Laserfiche WebLink
Education <br />MS and BS, Civil Engineering <br />Registrations/Cortifications <br />• Predessional Engineer#29493 (Civil), <br />#1138(Traffic), CA <br />Certified Professional Traffic Operations <br />Enginser#205 <br />Why select <br />• Recognized tmffio and Complete $treats <br />expert <br />Detailed reviewer focusing on safety; <br />quality; and sound, Implementable solutions <br />and improvements <br />Recent City project experience and deep <br />understanding of local needs <br />Unmatched knowledge of regional; state, <br />Federal, and international design guidelines <br />`Maws projects comploted wA otbor firms <br />Rock is a phonate traffic and transportation engineer who <br />specializes In panning with emphasis on active transportation and <br />its contribution to pacemaking, urban design, streetscapes, and <br />overall nobitity. He is a subject matter expert on walking, biking, <br />and appiman to Complete Shoots. Rock's 35 years of experience <br />Is welt known to beaspartatktn professionals throughout North <br />America, in part due to his service as International President of <br />the 15,000 -member Institute of Transportation Enginoars (ITE) in <br />2012 and his contirnargt service on the U.$, National Committee <br />on Uniform Traffic Control Devices and for the Transportation <br />Research Board. <br />Rock is a strong advocate in developing and standardizing unique <br />and innovative concepts to Better serve walking and biking. He is <br />also an excellent presenter and facilitator in building consensus for <br />complex transportation projects. This expertise, coupled with his <br />strong experience and credibility in traditional traffic engineering, <br />operation of tragi@ signals and traffic safety, are of great value in <br />presenting technically complex projects. <br />Santa Ana Cycle Track, Santa Ana, CA* <br />(Traffic Engineer/ActiveTransportatton Planner) <br />Rock proMed t afric engineering, design oversight, and active <br />transportation plats for this 2.4•mlie separated bikeway within the <br />City of Santa Ana, The project Involved concept refinements and <br />precise alignment studies for the protected bike lanes utilizing <br />raised medians; landscape Improvements, bdib-outs at designated <br />intersections, and traffic signal modifications. <br />Redondo Beach Cycle Track, Redondo Beach, OR <br />(Project Manager) <br />Rock managed this project to develop plans for proposed bicycle <br />friendly facilities along two Important roadways within theft Marina <br />district. The project, opened in June 2015, provides benefits <br />to motorized and norrmotorized users, and further beautifies <br />Redoruio's Harbor Gateway, Rock provided traffic analysis and <br />road diet and roundabout simulation, conceptual visualization, <br />field survey and aedattopography, civil design of the cycle track, <br />drainage fecitides, and related signing and sniping plans, He led <br />the design concepts and stakeholder and commission meetings, <br />along with several public workshops. <br />This project has won more than six technical awards and <br />commendations to date and is used by more than one million <br />cyclists annually. <br />25E-798 <br />