TAFT & Associates, Inc.
<br />On -Can Engineering Services
<br />wmmmm�
<br />r
<br />L
<br />Bentley Microstation and Geopok software was primarily used In the design and preparation of plans.
<br />The project was directed by the North Dakota Department of Transportation.
<br />r
<br />Adams Hill Water Main Replacement Project, Glendale Water and Power, Design Engineer, 2014
<br />The Adams Hill water main replacement project Included six phases, 1:3 streets, and approximately
<br />10,620 linear feet of water line that was designed to replace existing service pipe mains with ductile Iron
<br />pipe. The project Included new services, hydrants, inverts, tie -Ins, and other appurtenances. As well, the
<br />project Included different pressure zones and the InsWiation of a division gate. Department of Public
<br />Health waiver exhibits were prepared for select non -potable and water crossings. The project included
<br />a communityoutreach meetings, service survey coordination, aswell as detailed final As-Bulit
<br />submittals.
<br />Monterey Park Marketplace Site Development, Monterey Park Retail Partners, LLC/City of Monterey
<br />Park, Design Engineer/Project Coordirratort 2015
<br />TAIT was awarded a contract with the developer, Monterey Park Retail Partnersi LLC for the design of a
<br />41 acre retail development within the City of Monterey Parkand the City of Montebello. The design of
<br />the development Includes slope stabilization, retaini ng wall design, street -improvement design, utility
<br />Installation, overall site development, and over 400,000 cubic yards of dirt removal and regrading. The
<br />project Involves three geotechnical analysis. The geotechnical analysis Included recommendation$ for
<br />the design on and nearthe landfill; for the slope stabilization throughout the site; and forthe overall site
<br />development and construction, The project utilized detailed retaining wall designs and In some areas,
<br />pile designs. These retaining walls and pile designs were specially designed near SCE facilities and
<br />towers. Unique construction equipment has been detailed out and coordinated for this construction.
<br />Foothill WaterUne Improvement Projects, Golden State Water Comparry,.DesigivEngmeer, 2013
<br />The Foothill Improvements Included six projects that were designed to replace existing service pipe
<br />mains with 8" ductile Iron pipe. One of the six projects Included replacement of the transmission line
<br />and reconnection to three existing wells, The total pipe replacement Was approximately 13,200 linear
<br />feet. Multiple agencies reviewed the design plans, Including City of San Dimas, City of Claremont, City of
<br />Arcadia and the County of Los Angeles In addition to Golden State Water.
<br />Freeman Ave. Water Line improvement Projects, Golden State Water Company, Project Design
<br />Enginear,2013
<br />The Freeman Avenue Water Line Improvement Included approximately 3600 linear feet of water line
<br />that was designed to replace existing service pipe mains with 8" ductile iron pipe. The project included
<br />new services, hydrants, Inverts, tie-ins, and other appurtenances, Department of Public Health waiver
<br />exhibits were prepared to the satisfaction of Golden State Water Company for select non -potable and
<br />water crossings.
<br />Normandle Ave. Water Line improvements, Golden State Water Company, Design Engineer, 2013
<br />The project encompassed the planning and design for a 12" water main replacement In Normandle Ave.
<br />In the County of Los Angeles, approximately 1400' linear feet. Project Included new services, hydrants,
<br />Inverts, tie-ins and other appurtenances, Existing 14" pipe was designed for abandonment, Department
<br />of Public Health waiver exhibits were prepared to the satisfaction of Golden State Water company for
<br />select non -potable and water crossings, GWSC project engineer: Conde Ventura.
<br />Appendix I Page 9