Laserfiche WebLink
APPENDIX A <br />C.ONTACT INFO <br />old iw' <br />-00te, <br />rvfyok� CA <br />� J <br />PETE GOLDINGr PLS <br />SurveY/Mapping <br />. ... ........... ....... ........ ...... ........ 4 ......... . . .......... . .. <br />Mr. Goldingbrings-43 years of agporienoe that Includes a w1deverioty or pr9jects <br />In both land development and public works projemi - He has completed surveying <br />ptoldrits In California, Nevada and VAsconsin and his expertise Includes hundreds of <br />boundary retracements, mary1rivolving the Public Land SurvaySystem, Qps Surveying, <br />map and ALTA proclkmbor� and construction svrveYlhg� He has extensive offco and <br />ffeld experience supporting his clients, He has Prepared hundreds of Plats and legal <br />descriptions, Hahas prepared and been in responsible charge of many parcel Maps, <br />Final Map$ WW Records of Survey. He has also Performed many topographic surveys, <br />by photogrommetric Methods as well a5by field collection method& <br />PfQJ90t EXperlence <br />- ..... ........ ........... ............. ........ ................ <br />Sundae Powerfink Project I Son D109D OAS & Electric I Sail DIago <br />County, C.A <br />Project manager forsurvey and aquIsItIon drawings for approximately:1,38 miles of <br />new transmission corridors through San Diego County, Project Included the subdivision <br />Of 8PPr0YJmatG1Y 86 sections through 20. townships. Field crews recovered more than <br />100 GLQ/ULM m0r1(Jm6ntS, marri from the surveys. performed in the :LS80S. ALTA <br />SUM" Were pefformed on mitigation properties purchased by SDQ&�, follow ad by <br />flOngtociords of Survey witk1he county surveyor, <br />Qualcomm Stedlurn EKicamalon I QtraicoMm Stadium I Son Dlegol CA <br />ProJecit surveyor for topographic survey of Qualcomin Stadium and.surmunding parking <br />lotand facilities. Setandtled pre-MarkstoUlfbmis COordinateSysbein andtoexisting <br />stadium oontrol geometry. Provided additional survey data frainfleld Shots on columns, <br />wells, seating levek4 <br />International Boundary Water Commission I US/MOXIOO Border <br />Responalblefor survey projects on the US/Maxlco border InvolvingSewer and drainage <br />issues affecting both Countries, Provided survey control for construction of the new <br />Sewage Treatment Plant <br />Beach Restoration I County of Sea Diego I Son Diego, CA <br />Set and tied survey control points for photogrammetric surve . Y Of several of San Diego <br />County's beaches Including Imperial Beach and north county beaches from La Jollato <br />Oceanside. After restoration design, provided survey control for fill Send dredged from <br />offshore and pumped onto the beaches. <br />The Crosby lEstate I The Crosby Family I Rancho Santa Fe, CA <br />Responsible for construction StOldrig at now golf course community In Rancho Santa <br />Fe. The project Included a now golf course, driving range, golf club, tennis and <br />swim lokib as well as a mlx of residential units Including single family homes and <br />condominiums, Performed stalkingfor now hiking trall along the San Diegulto River. <br />Navy Clean 111 Bechtel Corporation I Southern 0011fomia <br />Survey Manager for projects Performed under contract with the Bechtel Corporation for <br />the federal Program to remove environmental hazards from military bases throughout <br />Southern California. Much of the work Involved GPS Surveying to set up control on the <br />bases for Investigative/exploratory work by environmental team$. <br />25E-547 <br />