My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
each alley, prepare of design cross sections at 25' Intervals for review of proposed cross bils, preparation <br />of sewer main replacement and lateral replacement plans, field review of all alley locations to field locate <br />existing utilities, conflicts, and johi locations, Identificationof sewer laterals that have been recently been <br />replaced for protection, and the detailing of all alley approache.s.for ADA compliance. <br />Citywride Comprehensive Drainage <br />_11 �k I - . �V' I . wal ro-.s <br />Diamond Bar, CA <br />TAITwas hired hythe Cftybf Diamond Barto analyze, design and recommend <br />pavement and drainage solutionsfor 11 locations throughoutthe City which <br />currently experience groundwater seepage problems. The analysis Included <br />field Investigations, geotechnical testing and reporting, pavement design, <br />and the preliminary design and cost estimating for multiple design scenarios <br />at each project location, The costestimate included estimation of the design <br />consultant fees as well as the construction costs for the ultimate design <br />scenarios. <br />Extensive coordination was required on this contract with City, Utliltyj <br />LACFCD Staff, and private residences In order to understand the existing <br />conditions and to project the required design and permitting efforts for the <br />design and construction phase. Upon completion of the report, the City will <br />utilize TAIT's recommendations for future CIP budget and project planning <br />efforts in order to jtjstifythe cost and Importance of each location, <br />Harbor Boulevard Water & Street <br />Reconfiguration, Project- Garden Grove, CA <br />This project Included street reconfiguration (approximately 1/3-mile total <br />length), Improvements to an existing raised median, a new traffic signal, <br />abandonment of existing 8-Inch ACP and 12-Inch DIP City water lines, <br />Installation of a 800 LF of 16-Inch water line, relocation of SCE and AT&T <br />main distribution service lines, and the Installation of new public storm <br />drains and sewer and water services to accommodate a future <br />redevelopment project along Harbor Boulevard from Palm Street to <br />Lampson Avenue In the City of Garden Grove, Engineering services required <br />extensive research, review, and a potholing program for the Installation of <br />the new utilities and storm drain Improvements within the existing six -lane <br />Harbor Boulevard roadway. TAIT, woIrking with City Water Department, <br />proposed the Installation of a cut -in valve to ensure continuous water <br />service to a medical facility during the construction of the water line <br />Improvements, The Construction Bid cost was approximately $1,400,000 <br />with a 2013 completion. <br />Reference: <br />Christian Malpica <br />Tel-, 909-839-7042 <br />Key Staff- <br />PIC.$ Jacob Vandervis <br />PM: David Voan <br />PE Michael belagarza <br />Client: <br />City of Diamond Bar <br />Construction Cost: <br />Approx. $1.5 M <br />Project Dates <br />2014-2015 <br />Referencel <br />Bill Murray, P.E. <br />Tel: 714-741-5379 <br />Key Staff: <br />PIC: Jacob Vandervis <br />PM; Todd Schmieder <br />Client. <br />City of Garden Grove <br />Construction Coab <br />$1.4 M <br />Project Dates <br />2012-2013 <br />TAIT Page 111 <br />25E-570 <br />M, <br />ry <br />17 <br />uh <br />LA <br />as <br />
The URL can be used to link to this page
Your browser does not support the video tag.