Laserfiche WebLink
PROPOSAL <br />ON-CALL ENGINEERING SERVICES <br />RFP NO.: 17-083 <br />City of Santa Ana <br />JARED UNDO <br />Jared has -more than 7 years of experience in municipal and transportation engineering. Over the course of <br />his l3arear at Mark ThorosEs, he has been Involved In the utility elyordlnation and utility rhapping, preparation of <br />trafiio control plans, right of way acquisition, prefect design, striping, and preparation of plans, project reports <br />and estimates for a vartsty.of ptoje'cta for public Agencies f4roughobt California. <br />REPRESENTATIVE PROJECTS <br />RR4400fi`ROLP AR.50(ROSEDALf kilt#HWAY):wlfkSNiNWIMPROVeMENr�. <br />tftAtios t oordinatoPi BAKER$FIELD. CA <br />EDUCATION .. <br />i sidvil <br />9nnggtnW <br />�,Ilfomtatate . . <br />ttnlversity, rrasno <br />Rgtil$i't�tlfltN : . <br />EiT 1$tt9@8 - <br />for project <br />.. i mf..,........ ..�.� ....-. v..., .. -.mss... <br />requiring extensive coordination. <br />The five mile raadway wi <br />crosses twoboundary lutes and Is coordinated with three I <br />Improvements include an ADA corridor, widened roadway, <br />new curb, gutter, and sidewalk. <br />9 S 0 <br />M1 <br />Design, support for tate final P56E to widen Over 1,M0 linear fast of Warner <br />Avenue from Main t to Oak street. The project convorts the roadwa from <br />a four Lane undivided arled01 to'a six-Isne divided arterial to apnfonn to LNy and <br />County arterfais master pian. The arterial. includes curb septafated Type IV bike <br />lane Which wili serve to eohrieot two Type I bike lane facilities. Resporfeibilities <br />Include development of eross.section Aternatives, roadway design, and <br />drainage improvements. <br />t410 UTILITY RELOCATION STUDY, LOSANOELES COUNTY, CA <br />Design engineer reWonsiblefor preparation of a utility relocation study along <br />the central segment of the 1-710 Corridor, between the 1405 Interchange and <br />the Los Angeles River. The project requires extensive coordination with utuay <br />companies and other agencies as utility relooeton would impact underground <br />major gas, oil, saw% communlcation, and watef lines, and the relocation of <br />Southern CalWomia tdison's 220•kv transmission corridor and.66-kv lines. <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Project engineer for this 6300M, 4.5 -Wille HDV widening and pavement <br />rehabilitation project. Project elements Include reconstruction of two <br />Interchanges with left -lana off ramps, pavement rehabilitation, replacement of <br />three bridges of FEMA -regulated creeks, retaining walls along the sea ciHf, and <br />sound walls. <br />BROADWAY STREETSCAPE IMPROVEMENTS, FRESNO, CA <br />Design engineer responsible for plan preparation and daaigi. Project design <br />Includes grading, drainage, utility mapping, and bulb -out design. The purpose <br />of the project was to create a pedestrian friendly corridor, beautification of <br />community and revitalization of downtown. <br />25E-648 <br />i <br />