Vtotorta Street Rehabilitation, Costa Mesa, CA
<br />(Prdncpal-InChargelQC Supervisor]
<br />Mohammad oversaw civil engineering and topugraphlo
<br />surveying services to rehablbla, roadway pavement for
<br />Victoria Street from Harbor Boulevard to the Santa Ana
<br />River. There are several signalized Intersections within
<br />the project limn, including Infersectimris with Harbor
<br />Boulevard, MapleAvenue, Pomonafivenue, Placentia
<br />Avenue, HationalAvenua,AmedmAvenue, Canyon
<br />Drive, and Victoria PI ley Road. The Improvement
<br />soope included pavement rehabillfallon; reconstruction+
<br />rehabilitation of damaged curb and guitar, ores gutters,
<br />and sidewalks; driveways and driveway approaches;
<br />detailed design modifications to Improve nuisance flow
<br />drainage problems; and wheal chair ramps to meetADA
<br />requirements. He also prepared separate signring and
<br />striping plans and traffic control plans to Implement tine
<br />project improvements,'
<br />17th Street Wdil Avenue and Harbor Boutevardl
<br />Wilson Street Intersections improvements,
<br />Costa Mesa, CA (Pdnoipatin•Charge/QC Supervlsor)
<br />Mohammad oversaw PS&E preparation fur Intorsa0on
<br />capacity and aesthetic improvements at the 17th Street/
<br />Tustin Avenue and Harbor BoufevardNV'ifaon Street
<br />Intersections. Project capacity Improvements at 17th
<br />StrestfTsslin Avenue Included exclusive right tum lanes on
<br />the eastbound and northbound approaches and a far -side
<br />bus tum -out on eastbound 17th Street The Improvements
<br />at this location also Included deoorativs crosswalks across
<br />all approaches of the Intersection, new curb returns and
<br />ADA -compliant access ramps, new sidewalk and tree
<br />wells, raised medians with landscaping and irrigation
<br />systems, and new street lighting. Improvements at Harbor
<br />Boulevard and Wilson Street included an exclusive
<br />westbound right turn lane, including retaining wall design.
<br />The fain prepared all street Improvement plans for thaso
<br />projects, including roadway plan and profiles, detail
<br />sheets, traffic signal modgirzNoh, signing end striping, and
<br />street lighting,
<br />eem6td8 proJecrs e04010(dd with othxN=
<br />Smokehree Lane and JetfreyRoad Intersection
<br />Improvements, Irvine, CA (Principatin-Charge)
<br />Mohammad oversaw street widening improvenrents
<br />at the Smokedrae Lane and JeArey Road Intersection.
<br />Swims included WW design survey, roadway
<br />widening on Smoketme Lane to provide errcisive
<br />right and left tum lanes at Jeffrey Road, right opway
<br />engineering, new traffic signal installation, signing and
<br />striping Improvements, concrete bus pal Installation,
<br />geoteohnicaland hydrologyanalysla, ulilitycorndinallon
<br />and potholing, and landscaping and frdgaliar system
<br />Improvements. We also prepared separate traffic
<br />control plans for project improvement construction.
<br />Culver Drive and Walnut Avenue Intonseallon
<br />Improvements% Irvine, CA (Principalmin-Charge)
<br />Mohammad oversaw engineering design services,
<br />including widening fmprovemends along the eastern
<br />side of Culver Drive between WalnutAvenue and
<br />Srcltsdaie; widening improvements alonxg the western
<br />side of Walnut Avenue between Culver Dive and
<br />500 feet west of Culver Drive; construction of raised
<br />medians, driveways, bus turrouts, and access ramps;
<br />utility relocations; and offsite grading. Services
<br />Included final PS&E and right-of-way mapping. Final
<br />PS&E services included a design topographic survey;
<br />preparation of roadway plans and probe drawings
<br />for roadway widening; paverrsnt rehaliNtatton;
<br />offsite grading, landscape, signing and striping;
<br />and Intersection traffic signal plans; and technical
<br />specifications.
<br />Jamboree Road Widening, Newport Beach, CA
<br />(QC Supervisor)
<br />Mohammad oversaw engineering design services
<br />for widening Improvements along the eastern side -
<br />of Jamboree Road between Bristol Sbeat North and
<br />Fairchild Road, at the MacArthur Boulevard intersection
<br />to provide one additional northbound through tone and
<br />one additional southbound left -turn lame on Jamboree
<br />Road, Services Included preparing conceptual
<br />landscape and engineering plans, environmental
<br />documentlition, right -of -war mapping, and final PS&E.
<br />Final PS&E services included a design topographic
<br />survey; preparation of roadway plans and proitie
<br />drawings for roadway widening; pavement
<br />rehablIltal on; offsite grading, landscape, signing and
<br />striping, and Information traffic signal plans; and
<br />technical specifications.
<br />25E-797
<br />E
<br />9-9
<br />r=
<br />4 r•:
<br />.:
<br />L Y
<br />L
<br />Ld
<br />r
<br />r
<br />r,.
<br />L
<br />i!
<br />A
<br />4 1r
<br />off
<br />Ls
<br />w.
<br />2
<br />
|