<br />Los Alamitos Boulevard Median improvements, City of Los Alamitos, California. Project Manager ro�
<br />sponsible for overall project management and oversight required for the improvements between Cerritos
<br />Avenue and Katella Avenue. Performance of these responsibilities required expertise and knowledge In
<br />street Improvement, pavement rehabilitation, public outreach, signing and striping, street lights, and planting
<br />and Irrigaflon. Improvements Involved raised median, pavement delineation, landscape and Irrigation Im.
<br />provements, street lighting and traffic signal Improvements at Intersections with
<br />Florists Street and Sausalito Street. There was minor traffic signal modification at Intersections with Katella
<br />Avenue and Cerritos Avenue.
<br />Placentia MetroUnk Station Phase I and 11, Orange County Transportation Authority, Orange County,
<br />California. Project Manager responsible for providing and overseeing all civil Improvement design required
<br />for IN restructure Improvements for the now station. The project site Involved approAmately 4,75 acres to
<br />provide a MetroUnk commuter rail station that meeft current and Ours transit demand and ADA require.
<br />ments. The project goal fostered train ridership growth In the region. The station was planned as part of a
<br />key component of transit-orlented development envisioned In the Westgate Specific Plan for the City of Pla-
<br />contia. The project Improvements Included street, railroad track, and pedestrian Improvements; rail plat.
<br />forms; and lighting, signing and striping of four parking facilities for 425 vehicles.
<br />Downs Street Widening, City of Ridgecrest, California. Civil Engineering Task Leader responsible for
<br />providing and overseeing all civil improvement design required for the widening Improvements, Perfor-
<br />mance of these responsibilities required expertise and knowledge In alternative pavement design, bone-
<br />ftl/oost analysis, right-of-way engineering, street design, and utility coordination. The project Includes onvi-
<br />rorimental ournpliance, rIght-of-way research, and design. The project limits are Upjohn Avenue and Ridge.
<br />crest Boulevard. Improvements Include street widening and new curb, gutter, curb ramps, and sidewalks.
<br />The preliminary engineering services Include utility research, rIght-of-way research, field Investigations, solls
<br />testing, and ground survey.
<br />Street Improvements Phase 11, City of Las Mamitos, California. Project Manager responsible for overall
<br />project management and oversight required for resurfacing of the following projects In the Phase 11 city-wide
<br />program:
<br />• Via El Mercado Street Improvements
<br />• Old Town West Improvements (Chestnut Street, Walnut Street, Florists Street)
<br />• Commercial Street Improvements (Cordtos Avenue, Sall Road, Reagan Street, Humboldt Street, Portal
<br />Drive, Winners Circle, Los Alamitos Boulevard, Los Vaqueros Circle)
<br />Performance of these responsibilities required expertise and knowledge In pavement rehabilitation strate-
<br />gies, ADA standards, and signing and striping. Wilidan conducted alto reconnaissance to observe the pave-
<br />ment condition, conducted coring, testing and englneoring analysis and summarized the findings In a ge-
<br />otechnicall report. Per the recommendation, the CIty streets within the project limits were ground and resur-
<br />faced with 2-Inch thick asphalt -rubber hot mix or removed and replaced with asphalt concrete over aggre-
<br />gate bass or with joint plain cement concrete, All manhole, water valve, anode, and monitoring wall covers
<br />within the project limits were adjusted to grade, Curbs and driveways were protected In place. Sidewalks
<br />were Improved and ramps were Improved to current ADA requirements,
<br />WECornpr4hensive. Innovative. Trostad.
<br />Proposal for On-Oall linginoorIng,
<br />RFP No. 17.083