Culver DrivatUnhrerskyAvenue Intersection and
<br />Widening, Irvine, CA (Project Eingineer)
<br />Susan provided fullA-E services fcrthe City at this major
<br />arterial Intersection to Improve the LOS and mitigate the
<br />future projected substandard LOS at the Culver Dive and
<br />University Drive intersection. She Is helping provide civil
<br />engineering, rightof way services, landscape design, flood
<br />control, uflMy relocations, and environmental permitting
<br />through final PS&E.
<br />Redondo Snob Cycle Track, Redondo Beach, CA
<br />(Project Designer)
<br />Susan helped develop plans for proposed bicycle friendly
<br />facilities along two important roadways within Redondo
<br />Beach's Marine district She helped prepare concept
<br />drawings and final plans for the favored alternative, which
<br />Includes a Class I separated cycle track and City Welcome
<br />Park while increasing parking capacity within the coastal
<br />zone. The project included traTflc analysis and simulation
<br />of the mad diet and roundabout, conaepival visualization,
<br />field survey and aerial topography, civil design of the cycle
<br />track, drainage facilities, landscape and site furnishings,
<br />and related signing and striping pians.
<br />John Wayne Airport Campus DrivelBrlstol Street
<br />Intersection improvements, Orange County, CA
<br />(Project Designer)
<br />Susan is providing design and engineering services. The
<br />Project consists of widening southbound Campus Drive to
<br />provide an additional 660 -foot• -long, third right -turn lane
<br />onto northbound Bristol Street.
<br />Burbank Channel Bikeway Project, Burbank, CA
<br />(Project Engineer) .
<br />We are providing full A-E and environmental services to
<br />the City of Burbank which completes an Important bikeway
<br />link through design of a Class I bikeway and mutt) -use
<br />trail along the Burbank Channel, This bikeway will extend
<br />from the City s Matrolink station south toward the Los
<br />Angeles River Trail located just beyond the City limits. We
<br />have provided presentations at eounoil meetings, met with
<br />the commonly in open gatherings and on"n-ane with
<br />the City, and also helped develop a community survey to
<br />gather Input from all Interested members. Our concept
<br />designs looked odosaly at each of their concerns and
<br />provided detailed oostestimates of the proposed project
<br />adematives. One of the interesting project challenges Is
<br />the conversion of an abandoned rad road spur tine bridge
<br />to be used for the bikeway with added protective railing.
<br />We are also providing at -grade crossings at four locations
<br />and linkages to dead-end streets at four locations.
<br />*Domw/es proppis completed vier other firms
<br />Bayview Drive Improvements, County of Orange, CA
<br />(Project Engines)
<br />Susan provided professional engineering services for the
<br />sleet improvements including preparation of a Focused
<br />Study Report Her services Included an alternatives
<br />analysis to alleviate flooding and pending Issues, as well
<br />as avoid utility conflicts during the construction of a new
<br />storm drain and shut improvements, right-of-way studies,
<br />detail hydrology and hydraulics computations, and
<br />preparation of the Environmental Analysis Checklist,
<br />Moulton Parkway Smart Street Widening
<br />Improvements, EI Toro Road to Santa Maria Avenue,
<br />Laguna Woods, California (Project Engineeri
<br />Susan served as project engineer for civil engineering
<br />and design services for Moulton Parkway Smart Street
<br />Improvements Including Class 2 Bikeway from 400 feet
<br />north of El Toro Road to 56 feet north of Santa Mafia
<br />Avenue, Improvements Included raised medianislands,
<br />median and parkway landscaping, concrete bus pads,
<br />street lights, m odifkation of existing tragic signals, signing
<br />arab striping, soil nail wall, retaining walls, wrought iron
<br />fencing, and adjusting and relocation of utilities. Stantao's
<br />services Included preparing PSE documents for the
<br />Proposed Improvements. Close coordination with the
<br />Orange County Public Works and other consultants was
<br />needed to, achieve the goals of the project.
<br />On -Call Street Improvements In Lake Forest's Light
<br />Industrial Area, Lake Forest, CA (Project Engines*
<br />Susan provided engineering for Front Street, Orange
<br />Avenue, and Whisiar Driv"I located in a light
<br />Industrial area ---to improve roadway surface, drainage,
<br />and pedestrian amess. The scope of work Included
<br />Preparation of numerous aldomatives to design
<br />improvements with the least of right-of-way impact. She
<br />provided a design solution to an o)isdng drainage sump...;
<br />with no storm drain outlet by modlfying the street cross
<br />section to provide positive surface drainage towards an
<br />existing storm drain system.
<br />Kline Drive Roadway and Storm Drain improvements,
<br />County of Orange and City of Newport Beach, CA
<br />(Project Engineer)
<br />Susan developed various alternatives to alleviate storm
<br />drain Issues, prepared detailed hydrology and hydraulics
<br />computations, and prepared the County of Orange
<br />Environmental Analysis Checklist.