Laserfiche WebLink
r <br />City of Santa Ana <br />L <br />Tyrone Peter, PE <br />Project Manager <br />Proffla Summary <br />Education: BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering <br />Civil Engineering, Murugappe Polytechnic <br />Registration: Civil Engineer, California No. 81888 <br />Affiliations, American Public Works Association <br />American Society of Civil Engineers <br />Experience: 11 Years <br />Mr. Tyrone Peter Is an accomplished civil engineer for multi -discipline and muld-agenry Infrastructure pro - <br />)sots and Is known for providing Innovative, quality engineering services to ensure project delivery within <br />budget and schedule. As the project manager for the City's On Call Engineering Services project, with quali- <br />fied staff and resources, he will be responsible for successful project delivery. <br />Mr. Peters 11 plus years of experience managing and designing all types of public works projects provide a <br />solid foundation to understand what Is needed to deliver a successful project and make him the perfect fit <br />for overseeing the entire project as well as specific civil engineering tasks His comprehensive experience <br />includes design of state highway, new street, street widening, street realignment, avoment rehabilitation, <br />lacts. <br />light rail and railroad, grade separation, flood control facility, water, and sewer pr Mr. Peter has super- <br />Ased feasibility study, project study report, project report, construction document preparation as well as <br />grade certification issuance, construction administration, and construction Inspection. <br />Relevant Project Experience <br />IF <br />Emerald Say Mgdn Gate Safety Improvements, Emerald Say Service District, Laguna Beach, Calffor- <br />111 <br />necessary reports, plans, specifications, and estimates documentation, Performance of these responsibill- <br />ties required expertise and knowledge In street, traffic, drainage, structural, and pavement design, ADA <br />standards, public outreach, pedestrian safety, and water quality. Wilidan provided divil and traffic engineer- <br />Ing design and other appurtenarrt services for safety Improvements at the main gate entrance. Improve- <br />ments Involved road widening, guardhouse relocation and reconstruction; grading to accommodate the <br />V.J <br />roadway widening and landscaping; Installing upgraded lighting, ADA-compliant curbis and ramps, and re- <br />taining and monument walls; widening the right -turn pocket Lind Installing a median; and Installing street <br />r-h <br />striping and sIgnage Within Caltrans' right-of-way. <br />. <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Project Manager responsi- <br />ble for overall project management and oversight required for the corridor Improvements from Alameda <br />Street to Hunt Avenue. Performance of these responsibilities required expertise and knowledge In street <br />L <br />and pavement design, ADA standards, public outreach, environmental documentation, Green Street design, <br />and watershed management planning. The Improvements Involved Increasing traffic capacity by reconfigur- <br />'.1 <br />Ing the roadway from four to six lanes; pavement rehabilitation; landscape and hardscape medians, median <br />k-0 <br />lighting; sidewalk, curb and gutter, and ddvoway approach reconstructon; ADA-oompliant ramps; parkway <br />trees; artistic elements, corridor entrance monument; bus shelter end bus turnouts; and trafflosignal modifi- <br />cations, Services provided Included civil, traffic, pavement, and drainage engineering; landscape arohltoc- <br />L <br />ture, survey and right-of-way engineering; and utility relocation, <br />Orange Line Extensiont Brutoco Engineering & Construction, lrkcJLos Angeles County Metropolitan <br />Transportation Authority, Los Angeles, California. Civil Engineering Task Leader responsible for provid- <br />ing and overseeing all civil Improvement design required for the design/build of the MOL extension from the <br />Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Performance of <br />f� <br />these responsibilities required expertise and knowledge In Intersection design, bike lanes, ADA standards, <br />street geometric design, light -rail standards, parking lot and roadside safety design, WllIdan prepared plans, <br />speolf loations, and estimate for street widening, raised landscaped medians, irrigation system, ADA access <br />curb ramps, bicycle paths, park -and -ride and parking lot facilities, traffic signal modifications, communica- <br />tIon conduits, and signing and striping. Three stations were constructed or reconstructed. <br />Proposal for On -Call Engineering <br />IrcomprehensIve. Innovative Vusted. WIP No. 17-088 <br />25E-720 <br />