Laserfiche WebLink
Butterfield Stage Road, Phase 3 improvements, <br />Butterfield Stage Road and Rancho California !toad <br />Intersection Improvements, Temeouls, CA <br />(Project Manager) <br />Carlos civil enonoedng design and geld survey <br />services for the design of Subftli Stairs Road, phase <br />3 improvenernis. This project widened 4,300 lineal feet of <br />Butterfield Stage Road from La Serena Way to Rancho <br />California Rosi from a two to a fora -lane roadway with <br />his lanes and a rated mcelian. The project widened <br />gra easterlyslla of Butterfield Stage Road aril the pians <br />required permits from the City of Temecula, County <br />of Riverside Transporldrin Department and Flood <br />Control District. The project involved extensive grading, <br />20 -foot -high retaining wail design, and three drainage <br />culvert extension. The project designed the Butterfield <br />Stage Road and Rancho California Road Intersection <br />Improvements, which included abaft signal modification; <br />widening of 1,000 linear feet of Rancho California Road, <br />and drainage Improvements. Design plats included plan <br />and profile plans, signing and striping plans, grading plans, <br />erosion control pigs, drainage plans, retalning wail plans, <br />street gghWg pians, traffic signal modilcagon plans, and a <br />water quality management pian. <br />Aimee Aides Bulb -Out Installation and Buena Suertaf <br />La Miranda Median Inprovemerd, <br />Rancho Santa Margarita, CA (Project Manager) <br />Carlos marded the design of bulbouts, landscaping, and <br />hmigatlon at two hgirprogle hnersectris in residential <br />neighborhoods. The project also Installed a median and <br />associated landing and irrigation at another high <br />profile Intersection. Work also Included public outreach <br />In coordinaft the work with nearby schools, The <br />Improvements Improved pedestrian visibilly, and reduce <br />vehicle speeds. <br />FY 2010.2011 Grouped CDBG Projects, Pomona, CA <br />(Project Manager) <br />Carlos managed design activities, preparation of PS&E, <br />right-of-way services, and as'naeded construction <br />management services for the following Community <br />Development Block Grant (CDBQ) funded projects: <br />ClywkIoAlley Improvements (Project No. 21364646); <br />CitywideADAftessible Path of Travel -Ailey Intersections <br />and Curb Ramps (Project No.21364646); Citywide Street <br />Lights (Project No. 213-64647); and Sidowaik-D stdots 2 <br />and 3 (Project No. 21364648). <br />Inod" projectseompbrodwithodierarms <br />fid f f, t 1 <br />^ii4 1yY Y�::: l.. 1 411 VI if 1. i <br />IV WANAIN410111i .>yi: f. 13 , if W• <br />Y W n 1... <br />Cerritos Avenue Widening, Cypress, CA <br />(Project Manager) <br />Carlos managed widening of Combs Avenue to relieve <br />an existing bottleneck. The widening Improvement design <br />was so mpilshad without right -away acquisition. <br />improvements Included sheet widening to provide <br />additional through capactir removal and replacement <br />of curb, guW,, sidewalk, curb ramps, and driveways; <br />relocation of traffic signals, power pales, light poles, fire <br />hydrants, and ublfiy boxes; and asphalt paving, trattic <br />striping, retaining wall con n, and other appurtenant <br />stte Improvements. <br />Pleasant Valley Road Improvements, Camarillo, CA <br />Frojeot Manager) <br />Carlos provided old engineering design to improve a 1.8 - <br />mile reach of Pleasant Valley Road, an important arterial <br />highway In the City of Camarillo. This project resulted from <br />a condition of approval for the development of Village <br />at the Park, a 450 -acre masterplonred community, <br />Improvements consisted of widerniag the mad from two to <br />four lanes; accommodating the widening of the bridge over <br />Caileguas Creak and prbvlding adequate freeboard at the <br />Creak; two new traft sigma and a signal modification <br />at Le VAS Street; drainage improvements; and a sewer <br />force main to serve the newly -developed community. The <br />Project required permits from the City of Camarillo, and <br />ono finstlon with Caltrans and it* County of Ventura. <br />Jeffrey Road Infrastructure Improvements, irvine, CA <br />(Prcjeat Manage <br />Carlos managed the preparation of infrastructure plans, <br />Including street improvements, right-of-way engineering, <br />storm drains, shy, grading, water and sewer, dry <br />utilities, specifications, and construction cost estimates for <br />1.5 miles of Jeitrey Road for the City of Irvine. This project <br />also included 1 mile of Porlola Parkway improvements. <br />Both JeiErey Road and Porlole Parkway include <br />reallomerds and street design for a able -Imre highway <br />with raised modhans; pedestrian unde omosing; water and <br />sower relocations up to 36 Inches In diameter; and dry <br />utility design for electricity, gas, and cable. Improvement <br />plans were processed and approved by the City of Irvine, <br />Irvine Ranch Water District, and the County of Grange. <br />25E-801 <br />11 <br />