|
City of Santm[Ana
<br />David Knell, PLS
<br />survey and RIght-of-Way Engineering Task Leader
<br />Profile Summary
<br />Education: 88, Cartography, Boston University, Boston
<br />Civil Engineering and Land Surveying Classes, Callfornla State University, Long Beach
<br />Registration: Land Surveyor, California No. 6301
<br />Affiliations: California Land Surveyors Association
<br />Southern California Experts & Consultants
<br />Experience., 41 Years
<br />Mr. David Knoll has been Involved In preparing and checking numerous parcel maps and tract maps, ALTA
<br />p
<br />surveys, rocords-of-survey, lot line adjustments, parcel map waivers, certificates of compliance. and bound-
<br />ary determination. He [a responsible for preparing legal descriptions and sketches for a wide range of ease-
<br />monts Involving utilities, air space reservations, and construction projects. Mr. Knoll works with major utill-
<br />L
<br />ties and title companies in determining easements and correcting defective legal dosorlption& HIS expert -
<br />once includes supervising field crews, overseeing an office staff dealing with various survey projects, and
<br />extensive experience with fowl, state, and federal agencies.
<br />Relevant Project Experience
<br />Emerald Say Main Gate Safety Improvements, Emerald Say Service District, Laguna Beach, Califor-
<br />nia, Survey and Right -of -Way Engineering Task Leader responsible for oversight of all office and field sur-
<br />voy services and preparing necessary right-of-way engineering dooumentation. Wfildan provided civil and
<br />traffic engineering design and other appurtenant services for safety Improvements at the main gate on -
<br />trance. Improvements Involved -road -,widening, guardhouse relocation and reconstruction; grading to accont-
<br />-modaWtlioj-o�&Wuktaning��ridscaping,JnstaWn"pgmde&llghting,ADAtpwtuptia nd
<br />ramps, and retaining and monument walls, widening the right -turn pocket and Installing a median; and In-
<br />r!
<br />stalling street striping and signage within CaltrarW right-of-way.
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Survey Task Leader re-
<br />sponsible for providing and overseeing all mapping and right-of-way engineering required for the corridor
<br />Improvements from Alameda Street to Hunt Avenue. The Improvements Involved roadway widening from
<br />four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk,
<br />curb and gutter and driveway approach reconstruction; ADA-00mpliant ramps; parkway trew artistic, We-
<br />ments, vorrldor'�ntrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services
<br />. L.J .
<br />provided Included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and
<br />right-of-way engineering; and utility relocation.
<br />Orange Line Extension, Brutoco Engineering & Construction, IncJLos Angeles County Metropolitan
<br />I.
<br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and
<br />overseeing all mapping and right-of-way engineering required for the design/build of the MOL extension
<br />9 ?
<br />from the Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Willdan
<br />�11
<br />prepared plans, specifications, and estimate for street widening, raised landscaped medians; Irrigation sys-
<br />tem, ADA access curb ramps, bicycle paths, park-and-dde and parking lot facilities, traffic signal modifica-
<br />tions, communication conduits, and signing and striping.
<br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Survey Task Leader
<br />responsible for providing and overseeing all mapping and right-of-way engineering required for the Improve.
<br />1-1
<br />ments between Cerritos Avenue and Katella Avenue. Improvements Involved raised median, pavement do-
<br />'d
<br />lineatlon, landscape and Irrigation Improvements, street lighting and traffic signal Improvements at Interseo-
<br />tions with Florists Street and Sausalito Street. There was also minor traffic signal modification at lntsrsao�
<br />Wns with Katella Avenue and Carrilos Avenue.
<br />Wcomprehenslye. ItinovatNe. 1histed,
<br />6J
<br />Proposal for On -Call trigineering, 14�
<br />RPP No. 17-083 :44
<br />25E-722
<br />
|