Laserfiche WebLink
Vtotorta Street Rehabilitation, Costa Mesa, CA <br />(Prdncpal-InChargelQC Supervisor] <br />Mohammad oversaw civil engineering and topugraphlo <br />surveying services to rehablbla, roadway pavement for <br />Victoria Street from Harbor Boulevard to the Santa Ana <br />River. There are several signalized Intersections within <br />the project limn, including Infersectimris with Harbor <br />Boulevard, MapleAvenue, Pomonafivenue, Placentia <br />Avenue, HationalAvenua,AmedmAvenue, Canyon <br />Drive, and Victoria PI ley Road. The Improvement <br />soope included pavement rehabillfallon; reconstruction+ <br />rehabilitation of damaged curb and guitar, ores gutters, <br />and sidewalks; driveways and driveway approaches; <br />detailed design modifications to Improve nuisance flow <br />drainage problems; and wheal chair ramps to meetADA <br />requirements. He also prepared separate signring and <br />striping plans and traffic control plans to Implement tine <br />project improvements,' <br />17th Street Wdil Avenue and Harbor Boutevardl <br />Wilson Street Intersections improvements, <br />Costa Mesa, CA (Pdnoipatin•Charge/QC Supervlsor) <br />Mohammad oversaw PS&E preparation fur Intorsa0on <br />capacity and aesthetic improvements at the 17th Street/ <br />Tustin Avenue and Harbor BoufevardNV'ifaon Street <br />Intersections. Project capacity Improvements at 17th <br />StrestfTsslin Avenue Included exclusive right tum lanes on <br />the eastbound and northbound approaches and a far -side <br />bus tum -out on eastbound 17th Street The Improvements <br />at this location also Included deoorativs crosswalks across <br />all approaches of the Intersection, new curb returns and <br />ADA -compliant access ramps, new sidewalk and tree <br />wells, raised medians with landscaping and irrigation <br />systems, and new street lighting. Improvements at Harbor <br />Boulevard and Wilson Street included an exclusive <br />westbound right turn lane, including retaining wall design. <br />The fain prepared all street Improvement plans for thaso <br />projects, including roadway plan and profiles, detail <br />sheets, traffic signal modgirzNoh, signing end striping, and <br />street lighting, <br />eem6td8 proJecrs e04010(dd with othxN= <br />Smokehree Lane and JetfreyRoad Intersection <br />Improvements, Irvine, CA (Principatin-Charge) <br />Mohammad oversaw street widening improvenrents <br />at the Smokedrae Lane and JeArey Road Intersection. <br />Swims included WW design survey, roadway <br />widening on Smoketme Lane to provide errcisive <br />right and left tum lanes at Jeffrey Road, right opway <br />engineering, new traffic signal installation, signing and <br />striping Improvements, concrete bus pal Installation, <br />geoteohnicaland hydrologyanalysla, ulilitycorndinallon <br />and potholing, and landscaping and frdgaliar system <br />Improvements. We also prepared separate traffic <br />control plans for project improvement construction. <br />Culver Drive and Walnut Avenue Intonseallon <br />Improvements% Irvine, CA (Principalmin-Charge) <br />Mohammad oversaw engineering design services, <br />including widening fmprovemends along the eastern <br />side of Culver Drive between WalnutAvenue and <br />Srcltsdaie; widening improvements alonxg the western <br />side of Walnut Avenue between Culver Dive and <br />500 feet west of Culver Drive; construction of raised <br />medians, driveways, bus turrouts, and access ramps; <br />utility relocations; and offsite grading. Services <br />Included final PS&E and right-of-way mapping. Final <br />PS&E services included a design topographic survey; <br />preparation of roadway plans and probe drawings <br />for roadway widening; paverrsnt rehaliNtatton; <br />offsite grading, landscape, signing and striping; <br />and Intersection traffic signal plans; and technical <br />specifications. <br />Jamboree Road Widening, Newport Beach, CA <br />(QC Supervisor) <br />Mohammad oversaw engineering design services <br />for widening Improvements along the eastern side - <br />of Jamboree Road between Bristol Sbeat North and <br />Fairchild Road, at the MacArthur Boulevard intersection <br />to provide one additional northbound through tone and <br />one additional southbound left -turn lame on Jamboree <br />Road, Services Included preparing conceptual <br />landscape and engineering plans, environmental <br />documentlition, right -of -war mapping, and final PS&E. <br />Final PS&E services included a design topographic <br />survey; preparation of roadway plans and proitie <br />drawings for roadway widening; pavement <br />rehablIltal on; offsite grading, landscape, signing and <br />striping, and Information traffic signal plans; and <br />technical specifications. <br />25E-797 <br />E <br />9-9 <br />r= <br />4 r•: <br />.: <br />L Y <br />L <br />Ld <br />r <br />r <br />r,. <br />L <br />i! <br />A <br />4 1r <br />off <br />Ls <br />w. <br />2 <br />