Laserfiche WebLink
TAIT & Associates, InQ <br />On -Call Engineering Services <br />Glendale for Glendale Water and Power, Primary responsibilities were to review and stamp plans and <br />specifications, supervise design engineers and coordinate with client and contractor through the design <br />and construction phases. <br />Monterey Park Plaza, Monterey Park, CA, Project Manager, 2615 — Present <br />The design of the development Includes slope stabilization, retaining wall design, street Improvement <br />design, utility Installation, overall site development, and over 400,000 cubic yards of dirt removal and <br />regrading. The project Involves three geotachnical analysis. The geotechnicalanalysis Included <br />recommendations for the design on and near the1andill]; for the slope. stabilization throughout the site; <br />and for the overall site development and construction, The project utilized detailed retaining Wall <br />designs and In some areas, pile designs. These retaining walls and pile designs were specially designed <br />near SCE.facilities and towers. Unique construction equipment has been detailed out and coordinated <br />forthis construction. <br />On -Call Engineering Services, Orange County Public Works, Principall-In-Charge, 201Q 4 Present <br />PrIncipal-in-Charge of the work being conducted by all TAIT staff and sub -consultants to provide Plan <br />Check and On -Call Engineering Services for the County of Orange Planned Communities. Primary <br />responsibilities were to ensure the project Is properly staffed and that the work Is completed to the <br />satisfaction of both TAIT & Associates as well as the County of orange. <br />100, Acre Parcel Development El Toro Marine Base, Orange County Public Works, Irvine, CA, Project <br />Director, 2009 — Present <br />Prepared Infrastructure assessment of the existing Marine Corps base facilities on the southerly 100- <br />acres that had been closed In recent years. Reviewed existing record documents, met with utility <br />purveyors., Inspected existing structures and roadwaysi and prepared executive summary for <br />presentation to the County of Orange for potential reuse of the facilities. <br />FBI Training Center, Orange County Public Works, Irvine, CA, Principal4n-Charge and Structural <br />Engineer, 2007 -2008 <br />Provided structural design for a 1,480 square foot masonry block structure to be constructed at new FBI <br />training facility an the former El Toro Marine Base. The site Improvements were to Include the <br />construction of a new classroom and a covered training area adjacent to an existing structure. The site <br />was a former USMC shooting range and was being upgraded by the FBI, To help minimize the overall <br />construction cost and to speed up construction, the use of a pre -manufactured roof truss for the <br />structure was proposed. The design/build construction of the facility was completed in August 2008. <br />Abridged List of Additional Project Experience by Jake- <br />> City Hall Underground Fuel Storage Tank Removal and Replacement, City of Irvine, Principal -In - <br />Charge <br />> Foothill Crming, City of Rancho Cucamonga (Principal -in -Charge) <br />> Columbus Square Infrastructure Improvements, City of Tustin, (Principal -in -Charge) <br />> Entertainment Park, City of Ana helm (Senlor Project Manager) <br />iTAIT Appendix I Page 2 <br />5E-581 <br />