Laserfiche WebLink
LA ON -CALL ENGINEERING SERVICES <br />PROPOSAL <br />RFP NO.: ir-083 <br />City of Sahta Ana <br />ROB HIM�S, PE <br />R.6b hog More than 3-1 years of experience In Municipal and tranrapdristlory ang.1doorinig. He has wodW with <br />municipalities, soonalea and 0albAhs to plan ' and design highway, roa&ayj bridgo,and0flilly friliestruchur& <br />Improvements. Rob 19 a Principal of the firm and speclallibi In Oil aspeots Of transportation p ots ranging <br />ilrorn WsIbIlIty, studies to Onal PS&E, He has a detailed COW ZSCHTO 'Groan <br />understanding ofthe - <br />BOok% ORCI other applicable design guidelines and criteria. His focus Is On client servics, ensuring the delivery <br />0 <br />of 4couiOtework that serves our offe0svols, while working within budOet-anO targeted schodui, <br />0 <br />REPRESENTATIVE PROJECTS <br />'ORMCT ' #O�e <br />, ' <br />PrImplikCha T 131EAC A <br />,fl SAYSIDEDRIVE IMPROVEMENTS PROJECT, NEWPOR H, 0 <br />0 <br />0-, PrIndpal In charge for this in1proverneht project In, NOwport Beach, <br />Asobdate-Inphorge' Mark <br />Thomas Is providing engineering, geometric and trOnsportotion".doolon serviods <br />EDUCATION to complete this. this roadway projed that will greatly Improve pedestrian solety, <br />911; In civil bicycle connedtiviW, and o%iorall vehicular and multimodal opiefationts. Key <br />112'Inesting,, services Include Coltrane approval and p6imiltting; pk�� rehabilitation, <br />2-braity.of <br />complete- streeWurban dosign,. and bikelpod Improvements. <br />�iwmls, Berkeley - - <br />A E N A8' NS,.FULLERTON, CA <br />ULT'PLE P V M� T R� <br />Th 'ca" civ <br />ark ld 0 earing services for the City of <br />0 moo I prov <br />0 <br />FM If d aaadwoy <br />U soon 8M Ino nt doslgn� drainage studyi Gtorm <br />0 n and so I am I <br />n ter management practices and <br />omo� 6 <br />o r Is Ilan Ml n9in dn <br />the M el To affitenanesworki The4ollowing task <br />411 <br />orders a a ou ran ly in a r M I I and are representative of <br />the 8Z is projects to ba comple of the on�=Ilvorbact: Chapman <br />v u Yorho BouWar pay <br />Awe Linda d ohemiltation, Commonwealth <br />onus Reconstruction Project, Berkeley Avenue Pavement Rehabilitation. and <br />Sunny Crest Drive Reconstruction Project <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />f <br />Principal In chargelproject manager responsible for overseeing the preliminary <br />1 <br />design services to evaluate geometries for the S300M, 4.5-mlle HOV widening <br />and pavement rehabilitation projects."rho prolact Involves the pr6parollion of <br />35% 5Declslon-Point Documents"fier highi6i and Interchange Improvements <br />'10 <br />along US 101 from Cabrillo Boulevard to Padaro Lane. Project elements Include <br />reconstruction of two Interchanges with left -lane oft -ramps, replacement of three <br />J <br />bridges of FEMA-regulated creeks, retaining wells along the sea cgffi sound <br />wells, and pavement rehabliltaflon., <br />SR 68 (ROSEDALE HIGHWAY) WIDENING AND IMPROVEMENTS <br />PROJECT, BAKERSFIELD, CA <br />Principal In charge for final design services for widening approximatolyB.6 <br />miles of SR 581ROsedale Highway from SR 99 to Allen Road. The project will <br />add one lane In each direction, medlon Improvements, and turn lanes at some <br />Intersections. <br />I-S/KATELLA AVENUE UNDERCROSSINGvANAHEIM, CA <br />Principal In charge responsible for development and submittal of project <br />approval document, geometric alternatives and final design (with mandatory/ <br />advisory design exception approval), and contract documents. Project includes <br />utility Investigation, Identification and coordination with utility owners for facility <br />relocation designs and review of traffic analysis, environmental, and water <br />quality documents. <br />25E-645 <br />