My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL ON -CALL. ENGINEERING SERVIC' <br />ES LAI <br />RFP NO.: 17-003 <br />City of Santa Ana <br />Task 10. 95% PS&E <br />Mork Thomas Wilt update the PS&E for b5l/o.complotlon after Ck review comments are resolved. <br />In addition to the 950A PS&E, the. Gootechrileall Report and Drainage Report will be re-submi1ted for approval. <br />Task 11. 1000% PS&E <br />After 96% review oommont resolution, Mark Thomas will updat# the PS&E fbr 100% submittal and prepare <br />the final cross sections, <br />Task 112. Final ME <br />After approval of the IGO% PS&E, Mark Thomas will submit the appropriate number of hard copies and <br />islootronic copies of the Construction Documents per RI7P requirements. <br />Tasks 8-12 0affiferables. <br />* Plans (30%, GOO/o, 04%,1006A and Final) <br />* $PacA0afion* (00%, PSY9, I OOQA and Final) <br />* Esfirhats tofConftotloh Cost (30%, 60%, 95%,JOOVq and Finao <br />, GeneralCr6seseetions(1001YO) <br />Task 13. SidSupport <br />Mork Thomas will provide services during the bid phase of the project by rOvIewing and responding to <br />Request for Clariflostlons and Issuing Addenda to the bid package, as nwAssary; to facilitate construction, <br />Additional addenda not Included In the original project scope will be considered extra work, <br />Task 13 Defiverables, <br />- Responses to Bid RFI's and necesseryAddende <br />Task 14. Construction Support <br />Mork Thomas will provide assistance to the City during the construction phase of this project, This Includes: <br />attending meatings, answering RFI's, reviewing submittals, reviewing shop drawings, field observations, <br />Interpretation of bid documents, and clarifications. Mork Thomas will also 08918t the City In reviewing <br />Construcition Change, Orders and changes In field conditions. <br />Task 14 DefiVerables: <br />Response to Construction RFI's (40 maximum) <br />Review of SubmIttals (20 maximum) <br />Task 16. As-builts <br />Upon completion of construction and during project closeouL, Mark Thomas will prepare record drawings from <br />a redlined set (provided by the City) documenting revisions to the final conformed bid set for City records. <br />Task 15 Doliverables: <br />* As -built Record Drawings <br />25E-637 <br />
The URL can be used to link to this page
Your browser does not support the video tag.