Laserfiche WebLink
TAIT & Associates, Inc. <br />On -Call Engineering Services <br />Project Schedule <br />The following represents a preliminary project schedule for the development of construction documents <br />for the Mile One project. This preliminary schedule will be reviewed with the City at the projeces Kick <br />Off meeting and a final project schedule will be Issued based on those discussions. <br />The Project schedule will be made available to all design team members and will monitored on a <br />continuous basis through the projeces design life, Any changes to the Schedule will be reviewed with <br />the City and action plans, If necessary, will be developed to prevent schedule delays, The following <br />schedule has been developed based on previous project experiences: <br />Project Sched.10 <br />City of Santa Ate, � Mile One Street Project <br />Preliminary Schedule <br />ID <br />Tart, some tan <br />pvraaaa� <br />said, <br />4.1 <br />I <br />i;;f-cafltr* at Uslaits Mon4f2/10 Man �qlllff <br />4/2 <br />lildnolfNialthat 00111105 TINIAlisillil like 4/ig/18 <br />Nip is issued Delays MundlIG/18 Mcmdl/16/111 <br />Prepare & Issue Bid Documents U4 dayMon V16118 Thu 10/91/18 <br />! <br />415 <br />4/16 <br />I <br />a <br />Records Ruearch & Initial Design Field is Man 4/16/18 Fri S/4118 <br />199 <br />Walk day$ <br />Field tualiptsurver Services S days man 4100118 Fri 514114 <br />6 <br />7 <br />Prepare Base Map 10 day$ Mon 4AQJ18 Fri 5/11/18 <br />Utility & Nolon 119 daymor, 410418 Thu 9127/18 <br />a <br />1 <br />Utility Contact List & Notice Preparation Sdays Mon4/16118 Fri 4/20/18 <br />-10- <br />Send let Utility Notice Odays F04120/18 Fri 4/20/18 <br />0 <br />Send 20d Utility Notice% 0days, Tm7/Mlg Tue?/3/18 <br />+713 <br />12 <br />Send 3rd Utility Notice (As Needed) Odays ThuW27/18 into 9/27/18 <br />U <br />Preliminary Design 17clayIdefirall/14/18 Toe 615/10 <br />Prepare Preliminary Layout Plan 10 days Mon 5/14/18 Fri SASAS <br />City Review Ptalminary Layout Plan Sdays Mvn$/28/10 Fri 6/1/18 <br />Design Review Meeting 0daYs lua6/5/18 Tue 6/5/28 <br />plans's Pat Iftcallons, , & Estimates #?daysWad6jG/LG Thu 2414ilit <br />14,�� <br />/a <br />is - <br />t <br />is <br />17 <br />-is <br />prepare 65% PS&C 2QdaWWedD/6/18 Tue7/3/18 <br />Conduct clootedudcol Investigations 20 days Wed 6/13/18 net'J/ilvig <br />- <br />City Review 65% PS&E 10daysWed7/018 Tut7/1'1/11L <br />65% Design Review, meeting OdAY5 Tinly/As/Is Thu 7/19/18 <br />prepare 100% PS&F 30 days Wed 7/10118 Ina 0/2$118 <br />earn <br />21 <br />-!�- <br />23 <br />Incorporate Goatechnical S days Fri 7120118 Thu 7/26/18 <br />Reacernmenclations <br />2j7' <br />5 <br />City Review 10e%pS&E 10 days Wed 8/29/18, Toe 9/11/18 <br />100% Design Review Meeting Delays Tht,9/13/18 Tim9/13/18 <br />P repa, (a Final P site 10 days Fri 9/14 AR T hull/27/18 <br />27 <br />City R QvIew & Approve Final PS&E Did Schwa Frl!)/28�19 Thu 10/4/19 <br />Documents <br />Environmental Documentation 114trysp,17/27/19 F1,111/10/28 <br />Conduct 1mvIrommeaul Kick OffMaeting %day rti'/127118 Fri 7/27/10 <br />2R <br />29 <br />ao- <br />Prepare Environmental Documentation to days Mon MOM Fri 8/10/10 <br />Submit linvir. Documentation to City Quays Frig/20118 Fri 0/10/18 <br />at <br />i2 <br />Federal Funding Assistance loptional 110 Mon 4/161111 Fri 0/14/10 <br />$make) days <br />Prepare & Submit PES 10daYSM(n)4/16/18 Fri 4/27/18 <br />3F <br />34 <br />Caltrans, Review & Approve PES 40 days Man 4/30/18 Fri 6/27.118 <br />75- <br />prepare & submit R/W can 20 days Mon ililrUIR Fri 6/29fig <br />Caltransitavlewlis Approve IUW Our 4 0 d <br />36 <br />oys Mon 7/l/ 1 8 F rl 81241 19 <br />$ <br />Prepare & Submit AFAAE-76 Application 10 days Mon 8/20/18 Fri 8/31AS <br />Coltrane Review & Approve AFA/E-76 10 days MOO 9/3/18 Fri 9/14/18 <br />, 19 <br />i�a <br />Tait T�.. T.0, Metier. <br />cK, ?.� sotutis, <br />ctl"".Tu EM=:WXMI� <br />I I I Page 120 <br />25E-579 <br />