Laserfiche WebLink
PROPOSAL <br />ON -CALL ENGINEERING SERVICES f <br />Rr-P NO.: 17-083 <br />CRY of Santa An& <br />JARED UNDO <br />Jared has -more than 7. years of experience in municipal and trartspotistion engineering. Over the coursoof <br />his'09reavat Mark Thonoss, he has been Involved In the utility eciordl6ation and utility rhappirIg, preparation of <br />tromoontrol plans, light of way acquisition, pmJoidt design, striping, and preparation of plans, pr9jed reports <br />an d estimates f b r a: vartsty.of Otojeota for- public Agencies f4rotighobt Ca 11fornis. <br />REPRESENTATIVE PROJECTS <br />- ----- ----- ---- <br />PRO400T ROLE <br />Coordifiallofi SR.50 (ROSEDALE HIGHWAY) W1115NINWIMPROVeMEIS11% <br />AAKEA&IIELIJ. CA <br />EDUCATION <br />isi dvil - <br />9 tnW' <br />04lversity, rmitte <br />for project <br />requiring exten" coordination. <br />crosses lWoboundary lines and Is coordinated with three I <br />Improvements Include an ADA corridor, widened roadway, <br />new curb� gutter, and sidewalk. <br />M1 <br />Design 1support Por the final P56E to Widen over 1,M0 linear fast of, Warner <br />Avenue from Maki �wftt to oak strost. The project coriVorb; the ro from <br />a four lane undivided artert del to a. ::Mcyu <br />01 to *.a sIX-Isne divided arts n to Ky and <br />County arteri* Matter plan. The arterial. Includes curb seipiathted Type IV bike <br />lane Which 01i serve to cohrieottwd Type I bike lane facilities. Respoftibilitles <br />Include development of cftg section Aternatives, roadway design, and <br />drainage Improvements. <br />t440 UTILITY RELOCATION STUDY, LOS 4NOELES COUNTY, CA <br />Design engineer reWonsible-for preparation of a utility relocation study along <br />the central segment of the 1-710 Corridor, between the 1405 Interchange and <br />the LosAngelles River. The project requires extensive coordination with utuay� <br />companies an! other agencies as utility relooefflon would Impact underground <br />major gas. oil, Saw% communloat][on, and watef lines, and the relocatkin of <br />Southern CalWomia tdison's 220-kv transmission corridor and.66-kv lines. <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Project engineer ibr this $300M, 4Z-Mlle HOV Widening and pavement <br />rehabilitation project. Project elements Include reconstruction of two <br />Interchanges with left -lane oMramps, pavement rehabilitation, replacement of <br />three bridges of FEMA-regulated creeks, retaining walls along. the sea cW, and <br />sound walfL <br />BROADWAY r>TREETSCAPE IMPROVEMENTS, FRESNO, CA <br />Design engineer responsible for plan preparation and da4lgri. Project design <br />Includes grading, drainage, utility mapping, and bulb -out design, The purpose <br />of the p6ject was to create a pedestrian friendly corridor, beautification of <br />community and revitalization of downtown. <br />25E-648 <br />