<br />• Field exploration including coring, drilling, and sampling at three locations to the maximum drilled depth of 10
<br />feet below ground surface within the limits of the project site. Upon receipt of notice to proceed, a site visit
<br />will be performed to mark the cora/boring locations and evaluate access conditions for drilling equipment.
<br />Willdan will call USA for underground utility locating at least 4B hours before any field work is performed.
<br />However, all available subsurface utility Information should be provided/ Identified prior to Initiating field ex-
<br />ploration to reduce the potential for damaging existing utilities, Traffic control will be provided during drilling.
<br />• Borings/ooree will be measured and visually logged In the field by an experienced representative. The log will
<br />Include pavement sections thicknesses and subgrade conditions. The samples will be transported to Wilk
<br />dan°e geotechn€call laboratory for testing.
<br />' Laboratory testing of collected representative subgrade soils will determine their index and engineering prop-
<br />erties.
<br />■ Option A: Geotechnical Investigation will be used to Identify the soil properties for the trenching and backfill of
<br />proposed utilities.
<br />■ Option B: Providing recommendations for alternative new pavement sections.
<br />• Option B: Performing a percolation test within a boring
<br />drilled to a depth between 5 and 10 feet for BMP and green ®Subtask 4.03 Deliverables
<br />streets implementation Of needed). • Three hard copies of draft geotechnical
<br />• Providing a draft report and presenting our findings, conclu- report and one electronic PDF copy
<br />j stone, and recommendations for review by the City. After ' Three hard copies of final geotechnioa€
<br />i receiving the Clty's comments, a final report Incorporating report and one electronic PDF copy
<br />the comments will be provided to the City. The report will be supported with a map Illustrating boring/core lo-
<br />cations and a summary of laboratory test results.
<br />Subtask 4,04 - Preliminary Design Report Wilidan will complis a Preliminary Design Report (PDR) for
<br />review and approval by the City. The report will contain a summary of Subtask 4,04 Detiverables
<br />the Initial reconnaissance notes, utility provided information, field survey Preliminary Design Report
<br />findings, any photographs of conditions for discussion, and the base de-
<br />sign concept with preliminary construction cost estimate. The report will be discussed with City representa-
<br />tives to make reliable, cost effective decisions about the proposed street improvements, water and sewer re-
<br />habliitationtreplacoment methods.
<br />During preparation of the PDR. Willdan will review existing Information, such as the pavement management
<br />report, city sewer and water documents and field review of the street to make recommendations regarding
<br />the construction needs, Including the location and extend of missing or damaged sidewalk, curbs and gutter,
<br />access ratnpsrdriveways, sewer and water repairs. In addition, the report will address the disposition of
<br />existing utilities and coordination, and anticipated requirements.
<br />Task 5 -• Plans, Specification, and Engineer's Estimate - Option A and Option
<br />Subtask 5.01- Construction Plans.
<br />! Wllkfan will prepare conceptual pians for City review, corn- 2 Task 5.01 Deliverables
<br />ment and approval, Upon approval of the concept plans, a Three hard copies of full-size conceptual plan
<br />the final design phase will be Initiated. Willdan will submit layout and one electronic PDF format
<br />plans at the 30-, 60-, and 100 -percent levels of oomple- • Three hard copies of full-size and half-size plan
<br />I tion. The City will provide review comments at all design submittals at 30-, 80-, and 100 -percent comple.
<br />stages. Willdan will address comments received from the tion milestones, one electronic PDF copy, and
<br />submittal reviews, including comments received from one electronic Microstatlon copy in VBI format.
<br />other affected agencies and utilities. Willdan will submit one, original, signed set of full-sized plans, a signed, un-
<br />bound, set of final specifications, and a copy of the final ongineer's opinion of construction cost to the City. One
<br />set of Mylars will be produced after 100% plans are approved by the City (upon request). Plans will conform to
<br />City standard plans and CADD standards and be prepared utilizing Mic'rostatlon V81 software.
<br />Option A: The plans be prepared in sufficient detail to bid the rehabilitation of the Identified well -- method to be
<br />determined by the City after review of the assessment report - and the proposed sewer and water facilities. Util-
<br />Ity plans will be drafted at 40 -scale and plans will display all referenced standard pians Including trenching do -
<br />tails.
<br />Option B: The plans will consist of a Title Sheat(Typical notes, Roadway Plans, Construction Details, Sliming
<br />and Striping, Landscape, and Storm Water Biofiltration (if required in complete streets). The Roadway Plans will