Laserfiche WebLink
City of Santm[Ana <br />David Knell, PLS <br />survey and RIght-of-Way Engineering Task Leader <br />Profile Summary <br />Education: 88, Cartography, Boston University, Boston <br />Civil Engineering and Land Surveying Classes, Callfornla State University, Long Beach <br />Registration: Land Surveyor, California No. 6301 <br />Affiliations: California Land Surveyors Association <br />Southern California Experts & Consultants <br />Experience., 41 Years <br />Mr. David Knoll has been Involved In preparing and checking numerous parcel maps and tract maps, ALTA <br />p <br />surveys, rocords-of-survey, lot line adjustments, parcel map waivers, certificates of compliance. and bound- <br />ary determination. He [a responsible for preparing legal descriptions and sketches for a wide range of ease- <br />monts Involving utilities, air space reservations, and construction projects. Mr. Knoll works with major utill- <br />L <br />ties and title companies in determining easements and correcting defective legal dosorlption& HIS expert - <br />once includes supervising field crews, overseeing an office staff dealing with various survey projects, and <br />extensive experience with fowl, state, and federal agencies. <br />Relevant Project Experience <br />Emerald Say Main Gate Safety Improvements, Emerald Say Service District, Laguna Beach, Califor- <br />nia, Survey and Right -of -Way Engineering Task Leader responsible for oversight of all office and field sur- <br />voy services and preparing necessary right-of-way engineering dooumentation. Wfildan provided civil and <br />traffic engineering design and other appurtenant services for safety Improvements at the main gate on - <br />trance. Improvements Involved -road -,widening, guardhouse relocation and reconstruction; grading to accont- <br />-modaWtlioj-o�&Wuktaning��ridscaping,JnstaWn"pgmde&llghting,ADAtpwtuptia nd <br />ramps, and retaining and monument walls, widening the right -turn pocket and Installing a median; and In- <br />r! <br />stalling street striping and signage within CaltrarW right-of-way. <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Survey Task Leader re- <br />sponsible for providing and overseeing all mapping and right-of-way engineering required for the corridor <br />Improvements from Alameda Street to Hunt Avenue. The Improvements Involved roadway widening from <br />four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, <br />curb and gutter and driveway approach reconstruction; ADA-00mpliant ramps; parkway trew artistic, We- <br />ments, vorrldor'�ntrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services <br />. L.J . <br />provided Included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and <br />right-of-way engineering; and utility relocation. <br />Orange Line Extension, Brutoco Engineering & Construction, IncJLos Angeles County Metropolitan <br />I. <br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and <br />overseeing all mapping and right-of-way engineering required for the design/build of the MOL extension <br />­9 ? <br />from the Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Willdan <br />�11 <br />prepared plans, specifications, and estimate for street widening, raised landscaped medians; Irrigation sys- <br />tem, ADA access curb ramps, bicycle paths, park-and-dde and parking lot facilities, traffic signal modifica- <br />tions, communication conduits, and signing and striping. <br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Survey Task Leader <br />responsible for providing and overseeing all mapping and right-of-way engineering required for the Improve. <br />1-1 <br />ments between Cerritos Avenue and Katella Avenue. Improvements Involved raised median, pavement do- <br />'d <br />lineatlon, landscape and Irrigation Improvements, street lighting and traffic signal Improvements at Interseo- <br />tions with Florists Street and Sausalito Street. There was also minor traffic signal modification at lntsrsao� <br />Wns with Katella Avenue and Carrilos Avenue. <br />Wcomprehenslye. ItinovatNe. 1histed, <br />6J <br />Proposal for On -Call trigineering, 14� <br />RPP No. 17-083 :44 <br />25E-722 <br />