Laserfiche WebLink
ON -CAL L ENGINEERING SERVICES <br />RrP NO.: 17�083 <br />City of Santa Ana <br />PROPOSAL <br />REFERENCES <br />At Mark Thomas, we are roud of our track record of successfully completing projects on time, within budget, <br />and meeting the needs oplour clients. Below Is a list of our references for whom we have delivered projects <br />similar In scope. We are confident you will find that the highlighted projects demonstrate our ability to deliver <br />the services you are seeking on this upcoming project. <br />Patrick Arclniega, PPE <br />City of Newport Beach <br />Public Works Department <br />100 Civic Center Drive <br />Newport Beach, CA 92658 <br />Phone., 949.644.3311 <br />Bayalde Drive Improvements Project, Newport Beach, CA. <br />Maim I homas Is providing engineering, geometric and trons ortatlon design <br />services to complete this this roadway project that will � � Improve <br />pedestrian safety, bicycle connectivity, and overall vehicular and multimodall <br />operations In the city of Newport Beach. This project Includes four distinct <br />elements; pavement rehabilitation, Improvements to the PCH (SR 1) <br />Intersection which Involves Caltrans approvals, traffic calming elements, <br />and bicycle and pedestrian Improvements. Key services we one providing <br />Include pavement rehabilitation and strategies, complete streets and active <br />transportation planning, Coltrane Approval and Permitting, urban design and <br />landscape/hardscape design. <br />Seen Thomas <br />Warner Avenue Widening and Improvements Project Santa Ana, CA. <br />City of Santa Ana <br />We are providing d Isi n services to the City of Santa Ana for the widening <br />and Improvei amer Avenue, from Main Street to Oak Street. <br />Public Works <br />WernerAvenue will be widened from a four -lane undivided arterial to a six- <br />20 Civic Center Plaza M-36 <br />lane divided arterial to conform to the City and County arterials master plan. <br />Santa Ana, CA 92702 <br />The six -lane arterial Includes a curb so arated Class IV bike lane which will <br />R <br />Phone: 714.647.6666 <br />serve to connect two Class I bike lane allitles, a first within Orange County. <br />A major -component of theproject Is the Installation of drainage � <br />Infrastructure. Our review of the existing and proposed drainage system <br />resulted in value engineering savings that allowed the system to be <br />downsized from the proposed 18-foot by 8-foot reinforced concrete box to <br />an 88-Inch reinforced concrete pipe. The project also Includes landscape <br />and water quality Improvement features. <br />Jose Medina <br />City of Fullerton <br />303 W. Commonwealth Ave. <br />Fullerton, CA 92832 <br />Phone: 714,738.6865 <br />Roani Sandoval <br />City of Bakersfield <br />600 Truxtun Avenue, <br />Suite 200 <br />Bakersfield, CA 93301 <br />Phone: 661.326.3433 <br />25E-632 <br />ur <br />