|
City of Santa Ana
<br />Mohsen Rahimlan, PIE, QE
<br />Material Yeating Engineer
<br />Profile Summmy
<br />Education, MS, Civil Engineering, Tehran University, Tehran
<br />Registration: Civil Engineer, Callilornia, No. 73390
<br />GeotechnIcall EnUlnear, California, No. 3059
<br />Experience., 29 Years
<br />Mr� Mohssn Rehimilan possesses expertise In geotachnioal and material engineering, testing, Investig&
<br />flon, design, and construction and has lent that expertise to a wide spectrum of public works projects. W.
<br />Rahlmlan has substantial experience In conducting and managing geotechnical and material testing and
<br />Inspection services during construction. He has performed diversified gootechnIcal assignments, Including
<br />pavement design, shallow and deep foundation design, settlement evaluations, liquefaction studies, and
<br />slope stability analyses. Mr. Rahimian experience Includes gooteohnical, civil, and structural design and
<br />construotion management.
<br />Relevant Project Experience
<br />Emerald Say Main Gate Safety Improvements, Emerald Say Service District, Laguna Beach, Callfor-
<br />nle. GoollaahnIcall Engineer responsible for quality assurance materials testing. Wiliden provided civil and
<br />traffic engineering design and other appurtenant services for safety Improvements at the main gate en-
<br />trance. Improvements involved road widening, guardhouse relocation and reconstruction; grading to accom-
<br />models the roadway widening and landscaping,, installing upgraded lighting, ADA-compliant curbs and
<br />ramps, and retaining and monument walls; widening the right -turn pocket and Installing a median; and In-
<br />stallind street striping and signage within Caftrans� right-of-way.
<br />Placentia MetroUnk Station Phase I and 11, Orange County Transportation Authority, Orange County,
<br />California. Geotechnical Engineer responsible for quality assurance materials testing required for Infra-
<br />structure Improvements for the now station. The project site Involved approximately 4.75 acres to provide a
<br />MetroUnk commuter rail station that meets current and future transit demand and ADA requirements. The
<br />project goal fostered train ridership growth In the region, The station was planned as part of a key compo-
<br />nent of transIt-orlented development envisioned In the Westgate Specific Plan for the City of Placentia. The
<br />project Improvements Included street, railroad track and pedestrian Improvements-, rail platforms; and light-
<br />Ing, signing and striping of four parking facilities for 426 vehicles.
<br />Orange Line Extension, Brutoco Engineering & Construction, InoJLoa Angeles County Metropolitan
<br />Transportation Authority, Los Angeles, Callfornlia. Geotechnicall Engineer responsible for quality assur-
<br />ance materials testing required for the design/build of the MOL extension f rom the Chatsworth Station to
<br />Canoga Station In the San Fernando Valley along Canoga Avenue, Willdan prepared plans, specifications,
<br />and estimate for street widening, raised landscaped medians, Irrigation system, ADA access curb ramps,
<br />bicycle paths, park -and -ride and parking lot facilities, traffic signal modifications, communication conduits,
<br />and signing and strIpIng.
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Geotechrlical Engineer
<br />responsible for quality assurance materials testing required for the corridor Improvements from Alameda
<br />Street to Hunt Avenue. The Improvements involved roadway widening from four to six lanes; pavement re.
<br />habilitation; landsoaps and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway
<br />approach reconstruction; ADA-compliant ramps, parkway trees; ardstic elements, Corridor entrance monu-
<br />ment; bus shelter and bus turnouts-, and traffic signal modifications, Services provided Included civil, traffic,
<br />pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and dl�
<br />Ity relocation.
<br />Comprehensive, InnovetWo. Trusted.
<br />Proposal for On -Call Enoneoring,
<br />AFMAT-083
<br />25E-723
<br />
|