My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNKTUREC3W <br />CONSULTING ENGINEERS <br />RtSM FOR <br />OPTY N. FERNANDEZ <br />EDUCATION Chief Eledflealfirloineor <br />B.S.. Elwince Engineering, Caftfornis state university, Long Beach, cA It,82 <br />PROFESSIONAL REGISTRATION <br />Asolstered Electrical ll�nginosr. California E-011249f; <br />PROJECT EXPERIENCE <br />Mr. hmandez has over 30 yea <br />ra of diverse experience in all facets ofelectrW engineering; Including law and medhan voltage <br />power distribution, process Instrumentation and controls, power quatty shot <br />If les. and value anginowing. He has experience in <br />waterand wastewater, municipal, lostasidel, commercial, ho technology industrial and Insinio" inifies. Kc pan <br />adezimm <br />been ravonsible foriechnicat ",is% construction management quality assurance, 01ras and <br />Mr. Fernandegs Want design experience Insfuleaffledium (Up to 66K�) <br />and low V0111V process and equipment o0flif'018,P1.0 Integration design ondimcgemmkiti, DC4 SCADA, <br />tolemefty, IfAlween devalopmenvusing popularsonwere such as Wonderwase and RSVIOW, smortiency ofidstand-by Pa4r <br />generation, UPS god bi*povmr, and Indoorand outdoor Itiltiffnill, <br />REPRESENTATIVE PROJECTS <br />CRY of CAMAIVIC, Wastewater Pumping Station No. a <br />Ned StAtus'OPeakfirg since ON5. The-lobject Is a now wastewater pumping fift $talkm for a now housing cleavelopment in <br />the City of Comedic, The Oft stallon Is capable OfPwnP!ng 11100 gallons Pei Minutq and Is equipped with three (3) 25 <br />horsepower pump. All the electrical equipment is installed outdoor in a'141* 4 imstomire hictuding; ft'm* seitchboatd, the <br />motor control center end the control panel, Each pump Is controlled by a varl" frequency drive which operates to match In <br />Incoming Raw. An Intograted PLC, OIT and telemetry system controls the lift station and commookate; *a stallon status, <br />coottels, and alann points to oil existing SCADA system. The Oft station to equipped wfth a igh KW s"ygenarzter in the <br />aventatutlifty-powlailm. <br />Las Alamitos Mfostewater Pump Station <br />P10IMStsWB:OPemU4oshcei2/Q8i Prepared a prollmloary closligi report and finald"n plans for do Devehoperfunchui <br />Storm Water Pump Station In the Los Alamitos ftce Track Parking Lot. Fgoilky�ndudesiBOOggmsubmeraWlepwnplamt <br />well with valve vaults, the MCC, Control 8ystaon Thalaoliftypump the collected storm water road Imrs the parking lotinto a <br />local storm drain system. <br />Comothella Valley Water District, indlan Wall Lift Station <br />Project Stakis: OperalingialrosON6, The OR station consists of two 60 bp pubm.sibla pumps controlled by varlableftecteemy <br />cirlues to moduleto the Pump$ and match the incoming flow. A 200 IkW diass! generator p mAde emeromeyPower In the evqnt)of <br />utiRY Power Oulatia, The stallon is monitored and controlled locally a local PLO god ramalsly vla an exhating $GADA system, <br />Walnut Park Water District Booster Pump Station Replacement <br />Project 81olow, Operating since UK The project encompasses the replacement Of a closed system booster pump station and <br />associated equipment which Includes the replacement of existing electrical service equipment pumps and motorsi motor control <br />center and provisions for a future 1600 lipm wall-fri addition, a new PLC based cordnal system and Instruments were provided to <br />control the now booster station, the existing two (2) 125 hp well pumps and the future well pump. Furthermore, the existing 460 <br />kW diesel generator and automatic transfer switch were saWaged and Integrated wifli the now dleolrical system as well as food <br />to the existing wall pumps and chlorination facility. <br />25E-548 <br />
The URL can be used to link to this page
Your browser does not support the video tag.