Laserfiche WebLink
Maine Avanue Complete Streets, Baldwin Park, CA <br />(Roadway Task Lead) <br />Sherry delivered NINE design services for the final PM <br />along MalneAvenue to enhance trafilo calving and sheat <br />beautification along this 1 -mile corridor and roundabout. <br />Design services Included upgrades to existing ADA curb <br />ramps, commemtal and residential driveways forADA <br />compliance, bulb -outs, and roundabout design, This project <br />included a road diet, which modified the fcur-lane roadway <br />to provide a three -lane roadway, one through lane in each <br />diranOon and a continuous median or center left -tum law <br />throughout, while improving pedestrian and bicycle safety. <br />Heritage Park Parking tot Improvements, Irvine, CA <br />(Project Manager) <br />Sherry managed a fast-track design improvement to a <br />4 -sane parking lot originally constructed In 1970. Our design <br />Improves circulation, FOR construction methods, capacity, <br />safety, water quality, and aesthetics. Careful concept <br />element oonsideration Included Improved circulation and <br />ADA facilities, increased capacity, visually glassing design, <br />sustainable features, end safety. Sherry prepared PS&E and <br />construction documents and helped obtain approval from <br />various City departments. <br />Hazard Avenue Corridor Blkeway Improvement Project, <br />Orange County, CA (Project Manager) <br />Sherry oversaw an alternatives analysis and provided design <br />support for an 8 -mile bikeway through four Cities in Orange <br />County The bikeway consists of off-street segments along <br />former rail right -of way, Class IV (Cycle Track) segments <br />on a section of roadway that will be reduced from a four <br />lane arterial to two-lane collector with center tum lane (road <br />diet), and bicycle boulevard segments through residential <br />neighborhoods. A comprehensive traffic impact anstysts <br />was prepared for the project Report and design ooncepis <br />developed for the on -mad segments. A special study to <br />support an amendment of the County's Master Plan of <br />Arterial Highways was prepared for the road diet sagmams. <br />OC Great Park Sports Park, Irvine, CA (Project Manager) <br />Sherry managed final engineering design services fortbe <br />sport park's development and design, which includes 176 <br />acres of recreational sports and fully compliant accessible <br />site access. We designed precise grading, drainage, sewer <br />and water, and traffic facilities. We are currently providing <br />oonstuotion support services through compleflon. <br />Burbank Channel Bikeway Project, Burbank, CA <br />(Project Manager) <br />Sherry managed our full A-E and environmental services, <br />Including final PS&Es to complete an Important bikeway <br />link through design of a Class I bikeway and mulfi-uso tra'i <br />along the Burbank Channel, We have provided graphics and <br />presentations at council meetings, met with the community <br />In open gatherings arid one-on-one with the City, and <br />helped develop a community survey to gather input from at <br />Interested members, Our concept and final designs looked <br />closely at each of their concerns and provided detailed cost <br />estimates ofthe,proposed project allumetIves. <br />Camino del Rio Roundabouts, San Clemente, CA <br />(QAIQC PS&E) <br />Sherry oversaw the design of two large roundaboaha and <br />street design. Our roundabout solution proved to be wall - <br />received in addressing future traffic volume, speeding, <br />and safety issues. We provided full A-E end final PS&E <br />design services, including drought tolerant landscaping that <br />Improved circulation for pedestrians and bicydiste, <br />San Diego Creek Channel Bike Trail Relocation, <br />Irvine, CA(Project Manager). <br />Sherry provided engineering services, Including final PS&Es <br />for rastorl%a 1.2-mle segment of the Son Diego Creek <br />Channel. Paved bloycle and hiking trails borderthe channal. <br />Her scope Included improvements to relocate the bike hell <br />stAlton Parkway along the Canon USA property within <br />the channel right of way. Channel structural Improvements <br />were designed to replace eroded and damaged areas <br />of the channel including rip rep structures, grade control <br />structures, and eroded soil cent ramps and slopes. <br />The relocation includes grading, asphalt paving, fencing, <br />ADA improvements, s1gnage, striping Improvements, and <br />minor landscaping. Sherry prepared a detailed right-of-way <br />mapping base to define the existing right of way and any <br />now easements early In the design so the City coact secure <br />timely right-of-way acquisition, <br />CuhredUniversltya Intersection Improvement, Irvine, CA <br />(Project Manager) <br />Sherry managed engineering, environmental, and <br />architecture! design services. She oversaw PS&E . <br />preparation and the design of roadway, grading, structures, <br />storm drain, landscape, and utility construction documents <br />to improve level of service at this busy Intersection in <br />conformance to Complete Streets goals. The project, <br />scheduled for construction hnmmer of 2018, provides an <br />add! ioral through 'au <br />h lane along Culver Drive in each direction <br />and right -tum lanes to Improve traffic flows. <br />Campus DdvetBristol Streetintersection Improvement, <br />Orange County, CA (Project Manager) <br />The project widened southbound Campus Drive to provide <br />an additional 600 -foot -long, third right tum lane onto <br />northbound Bristol Street The work included the partial <br />demolition and reconstruction of an existing maintenance <br />building, reconstruction of existing traffic factikles, Installation <br />of a new overhead sign, utility relocations, minor grading <br />and re vegetation We provided traffic, civil, geotechnical, <br />architecture, and landscape architecture servloas. <br />*Denotes pmJects completed with otherlhms <br />25E-795 <br />F <br />