Laserfiche WebLink
ON -CALL ENGINEERING SERVICES <br />PROPOSAL <br />RFP NO�: 17-083 <br />City of SantF Ana <br />KEN DOTY, PE, QSD <br />Ken has more than 30 years of experience In municipal and transportation engineering with Mark Thomas. He <br />Is experienced In all aspects of the preparation of PS&E specializing in transportation improvement projects for <br />public agencies, Including Cities, Counties, and Caltrans facilities. He is experienced in the preparation of the <br />hydrology and hydraulic reports, and. has led the design of drainage, storm drain Improvements, temporary <br />drainage and water line during construction, and water and sewer relocations for a variety of projects Including <br />complete streets, roadway rehabilitations, highwayfinterchange widenings and Improvements, and grade <br />separations. <br />REPRESENTATIVE PROJECTS <br />PROJECT ROLE <br />Drainage/Hydraulics US 101 NOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Load Project engineering support for the $300M, 4.&ml1e NOV widening and <br />pavement rehabilitation projects. Project elements include reconstruction of two <br />EDUCATION interchanges with left -lane off -ramps, replacement of three bridges of FEMA- <br />US in Civil regulated creeks, retaining wails along the sea cliff, sound walls, and pavement <br />Engineering, Oregon rehabilitation. <br />State University YORBA LINDA BOULEVARD PAVEMENT REHABILITATION PROJECT <br />REGISTRATION PS&E,FULLERTON,CA <br />CA C47228 Project manager responsible for preparing geotechnical report and final design <br />QSD 47228 plans, specification and estimate for the reconstruction of Yorba Linda Boulevard <br />from Placentia Avenue to Bradford Avenue. The project Is approximately 2,60D <br />feet In length and will Include the reconstruction of curb, gutter, sidewalk, cross <br />gutters and various curb ramps to meet current ADA standards. <br />NORTH BERKELEY AVENUE PAVEMENT RECONSTRUCTION AND <br />REHABILITATION, FULLERTON, CA <br />Project manager responsible for preparing geolachnical report and final design <br />plans, specification and estimate for the reconstructlowof North* Berkeley <br />Avenue behveen Harbor Boulevard and Valley View Drive, The project is <br />approximately 1,530 feet In length and vAll Include the reconstruction of curb, <br />gutter, sidewalk, cross gutters and various curb ramps to meet current ADA <br />standards. <br />STATE COLLEGE BOULEVARD RAILROAD GRADE SEPARATION <br />PROJECT, FULLERTON, CA <br />Project manager responsi ' ble for storm drainage, sanitary sewer and water <br />phases, and construction support services for this grade separation project. The <br />sanitary sewer plans were split Into the City of Fullerton sewer and the Orange <br />County Sanitation District sewer lines. The water line belonged to the City of <br />Fullerton. The project includes a railroad bridge, special design retaining walls, <br />pump station, signal and lighting modifications, parking lot site improvements, <br />water and sewer relocations, utility coordination, and survey and right of way <br />support. <br />SR 4061SR 606 NOV CONNECTOR, ORANGE COUNTY, CA <br />Project manager responsible for drainage, quality control, and utilities for this <br />$102M project to add HOV connectors. Design tasks Include the development of <br />typical cross sections and design and layout of the temporary drainage systems <br />for each construction stage, and evaluation of utility protection and relocations, <br />Project responsibilities also Included the detailed review of the soundwall <br />design for all the project soundwalls, as well as review of the stage construction <br />Including the development of 100 cross sections. <br />0 <br />25E-647 <br />