />and profiles, and hydrology and <br />railroad bridge, special design n <br />modifications, parking lot site Ito <br />coordination, and survey and rk <br />25E-646 <br />RAILROAD GRADE SEPARATION <br />3pment of the grade separation design, <br />suction. drainage design, drainage pians <br />drauik calculations. The project Includes a <br />ining wags, pump station, signal and fighting <br />wements, water and sewer relocations, utility <br />of way support. <br />