My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maine Avenue Complete Streets, Baldwin Park, CA <br />Year completed: 2015 <br />Client name: City of Baldwin Pari; <br />Contact person and phone number: <br />David Lopez; (625) 960.4011 x456 <br />Team members: S. Weinmeier (Civil Engineering Lead), V. <br />Pampers (Design Engineer), S. Cook (Landscape Architect), <br />R, Miller (Project Pdnotpal and Traffic Engineer) <br />Relevancy: Provided support from feasibility analysis through <br />final design, Complete Streets focus, comprehensive A-E <br />services <br />The City of Baldwin Park has established an aggressive <br />Complete Streets program for the community, including <br />goats to increase walking and bicycling. Maine Avenue <br />is a potentially underutilized corridor that Is being <br />transformed into a quality multimodal corridor, improving <br />access to the City's downtown and Metrolink station. <br />We analyzed multimodal transportation needs for the <br />corridor, including a first phase that has been funded <br />through the State/Federal Safe Routes to School <br />(SRTS) program. The analysis included feasibility <br />for a mad diet to provide space to address sidewalk <br />ADA deficiencies and bicycle lanes, Roundabouts and <br />curb extensions are being featured prominently in the <br />completed plan. <br />We have recently completed the final design phase, <br />funded through the ATP program, We also led public <br />outreach and grant administration. <br />CV Link, Coachella Valley, CA <br />Year completed: Ongoing <br />Client name: Coachella Valley Association of Governments <br />Contact person and phone number: <br />LeGrand Velez; (760) 346-1127 <br />Team members: S. Weinmeier (Engineering Projeet Manager), <br />D. Villines (Drainagelhlydrology), V. Pampara (Project Engineer), <br />S. Heid (Project Engineer) <br />Relevancy: Complete Streets focus. comprehensive A-E <br />services, state-of-the-art multimodal trail <br />Connecting Coachella Valley cities and tribal lands with <br />a safe, continuous, multimodal trails for pedestrians, <br />bicyclists, and low -speed electric vehicles. <br />CV Link's design will change the landscape of the <br />Coachella Valley with features and fomes unprecedented <br />in trail design. The CV Link Master Plan calls for 52 trail <br />milas, 690 permanent jobs, 112 million annual vehicle miles <br />saved, and $1,47 billion in economic benefits for the area. <br />The results will Include relieved congestion on Highway <br />111, improved air quality, increased tourist amenities <br />and mobility, community recreation and fitness, and a <br />stimulated economy. <br />The Stantee team, led by Sherry Weimeler, provided <br />civil and traffic studies and design improvements for this <br />world-class network of shared trails that links communities <br />from Palm Springs to Coachella. Our scope included flood <br />studies and the civil design improvement plans for the <br />alignment within the public road right of way, including <br />traffic signals, ADA Improvements, and Intersection <br />controls. <br />25E-773 <br />R <br />
The URL can be used to link to this page
Your browser does not support the video tag.