Laserfiche WebLink
Redondo Beach Cycle Track, Redondo, CA <br />Year completed: 2016 <br />Client name: Cily of Redondo Beach <br />Contact person and phone number: <br />Maureen Lull; (310) 3.18.066tx4525 <br />Team members: R. Miller (Project Principal and Traffic <br />Engineer), S. Wainmeler (Civil Engineering goad), <br />S. Reid (Design Lead), V. Pampara (Design Engineer), <br />S. Cook (Landscape Amhitoct) <br />Ralovancy: Comprehensive A-E services, preliminary and <br />final PS&Es, innovative bNeway network <br />Designing a link from the Hermosa Beach "Strand" to <br />Redondo Beach's Marina District complex improved <br />accessibddyfor bicyclists and pedestrians and provided <br />aesthetic and safety enhancements. Pur full l0cuse <br />services Included civil angineedrtg and topographic <br />surreys, traffic engineering and planning, and landscape <br />architecture. <br />We prepared final plans for the roadway rehabilitation <br />that featured a new separated bikaway (cycle track) and <br />a now Welcome park on lands that were formerly used <br />as a parking lot. We also prepared concept drawings, <br />Performed traffic analysis, road dot simulation, and field <br />surveys, We also provided conceptual visualization, <br />cycle track design, and pavement rehabilitation, <br />We advocated for and ultimately designed a Welcome <br />Pads, replacing the existing wall that encumbered the <br />bicycle link between Hermosa Beach and Redondo <br />Beach. The new Welcome Park affected the existing <br />parking capaelty—something we had considered in our <br />overall design, To maintain or exceed the current level of <br />parking In the coastal area, coupled with the typical large <br />harbor vehicles, the Improvements were designed within <br />strict geometric constraints, We Implemented a cycle <br />track, as well as Increased the number of parking stalls <br />by providing revers"rigle parking to allow drivers better <br />visibility to the approaching cyclist, <br />Anaheim Resort District Plan update, Anaheim, CA <br />Year completed; Ngoing <br />Clientnams: Cilyof Anaheim <br />Contact person and phone number: <br />HkaAfkimmo; (714) 981.6855 <br />Team members: S. Cook (project Manager) <br />Rolevanoy: Skeefsrips improvements in highly -visible <br />destination, support from visioning through construction, <br />Implementing unique <br />We are Helping the City, of Anaheim, Disneyland, <br />restaurateurs, holders, and other Resod District <br />stakeholders bring their streetssaps and frontages from <br />tate existing garden theme to a more relevant urban <br />theme. Weare belong Orate a feeling of uniqueness to <br />not only encourage visitors to visit; but then to remain in <br />the District longer to enjoy the districts offerings. <br />Our team of diverse disciplines played a key role <br />throughout the process --from visioning to construction. <br />One of the fires phases includes updating the four major <br />entries to the Resort Dtstdct, which Involves unique LED <br />color changing lighting on the palm trees and Inside the <br />monuments, sidewalk, and other paving updates, street <br />furnishing, and sofiscape. <br />25E-772 <br />