My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jeff Wilkerson . <br />PE <br />Deputy Project Manager and <br />Civil Design <br />Education <br />• NIS and BS, Civil Engineering <br />ReglatrattonsfCartificatlons <br />Professional Engineer#10166, CA <br />Why select <br />• Experienced task manager for <br />on-call contracts <br />• Extensive PG&E package preparation <br />exporter" <br />• 16k years local Orange County agency <br />experience, including for Santa Ana <br />. "aenotesprnJectscompnenedwfnhadratams <br />i. <br />Jeff is an experienced engineer and projedRask manager with 18 <br />years of Orange County agency project experience, Including for the <br />City of Santa Ana He regularly prepares PS&E packages for madway <br />Improvements, site improvements, and water and sewer systems for <br />numerous public and private agencies. He tris meant knowledge <br />of and experience adhering to and applying Caltrans; Green Book; <br />APWA; and local agency, state, and Federal standards. <br />Santa Ana Cycle Track, Santa Ana, CA (Project Engineer) <br />Jeff asslsted with the design and studies for the cycle track within <br />the City of Gants Ana. We provided concept refinements and precise <br />alignment studies for the protected bike lanes utSzing raised medians, <br />landscape improvements, bulb -outs at designated Intersections, and <br />traffic signal modifications, The design will complete a one-way cycle <br />track in each direction along 5th and 8th Sheats. The goal is to have <br />the cycle track reach the Santa Ana Regional Transportation Center, <br />The total project length is 2 mites of one-way cycle hack and 0.4 miles <br />of two-way cycle track. <br />Jeffrey Bike Trail Extension*, Irvine, CA <br />(Engineering Task Manager) <br />Jeff provided assistance for the extension of the Jeffrey Bike Trap <br />Services Included survey and mapping, legal descriptions and plats, <br />bike trail improvement pians, signing and striping, lighting plans, Witjl <br />SCE coordination, Caltrans encroachment permit processing, and <br />construction costs and specdtloations. <br />Howard Way, Century Place. and 16th Street Roadway <br />Rehabilitation, Costa Mesa, CA (Project Manager) <br />Jeff managed engineering design services to rehabilitate and <br />reconstruct Howard Way; Century Place, and 16th Skset Project <br />Improvements Included pavement reconstruction, reconstructing <br />damaged curb and gutter, cross gutters, sidewalks, ddveways and <br />driveway approaches, and wheel chair ramps (WCR) to meet ADA <br />requirements. Design plans were complied with the latest adttion of <br />Caltrans, Green Book, APWA, and 014 standards. <br />Victoria Street Rehabilitation, Costa Mesa, CA (Project Manager) <br />Jeff managed civil sngineering and topographic surveying services <br />to rehabilitate roadway pavement for Victoria Street from Harbor <br />Boulevard to the Santa Ana River. There are several signalized <br />Intersections within the projoct limits, <br />25E-804 <br />
The URL can be used to link to this page
Your browser does not support the video tag.