My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sherry Weinmewer . <br />PE, ENV SP, LEED AP $D+C <br />Project Manager <br />Education <br />• BS, Civil Engineering <br />ReglstrationstGertificatiens <br />• ProfasdonaiEngineer#41751,CA <br />* Envision'"' Sustainability Profassicnai (ENV <br />SP), Institute for Sustainable Infrastructure <br />• <br />LEED AP Building DodIin + Construction, <br />U.S. Crean Building Council <br />i <br />Why select <br />• Proven PM -100s of sucoessfuliy delivered <br />projects, including 12+ task ordert ford <br />on-call contracts in the past 5 years <br />Expansive concepHevel through <br />PS&E experience <br />• Successful Wei agency project experience, <br />including with the CRY <br />• Proven record of quality and delivery <br />`Denotes projects eampfated with other firms <br />Sherry Is a proven and highly respected leader in the A-E industry, <br />having delivered civil engineering and design services forpuldio <br />agency clients throughout Southern California for more than 30 years, <br />SherPIS extensive expertise Includes concept level infrastructure <br />design through final design services for large-scale master <br />planned communities, a wile range of food pubilo works facilities, <br />and awardavtnning multimodal transportalion facilities, including <br />the recently completed Redondo Beach Cycle Track. Slurry's <br />outstanding commitment to collaboration and communication, strong <br />understanding of details, and dedication to owners' goals has resulted <br />in her projects regularly being delivered on schedule and vd to <br />budget. <br />Santa Ann Cycle Track, Santa Arta, CA (Project Manager) <br />Sherry managed the preliminary design and precise goometrics for <br />this 2.4 -mile separated bikeway In the City. She managed concept <br />refinaments and precise alignment studies for the protected bike <br />tortes utilizing raised medians, landscape improvements, bulkuts at <br />designated Intersections, and traffic signal modifications, The desl�n <br />will complete a one-way cycle track in each direction along Santa <br />Ana Boulevard, 5th Sheet, and 6th Streetoonnecting the Santa Ana <br />Regional Transportation Center to the downtown civic center area, <br />The total project length is approximately 2 miles of one-way cycle <br />track and 0.4 miles of two-way cycle track, <br />CV Link, Coachella Valley, CA (Engineering Project Manager) <br />Sherry is providing design oversight and project management services <br />for the chili and traffic engineering final PS&E design services for <br />the on-atreat segments of GV Link. CV Link is a %mile shared use <br />protected path connecting the Coachella Valley communities from <br />Palm Springs to Coachella. We are wodcing closely with the client and <br />desert communities to design this world-class facility. CV Link Is a <br />$100 million project with nearly ail funding in place. <br />Redondo Beach Cycle Track, Redondo Beach, CA (Civil Lead) <br />Sherry was the civil lead for providing full A-E services—from concept <br />through final PSM.—for proposed bloycle•fdandly facilities along two <br />roadways. She led preparation of concept drawings and final plans <br />for the favored alternative, which includes a Class I separated cycle <br />track and City Welcome Park while Increasing parking capacity within <br />the coastal zone. The project included traffic analysis and simulation <br />of the road diet and roundabout, conceptual visualization, field <br />survey and serial topography, civil design of the cycle track, drainage <br />facilities, landscape and site furnishings, and related signing and <br />striping plans. <br />25E-794 <br />
The URL can be used to link to this page
Your browser does not support the video tag.