|
:L ON-CALLENGINEERING SERVICES�
<br />- PROPOSAL
<br />. I
<br />RFP NO.::17.083 7-nQ3
<br />City of Santa Ana'
<br />KEN DOTY, Pc, QSa
<br />Ken has more than 30 years of experience in municipal and transportation engineering with Mark Thomas, He
<br />Is experienced In all aspects of the preparation of PS&E specializing in transportation improvement projects for
<br />public agencies, including Cities, Counties, and Caltrans facilities. He is experienced in the preparation of the
<br />j
<br />hydrology and hydraulic reports, and. has led the design of drainage, storm drain improvements, temporary
<br />drainage and water line during construction, and water and sewer relocations for a variety of projects Including
<br />i
<br />complete streets, roadway rehabilitations, highway8nterchange widenings and Improvements, and grade
<br />t
<br />separations.
<br />REPRESENTATIVE PROJECTS
<br />PROJECT ROLE
<br />Drainage/Hydraulics US 101 NOV & REHABILITATION PROJECTS, SANTA BARBARA, CA
<br />t
<br />Lead Project engineering support for the $300M, 4.&ml1e NOV widening and
<br />pavement rehabilitation projects. Project elements include reconstruction of two
<br />EDUCATION interchanges with left -lane off -ramps, replacement of three bridges of FEMA -
<br />US in Civil regulated creeks, retaining wails along the sea cliff, sound walls, and pavement
<br />,v
<br />Engineering, Oregon rehabilitation.°
<br />j
<br />State University YORBA LINDA BOULEVARD PAVEMENT REHABILITATION PROJECT
<br />REGISTRATION PS&E, FULLERTON, CA
<br />CA 047228 Project manager responsible for preparing geotechnical report and final design
<br />QSD 47228 plans, specification and estimate for the reconstruction of Yorba Linda Boulevard
<br />E
<br />from Placentia Avenue to Bradford Avenue. The project Is approximately 2,60D
<br />feet In length and will include the reconstruction of curb, gutter, sidewalk, cross
<br />gutters and various curb ramps to meet current ADA standards.
<br />NORTH BERKELEY AVENUE PAVEMENT RECONSTRUCTION AND
<br />�` i
<br />REHABILITATION, FULLERTON, CA
<br />Project manager responsible for preparing geotechnical report and final design
<br />plans, specification and estimate for the reconstructlonof North* Berkeley
<br />Avenue between Harbor Boulevard and Valley View Drive. The project is
<br />approximately 1,530 feet in length and will Include the reconstruction of curb,
<br />gutter, sidewalk, cross gutters and various curb ramps to meet current ADA
<br />standards.
<br />,r!
<br />STATE COLLEGE BOULEVARD RAILROAD GRADE SEPARATION
<br />PROJECT, FULLERTON, CA
<br />Project manager responsible for storm drainage, sanitary sewer and water
<br />phases, and construction support services for this grade separation project. The
<br />sanitary sewer plans were split Into the City of Fullerton sewer and the Orange
<br />County Sanitation District sewer lines. The water line belonged to the City of
<br />Fullerton. The project includes a railroad bridge, special design retaining walls,
<br />pump station, signal and lighting modifications, parking lot site improvements,
<br />water and sewer relocations, utility coordination, and survey and right of way
<br />F.
<br />support.
<br />S'
<br />SR 4061SR 606 NOV CONNECTOR, ORANGE COUNTY, CA
<br />Project manager responsible for drainage, quality control, and utilities for this
<br />$102M project to add HOV connectors. Design tasks Include the development of
<br />typical cross sections and design and layout of the temporary drainage systems
<br />for each construction stage, and evaluation of utility protection and relocations,
<br />Project responsibilities also included the detailed review of the soundwall
<br />design for all the project soundwalls, as well as review of the stage construction
<br />Including the development of 100 cross sections.
<br />C
<br />25E-647
<br />
|