Laserfiche WebLink
CU of Sewntp Ann <br />kL <br />M" no <br />John Hidalgo, RLA <br />Landscape Architecture Task Leader <br />Profile Summary <br />Education: BS, Landscape Architecture, California State Polytechnic Unlvsrslly� Pomona <br />European Study Tout, California Polytoohnio State University, School of Architecture, Pomona <br />Registration: Landscape Architect, California No. 36611 <br />Uicensed Contractor, California C-27 No. 713013 <br />Affiliations: American Society of Landscape Architects <br />California Parks and Recreation Society <br />California Landscape Contractors Aasoclation <br />Experience. 24 Years <br />Mr. John ]Hidalgo possesses In-depth expertise In landscape architecture design development, preparation <br />of plans and specifications, plan reviews, and construction observation. Mr. Hidalgo Is familiar with various <br />local, state, and federal oodes, regulations, procedures, and standards relating to construction, safety, park <br />and facility planning, and other landscape and Irrigation amenities. He has successfully completed projects <br />ri <br />in compliance with these various standards. Mr. Hidalgo has experience representing project owners during <br />Lj <br />the plan review process, He possesses comprehensive experience In both field observation " construo- <br />tion. Mr. Hidalgo responsibilities Include managing park and street beautification design, low -impact devel- <br />r-t <br />opments, plan reviews, and construction observation. <br />Relevant Project Experience <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Landscape Architecture <br />Task Leader responsible for providing and overseeing all landscape and irrigation design required for the <br />—corridor-ImprovernanWro -"amed"trRet-to-Hunt-AvenueReftymance4��tAhese-responsibilftias-mquifed— <br />expertise and knowledge In current landscape design Ideas for drought -adaptive landscape and Irrigation <br />F <br />technology. The improvements Involved roadway widening from four to six lanes, pavement rehabilitation; <br />landscape and hardsoapa medians; median lighting; sidewalk, curb and gutter, and driveway approach re- <br />construction; ADA-oompllant ramps; parkway trees; artistic elements, corridor entrance monument, bus <br />shelter and bus turnouts; and traffic signal modification& Services provided included civil, traffic, pavement, <br />and drainage engineering; landscape architecture, survey and right-of-way engineering; and utility reloca- <br />lion. <br />Orange Line Extension, Srutoco Engillnearing & Construction, lncJLos Angeles County Metropolitan <br />Transportation Authority, Los Angeles, California, Landscape Architecture Task Leader responsible for <br />providing and overseeing all landscape and Irrigation design required for the desIgntbuild of the MOL extan� <br />sion from the Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Per- <br />formance of these reeponsibillties required expertise and knowledge In working with the City of Los Angeles <br />and the Metropolitan Transportation Authority guidelines and procedures. Wilidan prepared plans, specIfIca- <br />tions, and estimate for street widening, ralsed landscaped medians, Irrigation system, ADA access our b <br />ramps, bicycle paths, park -and -ride and parking lot facilities, traffic signal modifications, communication <br />conduits, and allinIng and striping. <br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Landscape Architec- <br />ture Task Leader responsible for providing and overseeing all landscape and Irrigation design — along with <br />Illustrative graphic concept presentations to the City Council — required for the improvements between Cerrl� <br />tos Avenue and Katella Avenue, Performance of these responsibilities required expertise and knowledge In <br />graphic design and photographic vlew simulations of before -and -after scenarlos. Improvements Involved <br />raised median, pavement delineation, landscape and Irrigation improvements, street lighting and traffic sig- <br />nal Improvements at Intersections with Florists Street and Sausalito Street. <br />W/Comprohendve. Innovative.Trusted. <br />Proposal for On -Call kniginearing, <br />F?FP No. 17-083 <br />- .1 <br />U I <br />25E-726 <br />