My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OWCALL ENGINEERING SERVICES kL 4 <br />RFP NO.* 117-083 <br />CityofSantakfa <br />KEY STAFF RESUMES <br />ARTURO VIVAR, PC <br />Arturo bd rs of experience delivering t ft Maas_ , t <br />ngs Moro than 1.6 yea nnsportaflon deslo p within Southern <br />0011fornig. Re 60-4 oxtensivesixpodeneb pmvldfng civil and transportation dWgn for roadwaywidenings, <br />Intersection Modifications pavement r6habilltation, and multimodal enhancements. Arturo 16 a) to danced <br />"holnestino projects for public agencies; His projeot& have I valved roadway <br />in transportation and civil e n <br />wkieffings, highway Interchange Improvements, street rehabilitation and,drai6doe Improvements,, In <br />seoordan6e to the Coltrane HDM, AASHT0, and local agency requirements. <br />REPRESENTATIVE PROJEOTS <br />PROJEOT ROLE <br />Noo Wolter <br />SOUCATION <br />99 <br />Uovi�lty �F lle0n <br />�A G700V <br />. . BAYSIDE DRIVE <br />transportation design services to ( <br />girestly Improve pedestrian safety, <br />and rhultimodal.operstions.-Kay.if <br />parmiftIng,pavement rehabilitatloi <br />Improvements. <br />NEWPORT BEAGH. CA <br />[to provide etigineeft geomAtrid and <br />mplete ft this fogdwdy proje'at that will <br />Icycle connectivity, and OV660 vehicular <br />vices include CalfterIS approval and <br />complete streatsturban design, and bikelped <br />M ITIPL PAV M AS TA ON FULLERTON <br />M T'o S6'o0rvI for <br />m W rovId on 0o" civil oni;;'neerl ih� <br />8�0 n 0 0 way pavomont dosigo, d Ineoe <br />_ p Ing <br />F Soon Se ciud r ad <br />drain arld sanitary newer Systems' storm Water manage tpre <br />Mer misc ellairteous OVII engineering and maintenance rk'Th <br />ers are ourrently in progress or recently completed a d we re <br />the sample projects to be.complated as part of the on�oall contract: Chapman <br />Avafiuo,.Yqrb@ Linda Boulevard Pavement Rehabilitation, Commonwealth <br />Avenue Reconstruction Prqj4ct,'BsrkeI6y/wanue Pivemerit Rehabilitation,, and <br />Sunny Crest Drive Reconstruction Project. <br />WARNER AVENUE WIDENING AND IMPROVEMENTS, SANTA ANA, CA <br />Prot'"ne9or 'or 00 fins' P88E to widen over ', 0' 11noariest o'*sme' <br />Avenue from M it Th 0 vorts the roadway from a <br />a M I nt. "d 00 n to to th <br />name 0 0 8 0 " <br />as a Me ad conform OCIWA <br />0 6 "aarizerto a n curb W led Type <br />I a ad a 0 k 'e <br />four [on und d d ert Ito Ix <br />Co nty arterials t rpl n. Th ix I <br />els gas. <br />IV u Ike a ewhi = esery to n t 1w U <br />b I n ch 0 con 60 0 Type blk no Isoill <br />SR 68 (ROSEDALE HIGHWAY) WIDENING AND IMPROVEMENTS <br />PROJECT, BAKERSFIELD, CA <br />Preject manager responsible for Internal and external technical dsalgn <br />coordination and the roadway design engineer of record for widening <br />approximately 6,15 miles of SR 68/Rosedale Highway from SR 99 to Allen Road. <br />The project adds one lane in each direction, rnedlan Improvements, and turn <br />lanes at specific Intersections. <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Project support forthe the preliminary design services to evaluate goometrica <br />for $300M, 4.6-mila HOV widening and pavement rehabilitation projects. The <br />project Involves the preparation of 35% "Dectslon-Point Documents" for highway <br />and interchange Improvements along US 101 from CAbrillo Boulevard to. Padaro <br />Lane. Project elements include reconstruction of two Interchanges with left -lane <br />off -ramps, replacement of three bridges of FEMA-regulated creeks, retaining <br />walls along the sea cliff, sound walls, and pavement rehabilitation. <br />I� 1`0 " <br />221 M0,107" <br />25E-644 <br />
The URL can be used to link to this page
Your browser does not support the video tag.