Laserfiche WebLink
Ci of Same Ane <br />Los Alamftos Boulevard Median Improvements, City of Loa Alamitos, Calmornia. Project Manager to- <br />sporsible for overall project management and oversight required for the improvements between Cerritos <br />Avenue and Katella Avenue. Performance of these responsibilities required expertise and knowledge In <br />street Improvement, pavement rehabilitation, public outreach, signing and striping, street lights, and planting <br />and Irrigation. Improvements Involved raised median, pavement delineation, landscape and irrigation Im- <br />provements, street lighting and traffic signal Improvements at Intersections with <br />Flodsta Street and Sausalito Street. There was minor traffic signal modification at Intersections with Kateiis <br />Avenue and Cerritos Avenue. <br />Placentia Metrolink ;`Station Phase I and Il, Orange County Transportation Authority, Orange County, <br />California. Project Manager responsible for providing and overseeing all civil Improvement design required <br />for infrastructure Improvements for the new station. The project alis Involved approximately 4.75 acres to <br />+ provide a MetroLink commuter rail station that meats current and future transit demand and ADA require- <br />ments. The project goal fostered train ridership growth In the region. The station was planned as part of a <br />key component of transit orientsd development envisioned in the Westgate Specific Plan for the City of Pla- <br />centia. The project improvements included street, railroad track, and pedestrian improvements; rail plat- <br />forms; and lighting, signing and striping of four parking facilities for 425 vehicles. <br />IGowns Street Widening, City of Ridgeorest, California. Civil Engineering Task Leader responsible for <br />providing and overseeing all civil Improvement design required for the widening improvements. Perfor- <br />mance of these responsibilities required expertise and knowledge In alternative pavement design, bens- <br />fiUcost analysls, right-of-way engineering, street design, and utility coordination. The project includes envf- <br />ronnrentai compliance, right-of-way research, and design. The project limits are Upjohn Avenue and Ridge - <br />crest Boulevard. Improvements include street widening and now curb, gutter, curb ramps, and sidewalks. <br />The preliminary engineering services Include utility research, right-of-way research, field Investigations, soils <br />testing, and ground survey. <br />Street Improvements Phase 11, City of Las Alamitos, California. Project Manager responsible for overall <br />project management and oversight required for resurfacing of the following projects In the Phase 11 oily -wads <br />program: <br />- Via BI Mercado Street improvements <br />- Old Town West Improvements (Chestnut Street, Walnut Street, Fiorista Street) <br />- <br />Commercial Street Improvements (Cerritos Avenue, Ball Road, Reagan Street, Humboldt Street, Portal <br />Drive, Winners Circle, Los Alamitos Boulevard, Los Vaqueros Cirole) <br />r. <br />Performance of these responsibilities required expertise and knowledge in pavement rehabliltaflon strate- <br />gies, ADA standards, and signing and striping. Wiildan conducted site reconnaissance to observe the pave- <br />mont condition, conducted coring, testing and engineering analysis and summarized the findings in a ge- <br />tt otechnlcal report Per the recommendation, the City streets within the project limits were ground and resur- <br />faced with 2 -Inch thick asphalt -rubber hot mix or removed and replaced with asphalt concrete over aggre- <br />gate base or with joint plain cement concrete. All manhole, water valve, anode, and monitoring well covers <br />within the project limits were adjusted to grade. Curbs and driveways were protected In place, Sidewalks <br />were improved and ramps were improved to current ADA requirements. <br />' Comprehensive. Innovative. Trusted. <br />25E-671 <br />Proposal for On -Call Engineering, <br />RFP No, 17-083 <br />