|
City ofSantaAna
<br />1.
<br />Tyrone Peter, PE
<br />-j
<br />Project Manager
<br />Profile Summary
<br />Education: BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering
<br />Civil Engineering, Murugappa Polytechnic
<br />R lon: OMI Engineer, California No. 81888
<br />Affiliations: American Public Works Association
<br />American Society of Civil Engineers
<br />Experience. 11 Years
<br />;
<br />Mr. Tyrone Peter is an accomplished civil engineer for multi -discipline and mu€H-agenoy infrastructure pro-
<br />-
<br />jacts and is known for providing Innovative, quality engineering services to ensure project delivery within
<br />a
<br />budget and schedule. As the project manager for the City's On Call Engineering Services project, with quali-
<br />fied staff and resources, he will be responsible for successful project delivery,
<br />11
<br />Mr. Peter's 11 plus years of experience managing and designing all types of public works projects provide a
<br />€
<br />solid foundation to understand what Is needed to deliver a successful project and make flim the perfect fit
<br />for overseeing the entire project as well as specific civil onginsering tasks His comprehensive experience
<br />includes design of state highway, new street, street widening, street realignment, pavement rehabilitation,
<br />T
<br />light rail and railroad, grade separation, flood control facility, water, and sewer projects. Mr. Peter has super-
<br />vised feasibility study, project study report, project report, construction document preparation as well as
<br />i..
<br />grade certification Issuance, construction administration, and construction inspection.
<br />,
<br />Relevant Project Experience
<br />f }
<br />Emerald Say Main Gate Safety improvements, Emerald Bay Service District, Laguna Beach, Cailfor-
<br />J
<br />"go. 41va CSllunmul lllu 1,7. $j' R I.wuuul I S: pullgolula lul Vvololul It Ul mu ,,l Vii ia11IPQ1111a a6, vl4w , 4u 1N ,d1 @r.IGI II IIJ
<br />necessary reports, plans, specifications, and estimates documentation. Performance of these responsibill-
<br />ties required expertise and knowledge In street, traffic, drainage, structural, and pavement design, ADA
<br />-j
<br />standards, public outreach, pedestrian safety, and water quality. W11Idan provided civic and traffic engineer -
<br />Ing design and other appurtenant services for safety improvements at the main gate entrance. Improve-
<br />ments involved road widening, guardhouse relocation and reconstruction; grading to accommodate the
<br />roadway widening and landscaping; installing upgraded lighting, ADA -compliant curbs and ramps, and to-
<br />talning and monument wails; widening the right -turn pocket and installing a median; and installing street
<br />striping and signage within Caltrans' right-of-way.
<br />Firestone Boulevard Capacity Enhancement, City of South Hate, California. Project Manager responsi-
<br />ble for overall project management and oversight required for the corridor improvements from Alameda
<br />Street to Hunt Avenue. Performance of these responsibilities required expertise and knowledge In street
<br />a
<br />and pavement design, ADA standards, public outreach, environmental documentation, green Sheet design,
<br />and watershed management planning. The improvements involved increasing traffic capacity by reconflgur-
<br />11
<br />ing the roadway from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median
<br />a
<br />lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA-compilant ramps; parkway
<br />trees; artistic elements, corridor entrance monument; bus shelter and bus WITIOL ts; and traffic signal modifi-
<br />cations, Services provided Included civil, traffic, pavement, and drainage engineering; landscape architec-
<br />ture, survey and right-of-way engineering; and utility relocation.
<br />orange Line Extension, 9rutoco Engineering & Construction, IncdLos Angeles County Metropolitan
<br />Transportation Authority, Los Angeles, California. Civil Engineering Task Leader responsible for provld-
<br />,
<br />€ng and overseeing all civil improvement design required for the design/build of the MOL extension from the
<br />Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Performance of
<br />c
<br />these responsibilities required expertise and knowledge In intersection design, bike lanes, ADA standards,
<br />street geometric design, light-rail standards, parking lot and roadside safety design. Wilidan prepared plans,
<br />specifications, and estimate for street widening, raised landscaped medians, irrigation system, ADA access
<br />curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communica-
<br />r
<br />tion conduits, and signing and striping. Three stations were constructed or reconstructed.
<br />`
<br />Proposal for On-Caq Engineering,
<br />Cntnprehenslve. innovative. Trusted. RrPNo. 17-083
<br />w
<br />25E-670
<br />
|