My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OWCALL ENGINEERING SERVICTS PROPOSAL <br />RFP NO,: IMOS <br />Cily of Santa A118 <br />Task 8-12. Final Design (PUE) <br />preparoluen of Plans: <br />Mark Thomas will prepare 00%, 05% and 100% level design plans specifications and esilmates based on <br />1 <br />( I <br />the approved concept design. The. PUE packages Y411 Include, at mintmorn; <br />Title Street <br />Typical sections <br />street Pilarm <br />Constaotion Details <br />Intersection Grading Plans <br />- Drainage Improvements plans <br />- $ovndwall Plans <br />4 Signing and Striping <br />* Erosion Control Plant <br />o Street Lthling <br />k,, <br />Irrigation land Landscaping <br />Traffic Control & Staging Plans <br />Final cross sections at every 26-faot will be provided at the submittal of the 100% level design plans. <br />Special Provisions: <br />Mark Thomas will prepare specifications using the City's bolferplate and the latest version of the Greenbook. <br />The Specifications will be submitted along with the draft plans to the City at all submittals for approval. Mark <br />Thomas will also prepare any special provisions relating to the design plans, as needed.. <br />Post Estimate - <br />Mark Thomas will prepare (in MS Excel) an Engineer's Estimate of Construction Costs based. on estimated <br />quantities and available construction cost utilizing Caltrans Contract Cost Data, RS Means and/or readily <br />available data from similar past projects. Backup of all quantities and unit cost will be provided prior to <br />construction. Mark Thomas will utilize contingency values based on Industry standards, however, City to <br />agree upon these values, <br />Task 6. Design Concept Plan <br />Immediately after the kick-off meeting and review of any existing date files, Mark Thomas will continue the <br />GeometricDoslon Refinement of the project, The plans will Include horizontal and vertical design and design <br />calculations for the roadway realignment. <br />A draft Engineer's Estimate of Construction Cost will be prepared at this level to begin the value engineering <br />analysia.The City will review the Concept Design Plan and after resolution of any geometric design <br />comments, the PUE can be started. <br />Task 9, 60% PS&E <br />Mark Thomas will prepare the 60% plans once the geometric design has been approved. Estimate of Cost <br />will be updated and the first draft of the technical specification will be prepared. The draft Drainage Report <br />and the draft GeotechnIcal Report will be submitted for review. <br />arg=s" n <br />25E-636 <br />
The URL can be used to link to this page
Your browser does not support the video tag.