|
Ci of Same Ane
<br />Los Alamftos Boulevard Median Improvements, City of Loa Alamitos, Calmornia. Project Manager to-
<br />sporsible for overall project management and oversight required for the improvements between Cerritos
<br />Avenue and Katella Avenue. Performance of these responsibilities required expertise and knowledge In
<br />street Improvement, pavement rehabilitation, public outreach, signing and striping, street lights, and planting
<br />and Irrigation. Improvements Involved raised median, pavement delineation, landscape and irrigation Im-
<br />provements, street lighting and traffic signal Improvements at Intersections with
<br />Flodsta Street and Sausalito Street. There was minor traffic signal modification at Intersections with Kateiis
<br />Avenue and Cerritos Avenue.
<br />Placentia Metrolink ;`Station Phase I and Il, Orange County Transportation Authority, Orange County,
<br />California. Project Manager responsible for providing and overseeing all civil Improvement design required
<br />for infrastructure Improvements for the new station. The project alis Involved approximately 4.75 acres to
<br />+ provide a MetroLink commuter rail station that meats current and future transit demand and ADA require-
<br />ments. The project goal fostered train ridership growth In the region. The station was planned as part of a
<br />key component of transit orientsd development envisioned in the Westgate Specific Plan for the City of Pla-
<br />centia. The project improvements included street, railroad track, and pedestrian improvements; rail plat-
<br />forms; and lighting, signing and striping of four parking facilities for 425 vehicles.
<br />IGowns Street Widening, City of Ridgeorest, California. Civil Engineering Task Leader responsible for
<br />providing and overseeing all civil Improvement design required for the widening improvements. Perfor-
<br />mance of these responsibilities required expertise and knowledge In alternative pavement design, bens-
<br />fiUcost analysls, right-of-way engineering, street design, and utility coordination. The project includes envf-
<br />ronnrentai compliance, right-of-way research, and design. The project limits are Upjohn Avenue and Ridge -
<br />crest Boulevard. Improvements include street widening and now curb, gutter, curb ramps, and sidewalks.
<br />The preliminary engineering services Include utility research, right-of-way research, field Investigations, soils
<br />testing, and ground survey.
<br />Street Improvements Phase 11, City of Las Alamitos, California. Project Manager responsible for overall
<br />project management and oversight required for resurfacing of the following projects In the Phase 11 oily -wads
<br />program:
<br />- Via BI Mercado Street improvements
<br />- Old Town West Improvements (Chestnut Street, Walnut Street, Fiorista Street)
<br />-
<br />Commercial Street Improvements (Cerritos Avenue, Ball Road, Reagan Street, Humboldt Street, Portal
<br />Drive, Winners Circle, Los Alamitos Boulevard, Los Vaqueros Cirole)
<br />r.
<br />Performance of these responsibilities required expertise and knowledge in pavement rehabliltaflon strate-
<br />gies, ADA standards, and signing and striping. Wiildan conducted site reconnaissance to observe the pave-
<br />mont condition, conducted coring, testing and engineering analysis and summarized the findings in a ge-
<br />tt otechnlcal report Per the recommendation, the City streets within the project limits were ground and resur-
<br />faced with 2 -Inch thick asphalt -rubber hot mix or removed and replaced with asphalt concrete over aggre-
<br />gate base or with joint plain cement concrete. All manhole, water valve, anode, and monitoring well covers
<br />within the project limits were adjusted to grade. Curbs and driveways were protected In place, Sidewalks
<br />were improved and ramps were improved to current ADA requirements.
<br />' Comprehensive. Innovative. Trusted.
<br />25E-671
<br />Proposal for On -Call Engineering,
<br />RFP No, 17-083
<br />
|