Education
<br />B.S. — Civil Engineering
<br />Valparaiso University
<br />Vplparalso, IN, &2
<br />Year of TAIT Team
<br />Enlistment
<br />2012
<br />Total Experience
<br />6
<br />Certifications
<br />Professional Engineer
<br />California No. 86126
<br />TAIT & Associates, Inc.
<br />On -Call Engineering Services
<br />Samantha A. Woh1farth, PE
<br />PRoXCr&JG1NffR
<br />Ms. Wohlfarth has professional experience that Includes the preparation of
<br />grading plans, water main replacement plans, storm drain plans and drainage
<br />reports, sewer plans, cost estimates and storm water management reports for
<br />public and private developments throughout Southern California, Western
<br />Washington, and North Dakota. Her project experience also Includes the
<br />preparation of storm water quality reports such as SWPPP. WQMP, SUSMP and
<br />LID as mandated by the -state and local municipalities. Ms. McGee has technical
<br />kriewledgewith.multiple software programs Including AutoCAD 2014, Civil 31),
<br />Land Desktop, Microstation, GeoPak, WWHM2012, RetalnPro, and additional
<br />specialty programs,
<br />Deaudry Terrace Water Main Replacement Project, Glenc(ale Water and Power,
<br />Project Design Engineer, 2014
<br />The Beaudry Terrace water main replacement project Included four phases, six
<br />streets, and approximately 5,300 linear feet of water line that was designed to
<br />replace existing service pipe mains with ductile Iron pipe. The project Included
<br />new services, hydrants, Inverts, tie -Ins, and other appurtenances. Department of
<br />Public Health waiver exhibits were prepared for select non -potable and water
<br />crossings. The project Included a community outreach meetings, service survey
<br />coordination, as well as detailed final As-BuIlt submittals.
<br />SIlVerad0 Campus Conversion, County of Orange, Project Engineer, 2013.
<br />Present
<br />TAIT's current task order assignment with OC Parks Includes preparing plans for
<br />the demolition of several existing campus structures with the conversion of the
<br />former classrooms an ' d office space Into a County Library, offices for County Park
<br />staff, and community meeting rooms that cover 3500 square feet of usable
<br />enclosed space. Site work In the Initialphase will consist of Implementing Code -
<br />requited ADA Improvements for public access at the campus and for public
<br />restrooms, upgrading of the existing parking lot, and provisions to provide
<br />security lighting for night-time use of the facility.
<br />State Street (Highway 83), North Dakota Department of Transportation,
<br />Bismarck, North Dakota, Design Engineer, Z014
<br />The State Street Improvement project consisted of adding, extending, and
<br />mod"ng left and right turn lanes, and other existing geometry along the 1.6
<br />mile long road In Bismarck, ND. The project improved traffic flow, reduced
<br />turning movement conflict points, and Improved driver expectancy. The project
<br />included the survey, right of way, utility coordination, drainage studies and
<br />Improvements, and layout and design of the street, sidewalk, and geometry.
<br />Jill TAIT Appendix I Page 8
<br />25E-587
<br />
|