My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ann <br />Gary Gordon, PE <br />Structural Engineering Task Leader <br />Profile Summary <br />Education: SS, Civil Engineering, California State University, Chloo <br />Registration. CMI Engineer, California No. 42178 <br />Affiliations: American Public Works Association <br />American Society of Civil Engineers <br />American Concrete Institute <br />Experience: 32 Years <br />Mr. Gary Gordon has,32 years of comprehensive experience, including project management, design, and <br />construction management of bridge, roadway, traffic signal, waterline, sewer, drainage, and airport projects, <br />In 2016, Mr. Gordon was placed In charge of Wilklar? bddge and structural engineering team. With this now <br />assignment, he now oversees projects such as Marlposa County's rehabliltatlon/roplacament of live bridges <br />that Is currently In the prefirninary engineering phase. <br />Mr. Gordon's career Includes serving as a staff member of the Shasta County Department of Public Works, <br />Coltrane Division of Structures, and the City of Redding's Department of Public Wod(s performing detailed <br />and complex design, construction management and division management and supervision. Throughout his <br />career, Mr. Gordon's focus has been on the delivery of road and bridge projects and the various appurte- <br />nances associated with them. <br />Mr. Gordon has dealt with complex environmental compliance Issues Involving CEQA and NEPA as well as <br />developed considerable experience with resource agency permitting Issues. The experience and Insight <br />gained from working directly with these agencies have proven Invaluable In understanding and appreciating <br />the varying needs of the different types of agencies that Willdlan serves and developing the best solutions <br />for those needs. <br />Relevant Project Experience <br />Emerald Say Main Gate Safety Improvements, Emerald Say Service District, Laguna Beach, Califor. <br />nia. -Structural Engineering Task Leader responsible for responding to structural requests for Information <br />during construction and redesigning various structural elements to accommodate utility lines discovered <br />during construction. Performance of these responsibilities requires expertise and knowledge In various <br />structural building codes such as AGI, AASHT0, and OBC as well as construction practices and principles. <br />Wilidan provided civil and traffic engineering design and other appurtenant services for safety Improvements <br />at the main gate entrance. Improvements Involved road widening, guardhouse relocation and raconstruc- <br />tion, grading to accommodate the roadway widening and landscaping; Installing upgraded lighting, ADA- <br />compliant curbs and ramps, retaining and monument walls; widening the right -turn pocket and Installing a <br />median; -and Installing street striping and slignage within Caltrans'right-of-way. <br />Lakewood BoulavardtDol Amo Boulevard Hot Spot Intersection Improvement, City of Lakewood, <br />California. Structure Engineering Task Loader responsible for overall structural design of culvert structural <br />and retaining walls, Performance of these responsibilities requires expertise and knowledge In various do - <br />sign codes such as ACI and LAGFCD for work within a concrete channel under Los Angeles county Flood <br />Control District jurisdiction, The project entailed widening Lakewood Boulevard north of Del AMD Boulevard; <br />modifying/replacing median Islands; widening Del Amo Boulevard; modifying traffic signals; relocating street <br />lights per streettmedian Island modifications, modifying a box culvert/channal wall; and extending a class I! <br />bike lane. <br />Wcomprehemlva. Innovative, Trusted, <br />A <br />Proposol for On -Call enginseling, ta <br />RFP No, 17-M <br />25E-725 <br />
The URL can be used to link to this page
Your browser does not support the video tag.