Laserfiche WebLink
PROPOSAL <br />OWCALL ENGINEERING SERVICrs <br />RFP NO.: 17-0113 <br />Cily of Santa Ana <br />WarnerAvenue <br />Weareprovidih design saphoss to the CRY Of Santa Ana for the widening and <br />Wideninfiand <br />Improvement ofcmer Avenue, from Main Street to Oak Street Warner Avenue <br />Improvemoota <br />YAII�bowWor.te.dff.OMM.fOut-tajnetjridivldadarWisitoaslx-4,vo..divWo.dartedatio <br />Project <br />conform to the City and County aftertals master plan. The six -lone arterial Includes <br />aturb separated Class IV bike fame which w4ll serve to oonned two 0 . law I bike <br />&WIlk Ana, CA <br />lehafaC111009, a firstWithth Orange County, <br />The pmject also Includes landscape Improvements end perman nt water quality <br />Imprii4ment features within the parkway areas. A major o6mpo-eent of the project <br />Is the Installation of drainage Infrastructure. The existing elorm drainage system <br />carries a major watershed system within a eff-Inch nainforoW concrete pipe, Our <br />re%iW of the existing and proposed drainage system resulted in volue engineering <br />savings that allowed the system to be downalmd from the proposed 118-1bot by <br />0-foat roinfbivad concrete box to an Winch reinforced concrete pipe, <br />Client Refaftw <br />Sean Thomas, City of $onto Ana <br />Phone: 714.647,5-666120 Civic Cantor Plaza Santa Ana, CA 9270.2 <br />Mark Thornm was selected by SBCAG to complete their segment of the project <br />extending from the Cablito Boulevard Intorcharge'to the Padom Lane Interchange, <br />iniproVam" <br />atotal of 4.6 miles. Our $400 million segment of Me project Includes multiple <br />Project <br />challenging design constraints, which Include madlanland outside widening, <br />reconstruction of two Interchanges with existing 16114ane, exists at Cabrillo <br />sente Barbara, CA <br />Boulevard and Sheffield Drive, replacement of three bridges over creeks In a <br />FEMA-designated ftoodplain and floodway, retaining wells along a sea cliff, sound <br />wallsi end pavement robabilitation,"These imor6�e�ienwfnvolve�ni�dm6Eioohs to <br />the existing highway profile throughout the corridor, This project requires close, and <br />extensive coordination with Caltrans and SBCAG staff. <br />Client Reference: <br />Year Completed: <br />2011w()n-golng <br />Fred Lone, Slants Barbara County Association of Governments <br />Phone; 850,961,8926 1260 North Son Antonio Rd. 15fe B� Santa Barbara, CA 93110 <br />Rosadelq-tilghwety <br />Mark Thomas provided final design services for Wdering approximately 5.6 miles <br />jS11 68) Widening and <br />of SR 58 (Rosedale Highway) from SR 99 to Allen Road. This conventional highway <br />Rehabilitation <br />Is on the National Highway System within City of Bakersfield, County of Kom, and <br />Caltrons District 6 right of way, The project adds one lane In each and a raised <br />Baketsfield. CA <br />median, improved 12 traffic signals and Installed signal Interconnection. The design <br />also. includes a Class 11 bike lane, sidewalks, crosswalks, and ADA ( ;ompliant curb <br />ramps meeting new Oaltrans Standards. <br />A major component of the project Is the rehabilitation of the existing pavement and <br />the new lanes. The pavement in the existing lanes through the entire project was <br />rehabilitated using grind and overlay tachnique, The pavement for the new lanes Is <br />a thicker section In order to withstand the heavy truck foods. <br />Client Reference: <br />Year Completed: <br />Roani Sandoval, City of Bakersfield <br />2017 <br />Phone: 661.326.34331900 Truxtun Avenue, Suite 200, Bakersfield, CA 93301 <br />25E-631 <br />