|
Maine Avanue Complete Streets, Baldwin Park, CA
<br />(Roadway Task Lead)
<br />Sherry delivered NINE design services for the final PM
<br />along MalneAvenue to enhance trafilo calving and sheat
<br />beautification along this 1 -mile corridor and roundabout.
<br />Design services Included upgrades to existing ADA curb
<br />ramps, commemtal and residential driveways forADA
<br />compliance, bulb -outs, and roundabout design, This project
<br />included a road diet, which modified the fcur-lane roadway
<br />to provide a three -lane roadway, one through lane in each
<br />diranOon and a continuous median or center left -tum law
<br />throughout, while improving pedestrian and bicycle safety.
<br />Heritage Park Parking tot Improvements, Irvine, CA
<br />(Project Manager)
<br />Sherry managed a fast-track design improvement to a
<br />4 -sane parking lot originally constructed In 1970. Our design
<br />Improves circulation, FOR construction methods, capacity,
<br />safety, water quality, and aesthetics. Careful concept
<br />element oonsideration Included Improved circulation and
<br />ADA facilities, increased capacity, visually glassing design,
<br />sustainable features, end safety. Sherry prepared PS&E and
<br />construction documents and helped obtain approval from
<br />various City departments.
<br />Hazard Avenue Corridor Blkeway Improvement Project,
<br />Orange County, CA (Project Manager)
<br />Sherry oversaw an alternatives analysis and provided design
<br />support for an 8 -mile bikeway through four Cities in Orange
<br />County The bikeway consists of off-street segments along
<br />former rail right -of way, Class IV (Cycle Track) segments
<br />on a section of roadway that will be reduced from a four
<br />lane arterial to two-lane collector with center tum lane (road
<br />diet), and bicycle boulevard segments through residential
<br />neighborhoods. A comprehensive traffic impact anstysts
<br />was prepared for the project Report and design ooncepis
<br />developed for the on -mad segments. A special study to
<br />support an amendment of the County's Master Plan of
<br />Arterial Highways was prepared for the road diet sagmams.
<br />OC Great Park Sports Park, Irvine, CA (Project Manager)
<br />Sherry managed final engineering design services fortbe
<br />sport park's development and design, which includes 176
<br />acres of recreational sports and fully compliant accessible
<br />site access. We designed precise grading, drainage, sewer
<br />and water, and traffic facilities. We are currently providing
<br />oonstuotion support services through compleflon.
<br />Burbank Channel Bikeway Project, Burbank, CA
<br />(Project Manager)
<br />Sherry managed our full A-E and environmental services,
<br />Including final PS&Es to complete an Important bikeway
<br />link through design of a Class I bikeway and mulfi-uso tra'i
<br />along the Burbank Channel, We have provided graphics and
<br />presentations at council meetings, met with the community
<br />In open gatherings arid one-on-one with the City, and
<br />helped develop a community survey to gather input from at
<br />Interested members, Our concept and final designs looked
<br />closely at each of their concerns and provided detailed cost
<br />estimates ofthe,proposed project allumetIves.
<br />Camino del Rio Roundabouts, San Clemente, CA
<br />(QAIQC PS&E)
<br />Sherry oversaw the design of two large roundaboaha and
<br />street design. Our roundabout solution proved to be wall -
<br />received in addressing future traffic volume, speeding,
<br />and safety issues. We provided full A-E end final PS&E
<br />design services, including drought tolerant landscaping that
<br />Improved circulation for pedestrians and bicydiste,
<br />San Diego Creek Channel Bike Trail Relocation,
<br />Irvine, CA(Project Manager).
<br />Sherry provided engineering services, Including final PS&Es
<br />for rastorl%a 1.2-mle segment of the Son Diego Creek
<br />Channel. Paved bloycle and hiking trails borderthe channal.
<br />Her scope Included improvements to relocate the bike hell
<br />stAlton Parkway along the Canon USA property within
<br />the channel right of way. Channel structural Improvements
<br />were designed to replace eroded and damaged areas
<br />of the channel including rip rep structures, grade control
<br />structures, and eroded soil cent ramps and slopes.
<br />The relocation includes grading, asphalt paving, fencing,
<br />ADA improvements, s1gnage, striping Improvements, and
<br />minor landscaping. Sherry prepared a detailed right-of-way
<br />mapping base to define the existing right of way and any
<br />now easements early In the design so the City coact secure
<br />timely right-of-way acquisition,
<br />CuhredUniversltya Intersection Improvement, Irvine, CA
<br />(Project Manager)
<br />Sherry managed engineering, environmental, and
<br />architecture! design services. She oversaw PS&E .
<br />preparation and the design of roadway, grading, structures,
<br />storm drain, landscape, and utility construction documents
<br />to improve level of service at this busy Intersection in
<br />conformance to Complete Streets goals. The project,
<br />scheduled for construction hnmmer of 2018, provides an
<br />add! ioral through 'au
<br />h lane along Culver Drive in each direction
<br />and right -tum lanes to Improve traffic flows.
<br />Campus DdvetBristol Streetintersection Improvement,
<br />Orange County, CA (Project Manager)
<br />The project widened southbound Campus Drive to provide
<br />an additional 600 -foot -long, third right tum lane onto
<br />northbound Bristol Street The work included the partial
<br />demolition and reconstruction of an existing maintenance
<br />building, reconstruction of existing traffic factikles, Installation
<br />of a new overhead sign, utility relocations, minor grading
<br />and re vegetation We provided traffic, civil, geotechnical,
<br />architecture, and landscape architecture servloas.
<br />*Denotes pmJects completed with otherlhms
<br />25E-795
<br />F
<br />
|