City of Santa Ana <br />'.I <br />• Field exploration including coring, drilling, and sampling at three locations to the maximum drilled depth of 10 <br />feet below ground surface within the limits of the project site. Upon receipt of notice to proceed, a site visit <br />will be performed to mark the cora/boring locations and evaluate access conditions for drilling equipment. <br />Willdan will call USA for underground utility locating at least 4B hours before any field work is performed. <br />However, all available subsurface utility Information should be provided/ Identified prior to Initiating field ex- <br />ploration to reduce the potential for damaging existing utilities, Traffic control will be provided during drilling. <br />• Borings/ooree will be measured and visually logged In the field by an experienced representative. The log will <br />Include pavement sections thicknesses and subgrade conditions. The samples will be transported to Wilk <br />dan°e geotechn€call laboratory for testing. <br />' Laboratory testing of collected representative subgrade soils will determine their index and engineering prop- <br />erties. <br />■ Option A: Geotechnical Investigation will be used to Identify the soil properties for the trenching and backfill of <br />proposed utilities. <br />■ Option B: Providing recommendations for alternative new pavement sections. <br />• Option B: Performing a percolation test within a boring <br />drilled to a depth between 5 and 10 feet for BMP and green ®Subtask 4.03 Deliverables <br />streets implementation Of needed). • Three hard copies of draft geotechnical <br />• Providing a draft report and presenting our findings, conclu- report and one electronic PDF copy <br />j stone, and recommendations for review by the City. After ' Three hard copies of final geotechnioa€ <br />i receiving the Clty's comments, a final report Incorporating report and one electronic PDF copy <br />the comments will be provided to the City. The report will be supported with a map Illustrating boring/core lo- <br />cations and a summary of laboratory test results. <br />Subtask 4,04 - Preliminary Design Report Wilidan will complis a Preliminary Design Report (PDR) for <br />review and approval by the City. The report will contain a summary of Subtask 4,04 Detiverables <br />the Initial reconnaissance notes, utility provided information, field survey Preliminary Design Report <br />findings, any photographs of conditions for discussion, and the base de- <br />sign concept with preliminary construction cost estimate. The report will be discussed with City representa- <br />tives to make reliable, cost effective decisions about the proposed street improvements, water and sewer re- <br />habliitationtreplacoment methods. <br />During preparation of the PDR. Willdan will review existing Information, such as the pavement management <br />report, city sewer and water documents and field review of the street to make recommendations regarding <br />the construction needs, Including the location and extend of missing or damaged sidewalk, curbs and gutter, <br />access ratnpsrdriveways, sewer and water repairs. In addition, the report will address the disposition of <br />existing utilities and coordination, and anticipated requirements. <br />Task 5 -• Plans, Specification, and Engineer's Estimate - Option A and Option <br />Subtask 5.01- Construction Plans. <br />! Wllkfan will prepare conceptual pians for City review, corn- 2 Task 5.01 Deliverables <br />ment and approval, Upon approval of the concept plans, a Three hard copies of full-size conceptual plan <br />the final design phase will be Initiated. Willdan will submit layout and one electronic PDF format <br />plans at the 30-, 60-, and 100 -percent levels of oomple- • Three hard copies of full-size and half-size plan <br />I tion. The City will provide review comments at all design submittals at 30-, 80-, and 100 -percent comple. <br />stages. Willdan will address comments received from the tion milestones, one electronic PDF copy, and <br />submittal reviews, including comments received from one electronic Microstatlon copy in VBI format. <br />other affected agencies and utilities. Willdan will submit one, original, signed set of full-sized plans, a signed, un- <br />bound, set of final specifications, and a copy of the final ongineer's opinion of construction cost to the City. One <br />set of Mylars will be produced after 100% plans are approved by the City (upon request). Plans will conform to <br />City standard plans and CADD standards and be prepared utilizing Mic'rostatlon V81 software. <br />Option A: The plans be prepared in sufficient detail to bid the rehabilitation of the Identified well -- method to be <br />determined by the City after review of the assessment report - and the proposed sewer and water facilities. Util- <br />Ity plans will be drafted at 40 -scale and plans will display all referenced standard pians Including trenching do - <br />tails. <br />Option B: The plans will consist of a Title Sheat(Typical notes, Roadway Plans, Construction Details, Sliming <br />and Striping, Landscape, and Storm Water Biofiltration (if required in complete streets). The Roadway Plans will <br />comprehensive. Innovative.11usted. Proposolfor On�GailBnfineering, <br />RFP Na V -M <br />25E-685 <br />23 <br />